I'm back from vacation. Physically, anyway. Keerthi did comprehensive emittance scans during Supernanogan Development over the last couple of weeks. He is very happy with the results so far. We are doing come post-analysis comparisons presently. Meanwhile, DRAGON is taking 16O3+. Some sideshows, including power bumps this morning which knocked out MCIS and many other systems. The mag stab facility was offline while I was away. I restarted it around noon. Some source tuning for current changes and stability from time to time, done by Keerthi.
We still have this water interlock issue on the IOS bias supply, preventing us from turning it on. I left a note about it before I left. Must follow that up tomorrow.
Later... Here are a couple of stripcharts of magstab performance, before and after the TP1 trip that occurred on Friday, September 11th, noted elsewhere. Spikes are DRAGON's automatic Faraday cup readings. |