OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 177     Entry time: Mon Nov 2 17:42:54 2009
Author: Damien Gallop 
Type:  
Category:  
Subject: MCIS online with 17O3+ on FC6 

As noted earlier, we have opened the OLIS cage and set up the source gases for 17O operation. It will take a while for the SO2 to pump away and for the 17O2 to equalize within the source body. Meanwhile, we have restarted the source with a preliminary 17O3+ beam on FC6. Without a doubt this will be unstable for a time, and the source may blink out also.

ELOG V2.9.2-2455