OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 305     Entry time: Mon Jul 5 11:58:49 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 26Mg6+ for TIGRESS 

Beam was switched from 24Mg5+ to 26Mg6+ on Canada Day. Also, the source blinked out on Saturday. Remote restart okay. Source is running well.

Supernanogan maintenance continues. MCIS optics module was reassembled last week and installed this morning. Also a section of wveguide was replaced using a specially prepared section. TBD: MCIS:DB1 top place assembly, pump, then reinstall the cart into the cage if possible.

Later... solid target chamber installed with germanium powder, in preparation for an upcoming run. MCIS:DB1 is assembled. Volume is under high vacuum now. Leak detector also set up in preparation for checking tomorrow.

Attachment 1: Picture_1.png  39 kB  | Show | Hide all
ELOG V2.9.2-2455