Message ID: 508     Entry time: Mon Apr 20 08:09:03 2015
Author: Brian Minato 
Type: Routine 
Category: General 
Subject: OLIS Shutdown Update 

The OLIS 1 week shutdown has been completed (WP 2015-04-13-1).

General-

Y-Box insulators were inspected and look good.  Beamline optics were inspected.

MWS-

The La disk was removed.  Source housing was cleaned and re-asssembled with a beaker installed. 

MCIS-

The cart was installed in the HV cage.  Kr gas pack was installed on the cart and the transfer tube was opened up to MCIS vacuum.

SIS-

Source PE and EE assembly was removed and opened up for inspection.  A new source was assembled (1/4 Ta tube and 0.040 Ta Oven & Ionizer wires) and installed.  Lithium Nitrate Anhydrous (ALFA #13405 TR#205938) was inserted in the oven.

 

Additional details-

M:\OLIS\OFF LINE ION SOURCE\DOCUMENTS\Shutdown Work

 

OLIS MWS is currently running an producing 22Ne2+

 