Message ID: 152     Entry time: Friday, March 31, 2023, 13:22
Author: Adam Newsome 
Category: Cyclotron 
Type: Standard Operation 
Subject: Lid down operation - 2023 

The lid down operation took place on Mar. 31, 2023.

The system was energized a few minutes ahead of time.

Starting Master Synchro value: 47388. The master synchro was jogged up prior to starting to approximately 47395.

Upon startup at 10:38 am, the system worked fine and lowered the lid. No stops occurred and the lid lowered smoothly. No abnormal observations made. The lid was completely lowered at 11:05 am.

 

See attached summary.

Attachment 1: Elevation_System_Checklist_-_March_31_2023.pdf  101 kB  Uploaded Friday, March 31, 2023, 15:53  | Show | Hide all