Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 63     Entry time: Thursday, March 19, 2015, 13:14
Author: maicodallavalle 
Category: Shielding 
Type: Standard Operation 
Subject: Remote Handling B2 level Shielding door 

The Remote Handling B2 level Shielding door has been closed.

ELOG V2.9.2-2455