  513   Wed Feb 22 21:51:40 2017 Keerthi Jayamanna  SIS first beam is N1+1Chris confirmed the first SIS beam would
be Na+1. Next Rb+1 and then Li+1
  
  512   Wed Feb 22 21:46:27 2017 Keerthi Jayamanna  Elog is working nowElog is now functioning. We can start entering
notes
  
  511   Mon Sep 14 11:21:16 2015 Keerthi JayamannaRoutineGeneral20Ne+2 beam saved20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap   
  510   Thu May 21 09:15:48 2015 Brian Minato   Service of MCIS.  Plasma chamber cleaned. 
Repaired shorted, Right steering plate. 
Added shields to help prevent coating of
  
  509   Wed Apr 29 07:48:22 2015 Brian MinatoOtherOtherRepair- Water leak inside HV cageA water leak was reported inside the HV
cage (FR#8079).  The cage was accessed
to determine the source of the leak (WP#I2015-04-27-1).
  
  508   Mon Apr 20 08:09:03 2015 Brian MinatoRoutineGeneralOLIS Shutdown UpdateThe OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
  
  507   Wed Dec 17 13:17:13 2014 Brian MinatoOtherOtherMCIS UpdateThe MCIS was vented with nitrogen yesterday. 
The Se oven was drawn back into the tuner. 
It was removed with the tuner and blanked.
  
  506   Tue Nov 25 12:23:28 2014 Keerthi JayamannaRoutineGeneral76Se+13 tune saved141125_1159_OLIS_76Se+13.snap is saved
in reference directory.
El=3480/4303V
  
  505   Tue Nov 25 07:49:50 2014 Brian MinatoOtherGeneralMCIS and SIS UpdateMCIS-
the Se was loaded into the oven last
friday (21st).  During the weekend the
  
  504   Wed Nov 19 11:34:55 2014 Raymond DubeRoutineGeneralOLIS Electrical diagram with 3 I.S.I updated
the electrical Diagram  for OLIS Faraday
Cage with 3 Ion Source, ref: ISK4586D rev.
 ISK4586D-rev2.pdf 
  503   Tue Nov 18 08:56:23 2014 Brian MinatoOtherGeneralALGA UpdateThere has been no noticeable loss of communication
to the ALGA 50watt amplifier.  As a
test, the ethernet cable was removed for
  
  502   Thu Nov 13 16:34:29 2014 Brian MinatoOtherOtherMCIS UpdateThe ethernet cable from the CPI TWT amplifier
has been temporarily moved to the Alga 50W
amplifier.  The Alga had been experiencing
  
  501   Thu Nov 13 16:31:54 2014 Brian MinatoOtherOtherSISA new SIS source has been installed. 
The oven has been loaded with Sodium Hydrogen
Carbonate (Alfa Aesar 10863) and Rubidium
  
  500   Wed Nov 12 13:32:47 2014 Raymond DubeRoutineGeneralNew in-line resistors for IOS:PEToday we replace the in-line resistors
for the Plasma Electrode (PE) it was a 25
ohm 200W (2 x 50 Ohm 100W) with a 50 Ohm
 ISK4583D-rev10.pdf 
  499   Thu Nov 6 08:37:52 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the source is off.  It is under
vacuum and in the HV cage.
  
  498   Sat Nov 1 13:31:17 2014 Keerthi Jayamanna  MCIS readyness for 76SeSupernanogan is running with oven no heat,
without 76selenium. MCIS:IG1=3e-7Torr.
Tune saved as 141101_1318_76Se+11tune.snap
  
  497   Fri Oct 31 20:39:56 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
the MWS Bias and PE have been moved
on to the MCIS (the MCIS connections have
  
  496   Thu Oct 30 23:44:57 2014 Keerthi JayamannaRoutineGeneralOLIS Supernanogan mass scan 6 to 7.5A/q          
FC6  (only current over 100pA)
6.0          
  
  495   Thu Oct 30 23:37:58 2014 Keerthi JayamannaRoutineGeneralMass scan 4 to 6A/Q           
FC6
4               
  
  494   Thu Oct 30 22:44:45 2014 Keerthi JayamannaRoutineGeneralMass scan 3 to 4IOS mass scan if faulty. These is a manual
scan from mass 3 to 4
Const22 = 0.04187  adjusted
  
