Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 133     Entry time: Wednesday, May 05, 2021, 12:20
Author: Adam Newsome 
Category: Infrastructure 
Type: Development 
Subject: Cyclotron RH Control Room: Outlets Installed 

The following outlets were installed by Electrical Services Group in order to facilitate upgrading power supplies for Cyclotron Remote Handling, as per Work Request 5289:

  • 2x 15 Amp outlets
  • 2x 20 Amp outlets

The four breakers for these outlets are located in the panel adjacent to the main entry door to the electrical lab. The outlets are located in behind the control console.

ELOG V2.9.2-2455