OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 316     Entry time: Tue Jul 20 09:38:45 2010
Author: Damien Gallop 
Type:  
Category:  
Subject: OLIS Maintenance 

Our work permit to leakcheck the Supernanogan and IOS was signed this morning. The source is off presently, and work is underway. The 12C2+ beam was not used overnight.

Attachment 1: Picture_3.png  47 kB  | Show | Hide all
ELOG V2.9.2-2455