  493   Thu Oct 30 22:09:02 2014 Keerthi Jayamanna  Suoernanogan steeringIOS mass scan does not work.
A/Q        
   FC6     
  
  492   Thu Oct 30 13:14:51 2014 Brian MinatoOtherOtherOLIS UpdateMCIS-
a new oven assembly was installed
on the MCIS yesterday.  The cart has
  
  491   Tue Oct 28 13:30:47 2014 Brian MinatoOtherOtherMCIS UpdateMCIS-
the cleaning has been completed. 
The oven assembly is removed and the gate
  
  490   Mon Oct 27 15:13:18 2014 Brian Minato   MCIS-
cleaning out source to remove potassium
and calcium.
  
  489   Fri Oct 24 10:50:20 2014 Brian MinatoOtherOtherOLIS UpdateThe nitrogen bottle needs to be replaced.
 
MCIS-
  
  488   Thu Oct 23 10:52:21 2014 Brian MinatoRoutineGeneralALGA AmplifierThe ALGA amplifier and its signal generator
have been turned off at the request of Controls. 
They have had communication issues and are
  
  487   Wed Oct 22 07:58:32 2014 Brian MinatoOtherGeneralMCIS WorkThe remaining connections were done on
the MCIS. 
A piece of 1/8" teflon was installed
  
  486   Tue Oct 21 07:14:26 2014 Brian MinatoOtherGeneralOLIS WorkMCIS-
the cart was moved into the HV cage. 
The facilities will be connected and an oven
  
  485   Tue Oct 14 08:31:53 2014 Brian MinatoOtherGeneralWater Flow Switch #3This entry was incorrectly added to the
OLIS logbook.  it has been moved to
the I3 logbook.
  
  484   Fri Oct 10 14:02:56 2014 Raymond DubeRoutineGeneralTest with new Alga, ALPA 50W RF AMPWe did a test yesterday with the new Alga
Microwave RF AMP, model # ALPA 50 Watt, serial
# 130684 to be used for the MCIS.  We
 ALPA-RF_AMP-50W.pdf 
  483   Tue Sep 16 11:55:28 2014 Raymond DubéRoutineGeneralMCIS infoI found
these files about the MCIS in Geoff folders
in M:\ISIS\Geoff-110715\OLIS\SuperNanogan
 Cart-Power1.pdfSuperNanogan_Control-R1.pdfSupernanogan_Interlocks-R1.pdf 
  482   Wed Aug 13 15:09:42 2014 Raymond DubéRoutineGeneralOLIS Attenuators #2 fixed, #1 gone!Today
Probe group (Scott K.) installed the OLIS
Attenuator, they fixed the vacuum leak on
  
  481   Wed Aug 13 15:04:05 2014 Raymond Dubé  OLIS Bender Magnet PS (0-500 amps)Arthur
and Derek had a look at the OLIS Bender Magnet
P/S and found a problem with the Polarity
  
  480   Wed Aug 13 15:00:27 2014 Raymond DubéRoutineGeneralOLIS Surface Source broken Ionizer CoilWe spent
most of the day looking at OLIS to find out
why the "Ionizer Coil" keeps breaking
 ISK4386D-rev5.pdfISK4583D-rev7.pdfISK4584D-rev1.pdfPE-R5-FAN_ON.jpg 
  479   Fri May 16 08:44:27 2014 Raymond DubéRoutineGeneralOLIS work next weekAttached
is the scheduled work for OLIS next week.
 OLIS-Work-05.pdf 
  478   Wed Jan 29 12:27:57 2014 Raymond Dubé  OLIS Skimmers BOP & LabelsI updated
2 drawings that show the OLIS skimmers.
A. 
 isk4363d-rev4.pdfisk4365d-rev2.pdf 
  477   Fri Jan 24 09:15:10 2014 Raymond Dubé  New ISK4586D for OLIS with 3 Ion SourceI created
a new drawing: ISK4586D that shows the Optics
for OLIS with 3 Ion Source.
 ISK4586D-rev1.pdf 
  476   Thu Jan 23 12:56:14 2014 Raymond Dubé  New & updated drawings for S.S.I updated
an old drawing ISK4478D (MS & MCIS Optics)
and created 2 new ones: ISK4583D (Electrical
 ISK4478D-rev5.pdfISK4585D-rev2.pdfISK4583D-rev5.pdf 
  475   Wed Jan 22 10:34:58 2014 Raymond Dubé  IN-line 100K for IOS:YCB1A removedLast January 17th 2014 we removed an in-line
resistor (100K 10W) from IOS:YCB1A because
we do not think that it is needed.
  
