OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 5     Entry time: Fri May 22 10:50:06 2009
Author: Damien Gallop 
Type: Routine 
Category: General 
Subject: MCIS online with 17O3+ on FC6 

The previous 18O4+/8+ run to TUDA-II finished midday yesterday. OLIS was prepared for 17O delivery from the Supernanogan source. Leak checking was done last night. The big offender was a failing metal seal on IOS:TP7. The pump will have to be replaced. Meanwhile the pressure is sufficient for 20nA of 17O3+ with 2.5mm (middle selection) apertures inserted. Present agreement is to leave TP7 as-is for this run.

ELOG V2.9.2-2455