OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 507     Entry time: Wed Dec 17 13:17:13 2014
Author: Brian Minato 
Type: Other 
Category: Other 
Subject: MCIS Update 

The MCIS was vented with nitrogen yesterday.  The Se oven was drawn back into the tuner.  It was removed with the tuner and blanked.

The standard quartz window was removed and replaced with a ceramic, test window supplied by CPI. (p/n VWU2054).  The system is currently pumping down.

ELOG V2.9.2-2455