| Conveniently scheduled for BC Day, we are preparing to switch over the MWS to sputter operation with MG source material. Operations has saved present 21Ne tune. Later... Done! Source is relit with 21Ne beam on FC6. Summary: 
    Vent IOS to ArRemove MWS backplateMachine Mg metal disk (source material) for mounting screwsHand-cut Mg disk in two halves and cleanClean backplateAttach disk halves to backplateClean assemblyReassemble at OLISPump - roughout was fastPump - turbos onMinor MROButton up and go with previous settings. We will let it run this way overnight and shoot for an Mg plasma and beam tomorrow. Attached below are plots of the last few hours of 21Ne beam. PDG, I'd say. Note the variation in sync with room temperature. |