Today we switch from 74Ge1+ to 4He1+, about as wide a switch as we've done at OLIS. We will use the MWS for the 4He.
Later... sources lit. First mass scan attached. Intensity is pretty low for now.
Later... MWS optimized better. Optimal He gas pressure is somewhere between zero and the leakthrough rate on the flow controller set at zero. Stripchart attached. ICR will play with source and beam as it is for now.
Later... ICR has found a few enA in there, and vested parties are happy with the beam. |