Wed Feb 22 21:51:40 2017, Keerthi Jayamanna, , , SIS first beam is N1+1
|
Wed Feb 22 21:46:27 2017, Keerthi Jayamanna, , , Elog is working now
|
Mon Sep 14 11:21:16 2015, Keerthi Jayamanna, Routine, General, 20Ne+2 beam saved
|
Thu May 21 09:15:48 2015, Brian Minato, , ,
|
Wed Apr 29 07:48:22 2015, Brian Minato, Other, Other, Repair- Water leak inside HV cage
|
Mon Apr 20 08:09:03 2015, Brian Minato, Routine, General, OLIS Shutdown Update
|
Wed Dec 17 13:17:13 2014, Brian Minato, Other, Other, MCIS Update
|
Tue Nov 25 12:23:28 2014, Keerthi Jayamanna, Routine, General, 76Se+13 tune saved
|
Tue Nov 25 07:49:50 2014, Brian Minato, Other, General, MCIS and SIS Update
|
Wed Nov 19 11:34:55 2014, Raymond Dube, Routine, General, OLIS Electrical diagram with 3 I.S.
|
Tue Nov 18 08:56:23 2014, Brian Minato, Other, General, ALGA Update
|
Thu Nov 13 16:34:29 2014, Brian Minato, Other, Other, MCIS Update
|
Thu Nov 13 16:31:54 2014, Brian Minato, Other, Other, SIS
|
Wed Nov 12 13:32:47 2014, Raymond Dube, Routine, General, New in-line resistors for IOS:PE
|
Thu Nov 6 08:37:52 2014, Brian Minato, Other, Other, OLIS Update
|
Sat Nov 1 13:31:17 2014, Keerthi Jayamanna, , , MCIS readyness for 76Se
|
Fri Oct 31 20:39:56 2014, Brian Minato, Other, Other, OLIS Update
|
Thu Oct 30 23:44:57 2014, Keerthi Jayamanna, Routine, General, OLIS Supernanogan mass scan 6 to 7.5
|
Thu Oct 30 23:37:58 2014, Keerthi Jayamanna, Routine, General, Mass scan 4 to 6
|
Thu Oct 30 22:44:45 2014, Keerthi Jayamanna, Routine, General, Mass scan 3 to 4
|
Thu Oct 30 22:09:02 2014, Keerthi Jayamanna, , , Suoernanogan steering
|
Thu Oct 30 13:14:51 2014, Brian Minato, Other, Other, OLIS Update
|
Tue Oct 28 13:30:47 2014, Brian Minato, Other, Other, MCIS Update
|
Mon Oct 27 15:13:18 2014, Brian Minato, , ,
|
Fri Oct 24 10:50:20 2014, Brian Minato, Other, Other, OLIS Update
|
Thu Oct 23 10:52:21 2014, Brian Minato, Routine, General, ALGA Amplifier
|
Wed Oct 22 07:58:32 2014, Brian Minato, Other, General, MCIS Work
|
Tue Oct 21 07:14:26 2014, Brian Minato, Other, General, OLIS Work
|
Tue Oct 14 08:31:53 2014, Brian Minato, Other, General, Water Flow Switch #3
|
Fri Oct 10 14:02:56 2014, Raymond Dube, Routine, General, Test with new Alga, ALPA 50W RF AMP
|
Tue Sep 16 11:55:28 2014, Raymond Dubé, Routine, General, MCIS info  
|
Wed Aug 13 15:09:42 2014, Raymond Dubé, Routine, General, OLIS Attenuators #2 fixed, #1 gone!
|
Wed Aug 13 15:04:05 2014, Raymond Dubé, , , OLIS Bender Magnet PS (0-500 amps)
|
Wed Aug 13 15:00:27 2014, Raymond Dubé, Routine, General, OLIS Surface Source broken Ionizer Coil   
|
Fri May 16 08:44:27 2014, Raymond Dubé, Routine, General, OLIS work next week
|
Wed Jan 29 12:27:57 2014, Raymond Dubé, , , OLIS Skimmers BOP & Labels 
|
Fri Jan 24 09:15:10 2014, Raymond Dubé, , , New ISK4586D for OLIS with 3 Ion Source
|
Thu Jan 23 12:56:14 2014, Raymond Dubé, , , New & updated drawings for S.S.  
|
Wed Jan 22 10:34:58 2014, Raymond Dubé, , , IN-line 100K for IOS:YCB1A removed
|
Mon Dec 17 14:10:22 2012, Keerthi Jayamanna, , , Gas flow controller fault
|
Mon Dec 17 14:08:52 2012, Keerthi Jayamanna, , , IRIS beam delivary is completed
|
Fri Dec 14 17:30:47 2012, Keerthi Jayamanna, , , 18OH2 and 40Ar+2 delivary
|
Sun Dec 2 23:36:13 2012, Keerthi Jayamanna, Routine, General, 16O+2 is ready for tuning.
