Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 161     Entry time: Tuesday, November 14, 2023, 12:38
Author: Nadia Jorgenson 
Category: Service Bridge 
Type: Maintenance 
Subject: Bridge Orbit Counter Work in 2023 

 All the bearings on both the upper and lower wheel were replace to see if it will improve the accuracy of the orbital position reading. See drawing SK-2489 for list of bearings used.

The encoder was also replaced to match the style used elsewhere.

ELOG V2.9.2-2455