A safety walkaround was completed for the RH building B1 and B2 levels.
The resulting spreadsheet can be found on DocuShare as Document-242733.
Main deficiencies identified:
- B2:
- Low on booties stock (more have been ordered)
- Rad waste from Probes group remains in the middle of the floor (requested RPG to ask them to remove it)
Action has been taken on all deficiencies. |