OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 342     Entry time: Mon Oct 4 09:46:12 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: 20Ne1+ at 40.8keV for TIGRESS setup 

A 20Ne1+ beam from the MWS was established on Friday. Line tuning began Friday evening. A tune to the front of the SC LINAC was in place by Saturday. Tuning through was delayed by SC tank conditioning.When the LINAC is ready, tuning to TIGRESS will resume, expected today.

ELOG V2.9.2-2455