|
Sun Dec 2 22:34:09 2012, Keerthi Jayamanna, , , Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam
|
Sun Dec 2 22:32:19 2012, Keerthi Jayamanna, Routine, General, Still cannot write anything other than Subject
|
Wed May 23 17:11:57 2012, Keerthi Jayamanna, , , Changed beam to 12C++ beam
|
Thu Nov 10 09:57:57 2011, Damien Gallop, , , OLIS Shutdown
|
Wed Nov 9 11:40:35 2011, Damien Gallop, , , OLIS Shutdown 
|
Tue Nov 8 10:02:54 2011, Damien Gallop, , , OLIS Shutdown    
|
Mon Nov 7 09:58:17 2011, Damien Gallop, , , OLIS Shutdown 
|
Fri Nov 4 09:41:32 2011, Damien Gallop, , , OLIS Shutdown
|
Thu Nov 3 09:50:05 2011, Damien Gallop, , , OLIS Shutdown
|
Wed Nov 2 10:16:49 2011, Damien Gallop, , , OLIS Shutdown
|
Tue Nov 1 10:18:02 2011, Damien Gallop, , , OLIS Shutdown
|
Mon Oct 31 11:06:58 2011, Damien Gallop, , , OLIS Shutdown
|
Mon Oct 31 11:04:06 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON EOB
|
Fri Oct 28 10:18:53 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON
|
Wed Oct 26 10:17:53 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON 
|
Tue Oct 25 09:41:32 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON
|
Mon Oct 24 10:10:34 2011, Damien Gallop, , , 33S+6 from MCIS to DRAGON
|
Wed Oct 19 09:53:27 2011, Damien Gallop, , , 33S from MCIS to HE Development Setup
|
Tue Oct 18 10:27:44 2011, Damien Gallop, , , 19F/38Ar from MCIS for Beam Development
|
Mon Oct 17 11:33:03 2011, Damien Gallop, , , 19F/38Ar from MCIS for Beam Development
|
Thu Oct 13 11:11:14 2011, Damien Gallop, , , 14N+2 from MWS to SEBT for Beam Development
|
Thu Oct 6 15:15:09 2011, Damien Gallop, , , 19F/40Ar from MCIS for Beam Development
|
Wed Oct 5 10:11:28 2011, Damien Gallop, , , 33S from MCIS Source Development
|
Tue Oct 4 10:37:38 2011, Damien Gallop, , , 33S from MCIS Source Development Setup 
|
Mon Oct 3 10:08:50 2011, Damien Gallop, , , 116Sn+18 & 118Sn+19 from MCIS for Development 
|
Thu Sep 29 10:50:30 2011, Damien Gallop, , , 36/40Ar development with MCIS
|
Wed Sep 28 11:56:15 2011, Damien Gallop, , , 36/40Ar development with MCIS
|
Tue Sep 27 13:29:23 2011, Damien Gallop, , , 36/40Ar development with MCIS
|
Mon Sep 26 09:47:12 2011, Damien Gallop, , , 13C+3 from MCIS to TACTIC 
|
Fri Sep 23 14:59:14 2011, Damien Gallop, , , 14N+3 & 17O+3 from MCIS to TACTIC at HEBT  
|
Mon Sep 19 10:27:36 2011, Damien Gallop, , , 116Sn+18 & 118Sn+19 from MCIS to TIGRESS
|
Fri Sep 16 10:02:33 2011, Damien Gallop, , , 116Sn+18 & 118Sn+19 from MCIS to TIGRESS
|
Thu Sep 15 12:09:25 2011, Damien Gallop, , , 116Sn+18 & 118Sn+19 from MCIS to TIGRESS Setup  
|
Thu Sep 15 11:29:39 2011, Damien Gallop, , , 12C+2 from MCIS to DRAGON EOB
|
Wed Sep 14 10:00:05 2011, Damien Gallop, , , 12C+2 from MCIS to DRAGON
|
Tue Sep 13 10:00:56 2011, Damien Gallop, , , 12C+2 from MCIS to DRAGON
|
Mon Sep 12 10:07:36 2011, Damien Gallop, , , 12C+2 from MCIS to DRAGON Setup 
|
Mon Sep 12 10:04:42 2011, Damien Gallop, , , 4He from MCIS to DRAGON EOB 
|
Thu Sep 8 11:21:45 2011, Damien Gallop, , , 4He from MCIS to DRAGON Setup
|
Wed Sep 7 09:50:20 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN
|
Tue Sep 6 16:37:24 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN
|
Fri Sep 2 10:04:55 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN 9x
|
Thu Sep 1 10:01:25 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN
|
Wed Aug 31 12:12:39 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN Setup 
|
Tue Aug 30 16:40:14 2011, Damien Gallop, , , 58Ni1+ from MWS to TITAN Setup  
|
Tue Aug 30 10:01:30 2011, Damien Gallop, , , 17O3+ from MCIS Reserved
|
Mon Aug 29 10:03:05 2011, Damien Gallop, , , 17O3+ from MCIS to DRAGON
|
Thu Aug 25 10:54:34 2011, Damien Gallop, , , 17O3+ from MCIS to DRAGON    
|
Wed Aug 24 10:49:41 2011, Damien Gallop, , , 17O3+ from MCIS to DRAGON  
|
Mon Aug 22 09:49:34 2011, Damien Gallop, , , 17O3+ from MCIS to DRAGON
|
Fri Aug 19 10:01:52 2011, Damien Gallop, , , 17O3+ from MCIS to DRAGON 
|
Mon Aug 15 10:19:18 2011, Damien Gallop, , , 84Kr from MWS to TITAN 
|
Mon Aug 8 17:08:28 2011, Damien Gallop, , , Supernanogan MRO 
|
Wed Aug 3 00:15:39 2011, Keerthi Jayamanna, Other, General, 22Ne+2
|
Fri Jul 22 15:56:08 2011, Damien Gallop, , , 27Al+1 from MWS for DRAGON status
|
Wed Jul 20 01:37:46 2011, Keerthi Jayamanna, , , Al beam development:
|
Tue Jul 19 17:02:44 2011, Damien Gallop, , , 27Al+1 from MCIS Setup
|
Mon Jul 18 10:02:42 2011, Damien Gallop, , , 24Mg+6 from MWS for DRAGON  
|
Mon Jul 18 09:53:05 2011, Damien Gallop, , , 4He from MCIS to HERACLES done Saturday and Sunday
|
Fri Jul 15 10:30:11 2011, Damien Gallop, , , 24/25Mg+1 from MWS for HERACLES on SEBT1    
|
Mon Jul 11 09:46:07 2011, Damien Gallop, , , 24/25Mg+1 from MWS for HERACLES on SEBT1
|
Fri Jul 8 10:07:14 2011, Damien Gallop, , , 24/25Mg+1 from MWS for HERACLES on SEBT1 8x
|
Thu Jul 7 10:40:27 2011, Damien Gallop, , , 24/25Mg+1 from MWS Setup 6x
|
Wed Jul 6 13:20:15 2011, Damien Gallop, , , 24/25Mg+1 from MWS Setup 
|
Wed Jul 6 09:56:45 2011, Damien Gallop, , , 27Al+1 from MWS for DRAGON EOB 13x
|
Sun Jul 3 09:56:47 2011, Damien Gallop, , , 27Al+1 from MWS Setup    
|
Thu Jun 30 10:02:08 2011, Damien Gallop, , , 27Al+1 from MWS Setup   
|
Wed Jun 29 15:49:16 2011, Damien Gallop, , , 27Al+1 from MWS Setup
|
Wed Jun 29 09:45:50 2011, Damien Gallop, , , 58Ni from MCIS to TITAN 8x
|
