OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 344     Entry time: Tue Oct 12 13:25:21 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: MWS switchover for scheduled 24/26Mg beams 

Source switchover in progress on WP#2010-10-12-1. Magnesium material installed into MWS. Pumpdown in progress. Leakup rate OK. Turbos on.

Later... Pumping going well. at 1e-6 by ~16:00.

Attachment 1: grab.J26422.png  28 kB  Uploaded Tue Oct 12 14:33:08 2010  | Show | Hide all
Attachment 2: grab.J27689.png  30 kB  Uploaded Tue Oct 12 17:07:03 2010  | Show | Hide all
ELOG V2.9.2-2455