Message ID: 192     Entry time: Friday, January 03, 2025, 10:20
Author: Adam Newsome 
Category: Infrastructure 
Type: Standard Operation 
Subject: Safety Walkaround Complete - RH Building B1 and B2 Level 

A safety walkaround was completed for the RH building B1 and B2 levels.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • B2:
    • Low on booties stock (more have been ordered)
    • Rad waste from Probes group remains in the middle of the floor (requested RPG to ask them to remove it)

Action has been taken on all deficiencies.