Tue Jun 28 09:32:09 2011, Damien Gallop, , , 58Ni from MCIS to TITAN
|
Mon Jun 27 10:20:41 2011, Damien Gallop, , , 58Ni from MCIS to TITAN 
|
Fri Jun 24 15:11:20 2011, Damien Gallop, , , 58Ni from MCIS to FC6 Setup
|
Fri Jun 10 11:35:24 2011, Damien Gallop, , , 22Ne2+ for TUDA-II Pilot Beam
|
Thu Jun 9 16:51:09 2011, Damien Gallop, , , 22Ne2+ for TUDA-II Pilot Beam    
|
Mon May 30 14:44:01 2011, Damien Gallop, , , 22Ne2+ for ICR Training
|
Mon May 2 10:50:28 2011, Damien Gallop, , , Alkalis for DRAGON EOB 7x
|
Fri Apr 1 17:02:09 2011, Damien Gallop, , , 12C2+ for Startup
|
Tue Mar 29 15:32:08 2011, Damien Gallop, , , Controls and Panel MRO
|
Fri Mar 25 17:42:38 2011, Keerthi Jayamanna, , , OLIS HV start up
|
Wed Mar 9 11:09:02 2011, Keerthi Jayamanna, , , IOS:SSW failed
|
Sat Feb 26 22:06:03 2011, Keerthi Jayamanna, , , Ti+7 status
|
Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test
|
Fri Feb 25 17:27:11 2011, Keerthi Jayamanna, , , Titaniums efficiency test
|
Wed Feb 23 22:29:48 2011, Keerthi Jayamanna, , , OLIS mahnet
|
Tue Feb 22 18:54:43 2011, Keerthi Jayamanna, , , EE and SSEE
|
Tue Feb 22 18:52:53 2011, Keerthi Jayamanna, , , Ti+7 efficiency studies
|
Fri Feb 18 11:43:32 2011, Keerthi Jayamanna, , , IOS: EE Status
|
Fri Feb 18 11:05:50 2011, Keerthi Jayamanna, , , OLIS Problems
|
Fri Dec 24 13:06:07 2010, Damien Gallop, , , Merry Christmas and Happy New Year
|
Tue Dec 21 09:43:22 2010, Damien Gallop, , , In Memoriam... Mike McDonald
|
Mon Dec 20 09:50:07 2010, Damien Gallop, , , MCIS Development & EOB   
|
Fri Dec 17 09:18:57 2010, Damien Gallop, , , MCIS Development
|
Wed Dec 15 09:18:41 2010, Damien Gallop, , , MCIS Development
|
Tue Dec 14 09:15:58 2010, Damien Gallop, , , MCIS Development
|
Tue Dec 7 08:57:26 2010, Damien Gallop, , , 80Kr14+/40Ar7+ for SEBT Development
|
Mon Dec 6 09:08:52 2010, Damien Gallop, , , 80Kr14+/40Ar7+ for SEBT Development    
|
Fri Dec 3 09:37:14 2010, Damien Gallop, , , 12C2+ for Commissioning 15x
|
Thu Dec 2 10:02:46 2010, Damien Gallop, , , 12C2+ for Commissioning 14x
|
Wed Dec 1 08:51:54 2010, Damien Gallop, , , 12C2+ for Commissioning
|
Tue Nov 30 08:47:47 2010, Damien Gallop, , , 12C2+ for Commissioning
|
Mon Nov 29 08:55:35 2010, Damien Gallop, , , 12C2+ for Commissioning
|
Thu Nov 25 11:50:14 2010, Damien Gallop, , , 12C2+ for Commissioning
|
Wed Nov 24 17:08:41 2010, Damien Gallop, , , 12C2+ for SEBT Commissioning
|
Wed Nov 24 14:02:14 2010, Damien Gallop, , , 85Rb for TITAN  
|
Tue Nov 23 10:31:27 2010, Damien Gallop, , , 85Rb for TITAN
|
Wed Nov 10 09:18:31 2010, Damien Gallop, , , 12C2+ for DRAGON 
|
Tue Nov 9 08:42:38 2010, Damien Gallop, , , 12C2+ for DRAGON 
|
Mon Nov 8 09:37:03 2010, Damien Gallop, , , 12C2+ for DRAGON
|
Fri Nov 5 09:23:53 2010, Damien Gallop, , , 85Rb for Polarizer
|
Thu Nov 4 09:18:15 2010, Damien Gallop, , , 85Rb for Polarizer
|
Wed Nov 3 09:22:38 2010, Damien Gallop, , , 85Rb for Polarizer 
|
Tue Nov 2 09:25:30 2010, Damien Gallop, , , MWS Development 
|
Mon Nov 1 09:30:15 2010, Damien Gallop, , , MWS Development   
|
Fri Oct 29 09:41:20 2010, Damien Gallop, , , MWS Development 6x
|
Thu Oct 28 17:51:49 2010, Damien Gallop, , , MWS switchover for scheduled 85/87Rb beams
|
Thu Oct 28 17:51:49 2010, Damien Gallop, , , MWS switchover for scheduled 85/87Rb beams
|
Wed Oct 27 09:21:59 2010, Damien Gallop, , , 26Mg6+ for TIGRESS EOB 16x
|
Tue Oct 26 09:19:39 2010, Damien Gallop, , , 26Mg6+ for TIGRESS
|
Mon Oct 25 09:05:15 2010, Damien Gallop, , , 26Mg6+ for TIGRESS
|
Fri Oct 22 09:35:24 2010, Damien Gallop, , , 26Mg6+ for TIGRESS
|
Thu Oct 21 11:46:14 2010, Damien Gallop, , , 26Mg6+ for TIGRESS
|
Wed Oct 20 11:30:32 2010, Damien Gallop, , , 26Mg6+ for TUDA-II  
|
Tue Oct 19 09:20:40 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Mon Oct 18 09:22:35 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Fri Oct 15 09:23:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams
|
Wed Oct 13 16:15:03 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams
|
Tue Oct 12 13:25:21 2010, Damien Gallop, , , MWS switchover for scheduled 24/26Mg beams 
|
Fri Oct 8 09:35:03 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS
|
Mon Oct 4 09:46:12 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS setup
|
Mon Oct 4 09:40:30 2010, Damien Gallop, , , OLIS Maintenance and Development completed
|
Fri Sep 24 13:22:00 2010, Damien Gallop, , , OLIS Maintenance and Development
|
Thu Sep 23 09:20:34 2010, Damien Gallop, , , 4He1+ for DRAGON   
|
Mon Sep 20 09:34:44 2010, Damien Gallop, , , 4He1+ for DRAGON
|
Fri Sep 17 14:02:29 2010, Damien Gallop, , , MCIS Development    
|
Thu Sep 16 17:06:22 2010, Damien Gallop, , , MCIS Development 
|
Tue Sep 14 09:18:28 2010, Damien Gallop, , , MCIS Development 8x
|
Fri Sep 10 10:38:13 2010, Damien Gallop, , , 16O3+ for DRAGON
|
Fri Aug 13 09:27:49 2010, Damien Gallop, , , 4He1+ for SCC Development
|
Wed Aug 11 10:35:03 2010, Damien Gallop, , , 4He1+ for SCC Development
|
Tue Aug 10 09:30:36 2010, Damien Gallop, , , 4He1+ for SCC Development
|
Mon Aug 9 10:38:43 2010, Damien Gallop, , , 4He1+ Setup for SCC Development
|
Mon Aug 9 09:09:36 2010, Damien Gallop, , , 35Cl2+ for DRAGON 
|
Fri Aug 6 09:50:22 2010, Damien Gallop, , , 35Cl2+ setup for DRAGON 6x
|
Thu Aug 5 18:56:48 2010, Damien Gallop, , , 35Cl2+ setup for DRAGON
|
Thu Aug 5 17:47:04 2010, Damien Gallop, , , 16O3+ for TIGRESS EOB Tuesday a.m.