  474   Mon Dec 17 14:10:22 2012 Keerthi Jayamanna  Gas flow controller faultControls group may need some assistance
from OLIS group in order to trouble shoot
the problem.
  
  473   Mon Dec 17 14:08:52 2012 Keerthi Jayamanna  IRIS beam delivary is completedIRIS beam delivery is completed with extra
3 days of beam providing to them.
18O2 and 40Ar+2 were delivered with
  
  472   Fri Dec 14 17:30:47 2012 Keerthi Jayamanna  18OH2 and 40Ar+2 delivaryDuring the last week we delivered 18O+2
from microwave ion source to Ritu.
Over the week end changed to 40Ar+2.
  
  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
  
  470   Sun Dec 2 22:34:09 2012 Keerthi Jayamanna  Just finished 136Xe+25. ISAC reached 1GeV yesterday using OLIS Xe beam    
  469   Sun Dec 2 22:32:19 2012 Keerthi JayamannaRoutineGeneralStill cannot write anything other than Subject    
  468   Wed May 23 17:11:57 2012 Keerthi Jayamanna  Changed beam to 12C++ beamRemoved titanium from the back plate and
clean the source.
But left the PE titanium insert since
  
  467   Thu Nov 10 09:57:57 2011 Damien Gallop  OLIS ShutdownSupernanogan on overnight with 36Ar+7 on
FC6. Nice.
Today is the last day of scheduled
 Picture_3.png 
  466   Wed Nov 9 11:40:35 2011 Damien Gallop  OLIS ShutdownSupernanogan 36Ar+7 source development
in progress. RF frequency scans are the agenda
for today.
 Picture_8.pngPicture_9.png 
  465   Tue Nov 8 10:02:54 2011 Damien Gallop  OLIS ShutdownSupernanogan is online with 36Ar+7 on FC6
overnight. Looks good. Note: The source gas
arrangement (enriched 36Ar) utilizes double
 Picture_3.pngPicture_4.pngPicture_5.pngPicture_7.pngPicture_6.png 
  464   Mon Nov 7 09:58:17 2011 Damien Gallop  OLIS ShutdownIOS pumped well over the weekend. Present
pressure is 1.5e-7. MCIS pumps off
for setup.
 Picture_2.pngPicture_1.png 
  463   Fri Nov 4 09:41:32 2011 Damien Gallop  OLIS ShutdownMCIS continues to pump well. IOS DB assembly
planned for today.
Later... DB assembly complete and
 Picture_22.png 
  462   Thu Nov 3 09:50:05 2011 Damien Gallop  OLIS ShutdownMCIS pumped well overnight. Source development
imminent.
Later... possible IOS intervention.
 Picture_21.png 
  461   Wed Nov 2 10:16:49 2011 Damien Gallop  OLIS ShutdownMCIS pumpdown continues well. IOS optics
coming along. DB3 installed last night and
IOS is under vacuum very early. DB1/2 optics
 Picture_21.png 
  460   Tue Nov 1 10:18:02 2011 Damien Gallop  OLIS ShutdownMCIS pumped overnight. Still coming down.  Picture_20.png 
  459   Mon Oct 31 11:06:58 2011 Damien Gallop  OLIS ShutdownTwo weeks of OLIS Shutdown have begun.
The plan is to complete refurbishing this
week and pump next week, with 36Ar+6 beam
 grab.g18922.png 
  458   Mon Oct 31 11:04:06 2011 Damien Gallop  33S+6 from MCIS to DRAGON EOBDeliver concluded yesterday morning around
09:00.
Pity to have to switch off the source. OLIS
 Picture_17.png 
  457   Fri Oct 28 10:18:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued overnight.  Picture_16.png 
  456   Wed Oct 26 10:17:53 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery continued
uneventfully overnight and is continuing.
Later... source is just getting better
 Picture_13.pngPicture_14.png 
  455   Tue Oct 25 09:41:32 2011 Damien Gallop  33S+6 from MCIS to DRAGONBeam petered out earlier this morning after
an attempt to tweak the RF frequency. Restored.
Plasma was on throughout. ICR has lowered
 Picture_12.png 
  454   Mon Oct 24 10:10:34 2011 Damien Gallop  33S+6 from MCIS to DRAGONDelivery since Friday
Beam on but intensity
is dropping, suggesting that enriched 33S
 Picture_10.png 
  453   Wed Oct 19 09:53:27 2011 Damien Gallop  33S from MCIS to HE Development SetupMCIS configured for 33S+6 yesterday afternoon.
Beam grew nicely overnight. Beam development
expected after source hand-off.
 Picture_9.png 
  452   Tue Oct 18 10:27:44 2011 Damien Gallop  19F/38Ar from MCIS for Beam DevelopmentCocktail beams continue today.  Picture_7.png 
  451   Mon Oct 17 11:33:03 2011 Damien Gallop  19F/38Ar from MCIS for Beam DevelopmentSource set up for a cocktail beam since
yesterday, Sunday.
  
