OLIS Logbook General
  General  Not logged in ELOG logo
Message ID: 164     Entry time: Thu Oct 15 21:06:10 2009
Author: Keerthi 
Type:  
Category:  
Subject: OLIS status 

33S development is completed.  A 3nA of 33S+5 can be produced with 10W of RF power and 2.5mm aperture.

If more beam is needed apertures and the power must be increased.  There are some consequences for doing this.

MCIS optics and RF are off for the night.

ELOG V2.9.2-2455