|
Tue Aug 3 09:31:30 2010, Damien Gallop, , , 16O3+ for TIGRESS
|
Fri Jul 30 09:09:35 2010, Damien Gallop, , , 16O3+ for TIGRESS   
|
Thu Jul 29 18:12:38 2010, Damien Gallop, , , 16O3+ Setup 6x
|
Thu Jul 29 15:31:21 2010, Damien Gallop, , , 4He1+ for TIGRESS
|
Wed Jul 28 09:23:57 2010, Damien Gallop, , , 4He1+ for TIGRESS
|
Tue Jul 27 08:55:49 2010, Damien Gallop, , , OLIS Maintenance  
|
Mon Jul 26 09:41:46 2010, Damien Gallop, , , 74Ge1+ to TITAN
|
Fri Jul 23 13:00:04 2010, Damien Gallop, , , 74Ge1+ to TITAN 
|
Thu Jul 22 09:25:21 2010, Damien Gallop, , , 74Ge1+ to TITAN
|
Tue Jul 20 09:38:45 2010, Damien Gallop, , , OLIS Maintenance
|
Mon Jul 19 10:56:53 2010, Damien Gallop, , , 12C2+ for TIGRESS
|
Fri Jul 16 10:22:35 2010, Damien Gallop, , , 12C2+ for TIGRESS
|
Wed Jul 14 09:23:19 2010, Damien Gallop, , , 12C2+ for TIGRESS
|
Tue Jul 13 18:33:04 2010, Damien Gallop, , , OLIS Maintenance and Development
|
Mon Jul 12 10:55:14 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Fri Jul 9 10:00:03 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning 8x
|
Thu Jul 8 09:38:36 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Wed Jul 7 15:21:36 2010, Damien Gallop, , , 16O1+ for SCC Commissioning
|
Tue Jul 6 19:10:33 2010, Damien Gallop, , , OLIS Maintenance
|
Tue Jul 6 08:57:33 2010, Damien Gallop, , , 26Mg6+ for TIGRESS EOB  
|
Mon Jul 5 11:58:49 2010, Damien Gallop, , , 26Mg6+ for TIGRESS
|
Wed Jun 30 09:11:25 2010, Damien Gallop, , , 24Mg5+ to TIGRESS 
|
Tue Jun 29 09:16:33 2010, Damien Gallop, , , 24Mg5+ to TIGRESS 6x
|
Mon Jun 28 09:19:16 2010, Damien Gallop, , , 24Mg5+ to TIGRESS
|
Thu Jun 24 11:52:34 2010, Damien Gallop, , , 24Mg5+ to TIGRESS setup
|
Wed Jun 23 09:17:34 2010, Damien Gallop, , , 24Mg5+ to TIGRESS setup   
|
Tue Jun 22 08:42:33 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Mon Jun 21 09:20:30 2010, Damien Gallop, , , 26Mg6+ for TUDA-II 
|
Thu Jun 17 09:21:56 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Wed Jun 16 10:12:58 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Mon Jun 14 09:44:06 2010, Damien Gallop, , , 26Mg6+ for TUDA-II
|
Sat Jun 12 11:23:40 2010, Damien Gallop, , , 26Mg6+ to TUDA-II source setup
|
Sat Jun 12 10:20:14 2010, Damien Gallop, , , 15N4+ to TIGRESS done 13x
|
Fri Jun 11 09:21:24 2010, Damien Gallop, , , 15N4+ to TIGRESS
|
Thu Jun 10 09:17:42 2010, Damien Gallop, , , 15N4+ to TIGRESS  
|
Wed Jun 9 10:07:33 2010, Damien Gallop, , , 15N4+ to TIGRESS
|
Tue Jun 8 09:27:54 2010, Damien Gallop, , , 15N4+ to TIGRESS 
|
Mon Jun 7 10:36:14 2010, Damien Gallop, , , 15N setup over the weekend
|
Fri Jun 4 09:30:48 2010, Damien Gallop, , , 33S to DRAGON
|
Thu Jun 3 09:29:11 2010, Damien Gallop, , , 33S to DRAGON
|
Wed Jun 2 09:19:04 2010, Damien Gallop, , , 33S to DRAGON
|
Tue Jun 1 09:12:39 2010, Damien Gallop, , , 33S to DRAGON
|
Mon May 31 09:18:39 2010, Damien Gallop, , , 33S to DRAGON
|
Fri May 28 11:02:59 2010, Damien Gallop, , , 33S to DRAGON
|
Thu May 27 09:11:10 2010, Damien Gallop, , , 33S Development and Handover
|
Wed May 26 18:16:10 2010, Damien Gallop, , , 33S Development
|
Tue May 25 22:02:41 2010, Keerthi Jayamanna, , , 33S spectrum
|
Tue May 25 11:58:02 2010, Keerthi Jayamanna, , , 33S dev
|
Tue May 25 11:28:00 2010, Keerthi Jayamanna, , , 33D dev
|
Tue May 25 00:19:18 2010, Keerthi Jayamanna, , , 33S
|
Mon May 24 22:42:51 2010, Keerthi Jayamanna, , , 33S development
|
Wed May 19 09:55:51 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS
|
Tue May 18 09:15:16 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for TIGRESS setup 8x
|
Tue May 18 09:03:32 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1 EOB  
|
Mon May 17 09:09:50 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Fri May 14 08:50:56 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Thu May 13 09:25:38 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1 
|
Wed May 12 13:40:01 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1 
|
Tue May 11 08:55:41 2010, Damien Gallop, , , Supernanogan development   
|
Mon May 10 16:42:55 2010, Damien Gallop, , , Supernanogan development
|
Mon May 10 09:39:34 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Fri May 7 19:10:05 2010, Keerthi Jayamanna, Routine, General, OLIS status
|
Fri May 7 12:29:41 2010, Keerthi Jayamanna, , , Supernanogan development
|
Thu May 6 14:33:07 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Wed May 5 09:46:40 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Tue May 4 14:19:18 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Mon May 3 18:12:12 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Fri Apr 30 13:02:17 2010, Damien Gallop, , , 22Ne2+ at 22.44keV for SEBT1
|
Fri Apr 30 12:58:21 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2  
|
Thu Apr 29 09:11:27 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2
|
Wed Apr 28 10:08:05 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2
|
Tue Apr 27 09:04:13 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2  
|
Mon Apr 26 10:58:46 2010, Damien Gallop, , , 16O1+ at 32.64keV to SEBT2
|
Fri Apr 23 10:18:32 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Thu Apr 22 14:57:25 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Wed Apr 21 15:30:09 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Tue Apr 20 09:02:18 2010, Damien Gallop, , , OLIS Maintenance  
|
Mon Apr 19 17:12:55 2010, Damien Gallop, , , OLIS Maintenance
|
Mon Apr 19 10:11:17 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning 
|
Fri Apr 16 09:26:01 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Thu Apr 15 09:39:11 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Wed Apr 14 17:28:32 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Tue Apr 13 10:20:27 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Mon Apr 12 11:53:22 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning 
|
Thu Apr 1 09:23:08 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Wed Mar 31 09:43:30 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Tue Mar 30 10:27:09 2010, Damien Gallop, , , 16O1+ at 32.64keV for accelerator commissioning
|
Mon Mar 29 12:15:00 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Fri Mar 26 09:31:04 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Thu Mar 25 12:43:16 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Wed Mar 24 11:42:32 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Fri Mar 19 09:00:21 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning
|
Wed Mar 17 09:25:27 2010, Damien Gallop, , , 20Ne1+ at 40.8keV for accelerator commissioning  
|
Fri Mar 12 11:35:34 2010, Keerthi, , , Cusp water cooling
|
Fri Mar 12 11:33:09 2010, Keerthi, , , IOS:IG!
