OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 492     Entry time: Thu Oct 30 13:14:51 2014
Author: Brian Minato 
Type: Other 
Category: Other 
Subject: OLIS Update 

MCIS-

a new oven assembly was installed on the MCIS yesterday.  The cart has been installed in the cage and is connected.

The power is connected to the cart oven as is the MCIS bias.  it is currently on and being tested for Se

MWS-

Keerthi removed the Be electrode and installed the quartz beaker.  There is quite a bit of a copper coating inside the source.

 

ELOG V2.9.2-2455