OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 38     Entry time: Tue Jun 30 17:16:25 2009
Author: Damien Gallop 
Type: Routine 
Category: General 
Subject: 16O2+ emittance scans with slits open 

First, with upstream slits opened, then with both open. Original slit setting was 1mm. Finally, restore slits to 1mm and see if it reproduces. It does.

Attachment 1: grab.PM9871.png  23 kB  | Show | Hide all
Attachment 2: grab.uu9884.png  14 kB  | Show | Hide all
Attachment 3: grab.Xu9979.png  22 kB  | Show | Hide all
Attachment 4: grab.jO9984.png  14 kB  | Show | Hide all
Attachment 5: grab.a10088.png  22 kB  Uploaded Tue Jun 30 18:27:13 2009  | Show | Hide all
Attachment 6: grab.H10092.png  14 kB  Uploaded Tue Jun 30 18:27:24 2009  | Show | Hide all
ELOG V2.9.2-2455