Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 144     Entry time: Tuesday, May 10, 2022, 11:31
Author: Nadia Jorgenson 
Category: Cyclotron 
Type: Standard Operation 
Subject: Vault Shield Door Closed 

 The vault shield door has been closed and seal inflated. The operation was performed with no issue.

ELOG V2.9.2-2455