  450   Thu Oct 13 11:11:14 2011 Damien Gallop  14N+2 from MWS to SEBT for Beam DevelopmentSource setup took place earlier this morning.  Picture_5.png 
  449   Thu Oct 6 15:15:09 2011 Damien Gallop  19F/40Ar from MCIS for Beam DevelopmentSlit calibration exercise was wound up
this morning. MCIS source gases were reconfigured
with 19F and 40Ar by request. A "cocktail"
 Picture_4.png 
  448   Wed Oct 5 10:11:28 2011 Damien Gallop  33S from MCIS Source DevelopmentThe source stayed up overnight. A little
RF tweak, but 33S+6 beam still on FC6.
Later... IOS:MCOL3 slits calibration
 Picture_1.png 
  447   Tue Oct 4 10:37:38 2011 Damien Gallop  33S from MCIS Source Development SetupBeam development with 116Sn+18 finished
last evening around 21:00. Source was off
overnight. 33S material loaded into MCIS
 Picture_24.pngPicture_25.png 
  446   Mon Oct 3 10:08:50 2011 Damien Gallop  116Sn+18 & 118Sn+19 from MCIS for DevelopmentOn Friday there was a request to repeat
some of the findings with tin beams. An agreement
was made to use OLIS for development in lieu
 Picture_22.pngPicture_23.png 
  445   Thu Sep 29 10:50:30 2011 Damien Gallop  36/40Ar development with MCISDevelopment with Supernanogan source continues.
Present beam is 40Ar+7, about 70enA.
  
  444   Wed Sep 28 11:56:15 2011 Damien Gallop  36/40Ar development with MCIS40Ar source gas, ergo 40Ar+x beams. 40Ar+6
earlier, and 40Ar+7 presently.
 Picture_21.png 
  443   Tue Sep 27 13:29:23 2011 Damien Gallop  36/40Ar development with MCISBeam development for forthcoming 36Ar run
is in progress. Initial yield numbers have
been determined. Source is running with Ar
  
