Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Cyclotron  Not logged in ELOG logo
Message ID: 80     Entry time: Tuesday, February 09, 2016, 14:48
Author: Travis Cave 
Category: Cyclotron 
Type: Standard Operation 
Subject: shadow shields 

All shadow shields have been installed. Ladders, the pothole covers and the second rad survey will be done tomorrow.

ELOG V2.9.2-2455