|
Thu Mar 11 23:02:18 2010, Keerthi, , , OLIS status after shutdown
|
Fri Feb 19 17:54:40 2010, Damien Gallop, , , OLIS Shutdown in progress 
|
Wed Feb 17 18:28:33 2010, Damien Gallop, , , OLIS Shutdown in progress
|
Tue Feb 16 16:04:18 2010, Damien Gallop, , , OLIS Shutdown in progress
|
Fri Feb 12 14:42:06 2010, Damien Gallop, , , OLIS Shutdown in progress 8x
|
Wed Feb 10 17:18:24 2010, Damien Gallop, , , OLIS Shutdown in progress
|
Wed Feb 3 16:30:02 2010, Damien Gallop, , , OLIS Shutdown began today
|
Tue Feb 2 10:06:41 2010, Damien Gallop, , , Supernanogan development wind-up 9x
|
Fri Jan 15 15:30:02 2010, keerthi, , , Supernanogan oven start up
|
Thu Jan 14 09:57:05 2010, Damien Gallop, , , 20Ne1+ beam from MWS for 8pi diagnosis 9x
|
Wed Jan 13 18:16:22 2010, Damien Gallop, , , OLIS development with MWS at 28keV 6x
|
Mon Jan 11 17:46:31 2010, Damien Gallop, , , OLIS development for 4He2+ beam loose ends  
|
Mon Jan 11 17:40:07 2010, Damien Gallop, , , Happy New Year!
|
Thu Dec 24 10:13:00 2009, Damien Gallop, , , OLIS development 20Ne1+ from MWS
|
Wed Dec 23 11:09:37 2009, Damien Gallop, , , OLIS development 7x
|
Mon Dec 21 10:22:33 2009, Damien Gallop, , , OLIS development for CUSP source - installation cont'd 
|
Fri Dec 18 13:14:01 2009, Damien Gallop, , , OLIS development for CUSP source continued 9x
|
Wed Dec 16 14:07:37 2009, Damien Gallop, , , OLIS development for CUSP source continued   
|
Tue Dec 15 17:50:38 2009, Damien Gallop, , , OLIS development for CUSP source continued
|
Mon Dec 14 10:01:52 2009, Damien Gallop, , , OLIS development for CUSP source continued
|
Fri Dec 11 18:03:30 2009, Damien Gallop, , , OLIS development for CUSP source continued
|
Thu Dec 10 08:59:05 2009, Damien Gallop, , , OLIS development for CUSP source continued 
|
Wed Dec 9 10:24:45 2009, Damien Gallop, , , OLIS development for CUSP source continued    
|
Tue Dec 8 12:40:17 2009, Damien Gallop, , , OLIS development for CUSP source continued 
|
Mon Dec 7 09:48:24 2009, Damien Gallop, , , OLIS development for CUSP source continued
|
Fri Dec 4 18:15:19 2009, Damien Gallop, , , OLIS development for CUSP source - gas lines & water
|
Fri Dec 4 09:58:08 2009, Damien Gallop, , , 20Ne1+ at 28keV for 8pi delivery complete    
|
Thu Dec 3 14:12:56 2009, Damien Gallop, , , 20Ne1+ at 28keV for 8pi delivery continues
|
Wed Dec 2 19:03:55 2009, Damien Gallop, , , 20Ne1+ at 28keV for 8pi delivery
|
Tue Dec 1 12:33:58 2009, Damien Gallop, , , 20Ne1+ at 28keV for 8pi 8x
|
Tue Dec 1 09:27:17 2009, Damien Gallop, , , OLIS development for CUSP source - first overnight running 
|
Mon Nov 30 16:53:31 2009, Damien Gallop, , , 20Ne1+ to 8pi planned for tomorrow
|
Mon Nov 30 15:41:00 2009, Damien Gallop, , , OLIS development for CUSP source - initial tests
|
Mon Nov 30 15:41:00 2009, Damien Gallop, , , OLIS development for CUSP source - initial tests
|
Fri Nov 27 13:36:09 2009, Damien Gallop, , , OLIS development for CUSP source - installation cont'd
|
Thu Nov 26 16:08:42 2009, Damien Gallop, , , OLIS development for CUSP source - installation cont'd
|
Thu Nov 26 06:22:58 2009, Keerthi Jayamanna, , , Cusp source
|
Thu Nov 26 06:20:21 2009, Keerthi Jayamanna, , , Supernanogan Development
|
Tue Nov 24 13:55:55 2009, Damien Gallop, , , OLIS development for CUSP source - installation cont'd
|
Mon Nov 23 10:32:34 2009, Damien Gallop, , , OLIS development for CUSP source - installation cont'd
|
Fri Nov 20 17:26:57 2009, Damien Gallop, , , OLIS development for CUSP source - installation
|
Thu Nov 19 11:14:19 2009, Damien Gallop, , , OLIS development for CUSP source
|
Wed Nov 18 23:46:14 2009, Keerthi Jayamanna, , , OLIS development started
|
Tue Nov 17 09:18:37 2009, Damien Gallop, , , 21Ne4+ to DRAGON for charge distribution studies   
|
Mon Nov 16 10:00:41 2009, Damien Gallop, , , 17O3+ beam to DRAGON end of run this morning
|
Fri Nov 13 10:26:07 2009, Damien Gallop, , , 17O3+ beam to DRAGON continuing 
|
Tue Nov 10 09:36:39 2009, Damien Gallop, , , 17O3+ beam to DRAGON continuing
|
Mon Nov 9 09:30:10 2009, Damien Gallop, , , 17O3+ beam to DRAGON
|
Sat Nov 7 12:21:35 2009, Keerthi Jayamanna, , , 17O hand valve status
|
Fri Nov 6 11:17:54 2009, Damien Gallop, , , 17O3+ setup to DRAGON
|
Thu Nov 5 09:45:03 2009, Damien Gallop, , , MCIS online with 17O3+ on FC6 overnight
|
Wed Nov 4 09:46:07 2009, Damien Gallop, , , MCIS online with 17O3+ on FC6 for development 9x
|
Tue Nov 3 09:25:31 2009, Damien Gallop, , , MCIS online with 17O3+ on FC6 overnight
|
Mon Nov 2 17:42:54 2009, Damien Gallop, , , MCIS online with 17O3+ on FC6
|
Mon Nov 2 09:32:40 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 over the weekend   
|
Fri Oct 30 09:44:49 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight   
|
Thu Oct 29 09:42:23 2009, Damien Gallop, , , IOSIOC work in progress
|
Wed Oct 28 09:55:28 2009, Damien Gallop, , , Planned IOSIOC reboot 
|
Wed Oct 28 09:33:51 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight cont'd
