Subject: 18O4+/8+ to TUDA-II declared done around noon 

End of run diagnostics done. See ISAC elog. Supernanogan cart is already installed and at high vacuum. Prepare to run 17O from Sgan sometime over the weekend. Today's agenda:

1. Close 18O bottle and gas valves.

2. Isolate IOS:CG0 to minimize pressure contribution from long copper lines.

3. Work around gate valve interlocks.

4. Set up for leak checking: IOS first.

We did some preliminary vacuum checks, and found significant loading on the IOS turbos, probably downstream near DB6. Leak checking now in progress.