  442   Mon Sep 26 09:47:12 2011 Damien Gallop  13C+3 from MCIS to TACTICThe 17O+3 (A/q=5.66) run to TACTIC finished
yesterday morning. Then a source switchover
was done to deliver 13C+3 (A/q=4.33) using
 Picture_20.pngPicture_19.png 
  441   Fri Sep 23 14:59:14 2011 Damien Gallop  14N+3 & 17O+3 from MCIS to TACTIC at HEBTDelivery continues. 14N+3 until mid-morning,
then a switch to 17O+3 for tuning. The switchover
from 116Sn to TIGRESS to 14N+3 to TACTIC
 Picture_16.pngPicture_17.pngPicture_18.png 
  440   Mon Sep 19 10:27:36 2011 Damien Gallop  116Sn+18 & 118Sn+19 from MCIS to TIGRESSDelivery continued over the weekend with
some interruptions here and there. A source
intervention was made late last night and
 Picture_15.png 
  439   Fri Sep 16 10:02:33 2011 Damien Gallop  116Sn+18 & 118Sn+19 from MCIS to TIGRESSBeam was changed to 14N+2 last evening
for sake of tuning to front of RFQ. Source
was tweaked earlier. Beam is presently set
 Picture_12.png 
  438   Thu Sep 15 12:09:25 2011 Damien Gallop  116Sn+18 & 118Sn+19 from MCIS to TIGRESS SetupSource switchover began last night after
22:00. There are some 200epA of A/q=6.46
(116Sn+18) on FC6 presently. Setup and tuning
 Picture_6.pngPicture_7.pngPicture_10.png 
  437   Thu Sep 15 11:29:39 2011 Damien Gallop  12C+2 from MCIS to DRAGON EOBBeam delivery was scheduled to end last
evening at 20:30. It was extended to around
22:00, at which point source switchover began.
 Picture_5.png 
  436   Wed Sep 14 10:00:05 2011 Damien Gallop  12C+2 from MCIS to DRAGONDelivery continues. Nice consistency. See
attached Stripchart. A source switchover
is scheduled for today, tonight, as it turns
 Picture_2.png 
  435   Tue Sep 13 10:00:56 2011 Damien Gallop  12C+2 from MCIS to DRAGONDelivery continued through the night. User
was taking the beam. Recovery from a DTL
tank trip is happening at the moment. Otherwise,
 Picture_1.png 
  434   Mon Sep 12 10:07:36 2011 Damien Gallop  12C+2 from MCIS to DRAGON SetupSetup began around 09:00. 400enA of A/q=6
on FC6 presently.
Later... By ~14:00 beam looks pretty
 Picture_3.pngPicture_4.png 
  433   Mon Sep 12 10:04:42 2011 Damien Gallop  4He from MCIS to DRAGON EOBDelivery continued through the weekend.
Some 300nA on FC6. The run ended at around
09:00. Source switchover is in progress now.
 Picture_1.pngPicture_2.png 
  432   Thu Sep 8 11:21:45 2011 Damien Gallop  4He from MCIS to DRAGON SetupThe 58Ni delivery from MWS to TITAN ended
last evening. Beam was unused from about
18:30, and source switchover began at about
 Picture_53.png 
  431   Wed Sep 7 09:50:20 2011 Damien Gallop  58Ni1+ from MWS to TITANDelivery continues. Source change scheduled
for 20:30 this evening.
 Picture_52.png 
  430   Tue Sep 6 16:37:24 2011 Damien Gallop  58Ni1+ from MWS to TITANPilot beam delivery continues. Keerthi
came in over the Labor Day weekend to help
out on something.
 Picture_50.png 
  429   Fri Sep 2 10:04:55 2011 Damien Gallop  58Ni1+ from MWS to TITANBeam idled overnight. Average ~50pA at
FC6. About half that on ILE2T:FC3 presently.
Setup on TITAN side in progress.
 9x 
  428   Thu Sep 1 10:01:25 2011 Damien Gallop  58Ni1+ from MWS to TITANBeam was established yesterday. It has
grown nicely overnight.
 Picture_39.png 
  427   Wed Aug 31 12:12:39 2011 Damien Gallop  58Ni1+ from MWS to TITAN SetupBeam on FC6 drifted overnight. Touch up
a few things, notably the EE. 25pA on FC6
presently. I also increased microwave power
 Picture_37.pngPicture_38.png 
  426   Tue Aug 30 16:40:14 2011 Damien Gallop  58Ni1+ from MWS to TITAN SetupSource switchover from MCIS to MWS. Support
gases and liners were pre-fitted. Source
lit. Optics set for 20keV operation. ~50pA
 Picture_33.pngPicture_34.pngPicture_36.png 
  425   Tue Aug 30 10:01:30 2011 Damien Gallop  17O3+ from MCIS ReservedWe are on orders to retain OLIS for accelerator
development. The switchover to 58Ni, scheduled
for this morning, is on hold.
 Picture_32.png 
  424   Mon Aug 29 10:03:05 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues on autopilot. Looking
good.
ICR noted that a seemingly unusual number
  