|
Tue Oct 27 09:22:14 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight   
|
Mon Oct 26 10:56:52 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 over the weekend
|
Fri Oct 23 09:55:41 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight cont'd 
|
Thu Oct 22 15:54:24 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight cont'd  
|
Wed Oct 21 11:01:37 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight cont'd
|
Tue Oct 20 09:25:29 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6 overnight
|
Mon Oct 19 10:09:13 2009, Damien Gallop, , , MCIS on with 33S5+ on FC6
|
Thu Oct 15 21:06:10 2009, Keerthi, , , OLIS status
|
Thu Oct 15 09:43:00 2009, Damien Gallop, , , MCIS development with 33S5+
|
Wed Oct 14 12:06:46 2009, Damien Gallop, , , MCIS development with 33S5+
|
Wed Oct 14 09:52:09 2009, Damien Gallop, , , MCIS development with 33S5+ today
|
Tue Oct 13 14:14:17 2009, Damien Gallop, , , MCIS setup for 33S5+   
|
Sun Oct 11 17:11:31 2009, Keerthi, , , MCIS turbo pumps power levels
|
Sun Oct 11 17:09:52 2009, Keerthi, , , Vacuum with IOS:IV7
|
Sun Oct 11 13:17:37 2009, Keerthi, , , Neon Leak closed
|
Sun Oct 11 13:16:39 2009, Keerthi, , , MCIS:TP3 was off
|
Fri Oct 9 16:33:45 2009, Keerthi, , , 33S development
|
Thu Oct 8 09:39:52 2009, Damien Gallop, , , CSB Development with MCIS
|
Wed Oct 7 16:54:33 2009, Keerthi, , ,
|
Tue Oct 6 15:28:31 2009, Keerthi, , , OLIS A/Q changed to 5 (20Ne+4)
|
Tue Oct 6 15:22:43 2009, Damien Gallop, , , 22Ne4+ & 20Ne4+ operation
|
Sun Oct 4 19:16:46 2009, Keerthi, , , OLIS status
|
Fri Oct 2 15:58:36 2009, Keerthi, , , 17O and Ne gases are now connected
|
Fri Oct 2 09:38:26 2009, Keerthi, Routine, General, 33Sulfur development completed successfully.
|
Wed Sep 30 15:30:04 2009, Damien Gallop, , , 33S6+ from MCIS for DRAGON setup 
|
Mon Sep 28 14:16:47 2009, Damien Gallop, , , MCIS Cart down for TP1 Replacement
|
Mon Sep 28 14:12:17 2009, Damien Gallop, , , 33S5+ from MCIS on Friday 25-Sep-2009
|
Wed Sep 16 18:14:29 2009, Damien Gallop, , , Test scans for publication 2 19x
|
Wed Sep 16 12:48:13 2009, Keerthi, , , 17O+5 double peaks    
|
Wed Sep 16 12:26:51 2009, Keerthi, Routine, General, 17O+3 emittance with changed steering
|
Wed Sep 16 12:20:10 2009, Keerthi, , , 17O+3 emittance with increased EL
|
Wed Sep 16 12:12:04 2009, Keerthi, Routine, General, 17O+3 emittance sacns
|
Tue Sep 15 20:02:46 2009, Keerthi, , , 17O8+ on FC6 from MCIS
|
Tue Sep 15 19:46:21 2009, Keerthi, Routine, General, Supernanogan emittance scans 9x
|
Tue Sep 15 16:56:03 2009, Damien Gallop, , , Test scans for publication  
|
Tue Sep 15 16:09:31 2009, Damien Gallop, , , MCIS Development 17O emittance scans 13x
|
Tue Sep 15 10:32:39 2009, Damien Gallop, , , MCIS Development 7x
|
Tue Sep 15 09:54:22 2009, Damien Gallop, , , 16O3+ run to DRAGON ended on schedule at 08:00 8x
|
Fri Sep 11 23:42:45 2009, Keerthi, Other, General, MCIS turbo pump
|
Tue Sep 8 15:14:45 2009, Damien Gallop, , , Back from vacation  
|
Tue Aug 18 11:16:16 2009, Damien Gallop, , , MCIS "PV" PLC trip overnight  
|
Mon Aug 17 15:53:54 2009, Damien Gallop, , , MCIS mass scans & initial emittance scans 11x
|
Mon Aug 17 13:58:35 2009, Damien Gallop, , , Supernanogan Development begins today for one week 
|
Fri Aug 14 13:53:34 2009, Damien Gallop, , , MWS 25Mg end of run data 10x
|
Tue Aug 11 09:54:28 2009, Damien Gallop, , , MWS 25Mg operation overnight & MCIS cart installation 
|
Mon Aug 10 18:29:32 2009, Damien Gallop, , , MWS source trip & restart
|
Mon Aug 10 18:06:09 2009, Damien Gallop, , , MWS 25Mg reduce intensity with PE
|
Mon Aug 10 17:42:18 2009, Damien Gallop, , , MWS 25Mg emittance scan with original settings 6x
|
Mon Aug 10 17:20:55 2009, Damien Gallop, , , MWS 25Mg emittance scan with zeroed vertical steerers   
|
Mon Aug 10 17:16:20 2009, Damien Gallop, , , MWS 25Mg emittance scan with downstream quads off   
|
Mon Aug 10 16:43:59 2009, Damien Gallop, , , MWS 25Mg emittance scan with slits open  
|
Mon Aug 10 16:36:33 2009, Damien Gallop, , , MWS 25Mg emittance scans    
|
Mon Aug 10 16:12:28 2009, Damien Gallop, , , MWS 25Mg operation over the weekend 
|
Fri Aug 7 14:42:29 2009, Damien Gallop, , , MWS 25Mg beam reduction   
|
Fri Aug 7 10:16:38 2009, Damien Gallop, , , MWS 25Mg emittance scans 6x
|
Thu Aug 6 17:02:00 2009, Damien Gallop, , , MWS 25Mg tuning to TIGRESS in progress 7x
|
Wed Aug 5 11:29:51 2009, Damien Gallop, , , MWS operation overnight and 25Mg status    
|
Tue Aug 4 11:13:04 2009, Damien Gallop, , , MWS source tuning for 25Mg operation 6x
|
Mon Aug 3 08:39:31 2009, Damien Gallop, , , MWS 21Ne -> 25Mg switchover 
|
Mon Jul 27 14:39:22 2009, Damien Gallop, , , 21Ne5+ to TUDA-II
|
Wed Jul 22 14:31:28 2009, Damien Gallop, , , 21Ne setup to TUDA-II is underway 
|
Wed Jul 22 01:33:29 2009, Damien Gallop, , , MWS initial startup summary
|
Tue Jul 21 17:11:33 2009, Damien Gallop, , , MWS preparations for 21Ne operation
|
