A 1e-5 atm.cc/sec of 17O leak and a 1e-6 atm.cc/sec of neon leak are connected to the source through center tube of the RF transfer antenna.
Ne valve is open for upcoming CSB test. 17O valve is closed. All optics are set to A/Q=5.5. RF, EL and HV are off for the weekend since no ISAC ops at night. |