MCIS-
the MWS Bias and PE have been moved on to the MCIS (the MCIS connections have been removed).
The plug in power to the HP Signal generator has been moved to a continuous source (Removed from the source controlled by the SSW).
SIS-
a test filament assembly has been installed in the SIS. No chemicals have been loaded or alignment done on the oven / ionizer. It has been installed just as a test. |