Mon Jul 20 17:28:01 2009, Damien Gallop, , , MCIS cart removed from cage and parked
|
Mon Jul 20 09:25:35 2009, Damien Gallop, , , 18O4+ run to TIGRESS complete    
|
Fri Jul 17 11:10:21 2009, Damien Gallop, , , Supernanogan development done 6x
|
Fri Jul 17 10:46:06 2009, Damien Gallop, , , 16O6+ recheck    
|
Fri Jul 17 10:32:42 2009, Damien Gallop, , , 16O8+ recheck
|
Fri Jul 17 10:30:27 2009, Damien Gallop, , , 16O7+ recheck
|
Fri Jul 17 10:28:09 2009, Damien Gallop, , , 18O7+ recheck
|
Fri Jul 17 10:03:07 2009, Damien Gallop, , , 18O6+ recheck  
|
Fri Jul 17 09:47:16 2009, Damien Gallop, , , 18O8+ recheck
|
Fri Jul 17 09:33:09 2009, Damien Gallop, , , Supernanogan epilogue 
|
Thu Jul 16 17:15:50 2009, Damien Gallop, , , 16/18On+ survey summary
|
Thu Jul 16 17:09:52 2009, Damien Gallop, , , 18O1+ survey  
|
Thu Jul 16 17:05:29 2009, Damien Gallop, , , 16O1+ survey  
|
Thu Jul 16 16:50:41 2009, Damien Gallop, , , 18O2+ survey  
|
Thu Jul 16 16:40:11 2009, Damien Gallop, , , 16O2+ survey  
|
Thu Jul 16 16:33:28 2009, Damien Gallop, , , 18O3+ survey  
|
Thu Jul 16 16:15:39 2009, Damien Gallop, , , 16O3+ survey  
|
Thu Jul 16 15:58:53 2009, Damien Gallop, , , 18O4+ survey  
|
Thu Jul 16 15:49:46 2009, Damien Gallop, , , 16O4+ survey  
|
Thu Jul 16 15:41:35 2009, Damien Gallop, , , 18O5+ survey  
|
Thu Jul 16 15:38:58 2009, Damien Gallop, , , 16O5+ survey  
|
Thu Jul 16 15:22:51 2009, Damien Gallop, , , 18O6+ survey
|
Thu Jul 16 15:11:16 2009, Damien Gallop, , , 16O6+ survey  
|
Thu Jul 16 14:50:38 2009, Damien Gallop, , , 18O7+ survey
|
Thu Jul 16 14:46:52 2009, Damien Gallop, , , 16O7+ survey
|
Thu Jul 16 14:44:06 2009, Damien Gallop, , , 18O8+ survey
|
Thu Jul 16 14:41:46 2009, Damien Gallop, , , 16O8+ survey
|
Thu Jul 16 14:25:27 2009, Damien Gallop, , , 18O4+ survey  
|
Thu Jul 16 14:11:43 2009, Damien Gallop, , , MCOL3 slits calibrations  
|
Thu Jul 16 14:06:56 2009, Damien Gallop, , , MCIS vacuum trip overnight
|
Wed Jul 15 16:37:01 2009, Damien Gallop, , , Bias for IOS emittance rig   
|
Wed Jul 15 14:41:25 2009, Damien Gallop, , , 18O5+ survey   
|
Wed Jul 15 10:52:25 2009, Damien Gallop, , , 18O6+ survey 7x
|
Wed Jul 15 10:51:25 2009, Damien Gallop, , , 18O7+ survey
|
Wed Jul 15 10:41:23 2009, Damien Gallop, , , 18O8+ survey
|
Wed Jul 15 10:27:18 2009, Damien Gallop, , , 18O4+ overnight and emittance check   
|
Wed Jul 15 09:20:26 2009, Damien Gallop, , , Supernanogan development in progress
|
Tue Jul 14 15:19:51 2009, Damien Gallop, , , MCIS mass scan
|
Tue Jul 14 09:47:14 2009, Damien Gallop, , , 18O4+ tuning to TIGRESS this morning 7x
|
Mon Jul 13 17:41:04 2009, Damien Gallop, , , Supernanogan development Monday morning
|
Mon Jul 13 17:19:29 2009, Damien Gallop, , , MCIS vacuum trip at ~15:30
|
Mon Jul 13 09:49:52 2009, Damien Gallop, , , 18O4+ tuning to TIGRESS today
|
Fri Jul 10 11:47:07 2009, Damien Gallop, Routine, General, 18On+ frequency scans & resonances
|
Fri Jul 10 11:46:55 2009, Damien Gallop, Routine, General, 18On+ frequency scans & resonances
|
Fri Jul 10 09:55:25 2009, Damien Gallop, Routine, General, 18O8+ beam overnight
|
Thu Jul 9 16:07:56 2009, Damien Gallop, Routine, General, 18O8+ frequency scans 6x
|
Wed Jul 8 19:51:33 2009, Damien Gallop, Routine, General, 18On+ summary for the day  
|
Wed Jul 8 19:13:15 2009, Damien Gallop, Routine, General, 18O8+ emittance scan  
|
Wed Jul 8 19:07:15 2009, Damien Gallop, Routine, General, 18O7+ emittance scan
|
Wed Jul 8 18:57:09 2009, Damien Gallop, Routine, General, 18O6+ emittance scan 
|
Wed Jul 8 18:47:43 2009, Damien Gallop, Routine, General, 18O5+ emittance scan 
|
Wed Jul 8 18:38:21 2009, Damien Gallop, Routine, General, 18O4+ emittance scan 
|
Wed Jul 8 18:20:43 2009, Damien Gallop, Routine, General, 18O3+ emittance scan 
|
Wed Jul 8 18:12:25 2009, Damien Gallop, Routine, General, 18O2+ emittance scan 
|
Wed Jul 8 17:58:02 2009, Damien Gallop, Routine, General, 18O1+ emittance scan 
|
Wed Jul 8 17:47:26 2009, Damien Gallop, Routine, General, 18O4+ emittance scans    
|
Wed Jul 8 16:12:51 2009, Damien Gallop, Routine, General, Mass scan in progress  
|
Wed Jul 8 11:52:54 2009, Damien Gallop, Routine, General, Supernanogan development run plan for the remainder of this set
|
Wed Jul 8 10:57:46 2009, Damien Gallop, Routine, General, 18O4+ emittance scans 10x
|
Wed Jul 8 09:34:58 2009, Damien Gallop, Routine, General, 18O4+ frequency optimization
|
Wed Jul 8 09:22:07 2009, Damien Gallop, Routine, General, 18O4+ beam growth overnight
|
Tue Jul 7 17:47:14 2009, Damien Gallop, Routine, General, 18On+ beam & emittance
|
Tue Jul 7 15:43:19 2009, Damien Gallop, Routine, General, ISIS emittance rig tests this morning 
|
Mon Jul 6 17:34:24 2009, Damien Gallop, Routine, General, 18O background studies 6x
|
Mon Jul 6 10:57:08 2009, Damien Gallop, Routine, General, Beam stability versus temperature over weekend
|
Fri Jul 3 10:29:15 2009, Damien Gallop, Routine, General, RF frequency scans versus each charge state of 16O cont'd.   
