Message ID: 486     Entry time: Tue Oct 21 07:14:26 2014
Author: Brian Minato 
Type: Other 
Category: General 
Subject: OLIS Work 

MCIS-

the cart was moved into the HV cage.  The facilities will be connected and an oven will be tested for the upcoming Se experiment.

Will take measurements for installation of key interlocks on cart power supplies.

SIS-

the filament assembly was removed for inspection.  When increasing the ionizer current it would work correctly until about 20 amps.  Then the current would stop (like an open cct).

MWS-

will prepare for Be later this week.