Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 34     Entry time: Friday, January 31, 2014, 10:07
Author: Travis Cave 
Category: Cyclotron 
Type: Standard Operation 
Subject: 2C removal 

2C has been successfully removed from the cyclotron and is now currently sitting in the B2 level of the RH building. A tank access was needed to feel the stuck QDL.

ELOG V2.9.2-2455