OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 150     Entry time: Sun Oct 4 19:16:46 2009
Author: Keerthi 
Type:  
Category:  
Subject: OLIS status 

Supernanogan is ready with 22Ne+4 for upcoming CSB run. EL, HV and RF are on. The anlyzing magnet and the other optics are set for A/Q=5.5.

A 2nA of 22Ne+4 is sitting at the FC6. If require more current, increase the RF up to 25W or change the frequency to 13.256GHz.

ELOG V2.9.2-2455