OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 403     Entry time: Wed Jun 29 15:49:16 2011
Author: Damien Gallop 
Type:  
Category:  
Subject: 27Al+1 from MWS Setup 

Switchover from 58Ni+1/MCIS to 27Al+1/MWS began just after noon. MWS cleaned and fitted with aluminum liners. Pumping in progress. Good leakup curve. All electrostatics checked and operational. Source should be conditioned to at least 55kV at some point. Let it sit at 30kV overnight with 100W on MW.

Attachment 1: grab.Q27242.png  25 kB  | Show | Hide all
ELOG V2.9.2-2455