|
Fri Jul 3 10:03:11 2009, Damien Gallop, Routine, General, Overnight beam stability on FC3   
|
Thu Jul 2 16:55:04 2009, Damien Gallop, Routine, General, RF frequency scans versus each charge state of 16O 7x
|
Thu Jul 2 11:58:18 2009, Damien Gallop, Routine, General, Supernanogan development in progress  
|
Tue Jun 30 17:39:13 2009, Damien Gallop, Routine, General, Compare 16O2+ beam from start of run to today 6x
|
Tue Jun 30 17:16:25 2009, Damien Gallop, Routine, General, 16O2+ emittance scans with slits open 6x
|
Tue Jun 30 10:56:26 2009, Damien Gallop, Routine, General, 16O2+ emittance scans 6x
|
Tue Jun 30 10:30:17 2009, Damien Gallop, Routine, General, Initial development setup
|
Tue Jun 30 09:33:00 2009, Damien Gallop, Routine, General, Supernanogan Development begins today for two weeks
|
Mon Jun 29 10:35:35 2009, Damien Gallop, Routine, General, 16O2+ pilot beam to TACTIC in progress  
|
Wed Jun 24 10:27:23 2009, Damien Gallop, Routine, General, 16O2+ tune ready for Sophia and Marco   
|
Tue Jun 23 18:04:30 2009, Damien Gallop, Routine, General, MCIS HV conditioning to 20KV
|
Tue Jun 23 16:48:00 2009, Damien Gallop, Routine, General, 16O2+ on FC6 after source tuning   
|
Tue Jun 23 15:02:38 2009, Damien Gallop, Routine, General, 16O2+ on FC6    
|
Tue Jun 23 10:33:43 2009, Damien Gallop, Routine, General, Effects of RF on charge state   
|
Mon Jun 22 20:28:37 2009, Damien Gallop, Routine, General, Preparations for 16O2+ delivery 6x
|
Mon Jun 22 16:00:04 2009, Damien Gallop, Routine, General, Emittance thoughts and other matters 7x
|
Fri Jun 19 20:15:19 2009, Damien Gallop, Routine, General, Summary of 16On+ emittance scans
|
Fri Jun 19 11:59:49 2009, Damien Gallop, Routine, General, 16On+ emittance scans continue 18x
|
Thu Jun 18 09:38:52 2009, Damien Gallop, Routine, General, Check Supernanogan beam after IOC reboot yesterday 15x
|
Wed Jun 17 17:01:07 2009, Damien Gallop, Routine, General, 16On+ emittance scans
|
Wed Jun 17 10:14:57 2009, Damien Gallop, Routine, General, 16O5+ on FC6 overnight 6x
|
Tue Jun 16 16:47:02 2009, Damien Gallop, Routine, General, Mass scan around 16O5+   
| +
Tue Jun 16 12:10:17 2009, Damien Gallop, Routine, General, 84Kr charge states begun   
|
Fri Jun 12 14:24:49 2009, Damien Gallop, Routine, General, 17O3+ beam at optimized RF  
|
Fri Jun 12 14:12:04 2009, Damien Gallop, Routine, General, OLIS & Supernanogan Facilities presentation
|
Thu Jun 11 12:10:22 2009, Damien Gallop, Routine, General, Supernanogan status
|
Wed Jun 10 18:48:53 2009, Damien Gallop, Routine, General, Krypton source gas fitted
|
Wed Jun 10 17:49:40 2009, Damien Gallop, Routine, General, Beam to RFQ
|
Wed Jun 10 11:22:59 2009, Damien Gallop, Routine, General, Supernanogan development mass scans  
|
Tue Jun 9 20:49:32 2009, Damien Gallop, Routine, General, Supernanogan RF & IOS slits 
|
Tue Jun 9 16:53:55 2009, Damien Gallop, Routine, General, Supernanogan development in progress
|
Mon Jun 8 09:31:39 2009, Damien Gallop, Routine, General, Emittance scan of 18O beam from MWS
|
Thu Jun 4 10:46:37 2009, Damien Gallop, Routine, General, 18O source operation overnight
|
Wed Jun 3 16:17:51 2009, Damien Gallop, Routine, General, MWS started for 18O1+ production to TIGRESS
|
Fri May 22 15:03:55 2009, Damien Gallop, Routine, General, Temporary fix on IOS:TP7
|
Fri May 22 12:31:36 2009, Raymond Dubé, , , Test
|
Fri May 22 10:50:06 2009, Damien Gallop, Routine, General, MCIS online with 17O3+ on FC6
|
Thu May 21 16:23:37 2009, Damien Gallop, Routine, General, 18O4+/8+ to TUDA-II declared done around noon
|
Fri May 15 14:12:45 2009, Geoff Wight, , , 1st test
|
Thu May 14 12:02:09 2009, Damien Gallop, Routine, General, Testing 2
|
Thu May 14 11:07:33 2009, Hossein Rafighi, , , Test
|
|