  423   Thu Aug 25 10:54:34 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues.  Picture_24.pngPicture_25.pngPicture_26.pngPicture_27.pngPicture_28.png 
  422   Wed Aug 24 10:49:41 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues. There were several
"PV1" trips over the past several
days. ICR now has a recipe for resetting
 Picture_20.pngPicture_21.pngPicture_22.png 
  421   Mon Aug 22 09:49:34 2011 Damien Gallop  17O3+ from MCIS to DRAGONDelivery continues. The attached vacuum
trar suggests that this is about as good
as it's going to get. On the other hand,
 Picture_25.png 
  420   Fri Aug 19 10:01:52 2011 Damien Gallop  17O3+ from MCIS to DRAGONSetup in progress. No foil at M:5. Source
has been running since yesterday. Note that
source was opened recently for MRO. Vacuum
 Picture_20.pngPicture_21.png 
  419   Mon Aug 15 10:19:18 2011 Damien Gallop  84Kr from MWS to TITANThe source was configured and switched
over on Friday. Some teething pains over
the weekend. Beam is on FC6 presently.
 Picture_18.pngPicture_17.png 
  418   Mon Aug 8 17:08:28 2011 Damien Gallop  Supernanogan MROCart removed for source servicing. Source
opened and split at front seal. Ground and
plasma electrodes removed. All internal areas
 grab.w19243.pnggrab.q19378.png 
  417   Wed Aug 3 00:15:39 2011 Keerthi JayamannaOtherGeneral22Ne+2Source started at 800W of microwave power
and 2cc/min neon gas easily. New magnetron
produces more power than the old one.
  
  416   Fri Jul 22 15:56:08 2011 Damien Gallop  27Al+1 from MWS for DRAGON statusThere have been teething pains developing
a good 27Al beam. The Supernanogan sputter
source ate through aluminum rods like candy.
 Picture_7.png 
  415   Wed Jul 20 01:37:46 2011 Keerthi Jayamanna  Al beam development: 
Supernanogan is tested for Al+6
beam production.
A 8nA of mass
  
  414   Tue Jul 19 17:02:44 2011 Damien Gallop  27Al+1 from MCIS SetupThe DRAGON run finished this morning. Switchover
to 27Al+6 in progress now.
 Picture_5.png 
  413   Mon Jul 18 10:02:42 2011 Damien Gallop  24Mg+6 from MWS for DRAGONKeerthi came in early this morning to set
up OLIS for 24Mg delivery. HEBT tuning is
in progress.
 Picture_2.pngPicture_3.pngPicture_4.png 
  412   Mon Jul 18 09:53:05 2011 Damien Gallop  4He from MCIS to HERACLES done Saturday and SundayKeerthi came in on Saturday morning and
set up the Supernanogan source for 4He delivery.
It looks like it went well. The original
  
  411   Fri Jul 15 10:30:11 2011 Damien Gallop  24/25Mg+1 from MWS for HERACLES on SEBT125Mg beam mostly sitting on FC6 now, as
HERACLES takes RIB. Source was opened
on Monday night to replace microwave window.
 Picture_6.pngPicture_7.pngPicture_8.pngPicture_9.pngPicture_10.png 
  410   Mon Jul 11 09:46:07 2011 Damien Gallop  24/25Mg+1 from MWS for HERACLES on SEBT1Well, the plasma electrode shorted again,
and Keerthi came in on Saturday to tear down
the MWS and clean it. Beam is steady as she
  
  409   Fri Jul 8 10:07:14 2011 Damien Gallop  24/25Mg+1 from MWS for HERACLES on SEBT1 
Beam on FC6 overnight and very stable.
It grew overnight and continues to grow,
 8x 
  408   Thu Jul 7 10:40:27 2011 Damien Gallop  24/25Mg+1 from MWS SetupSource conditioned nicely overnight at
55kV with a little RF power on. Source gases
checked, final cage inspection. Ready to
 6x 
  407   Wed Jul 6 13:20:15 2011 Damien Gallop  24/25Mg+1 from MWS SetupSource opened, and aluminum components
removed. Magnesium components from previous
run cleaned and installed. Pumpdown in progress.
 grab.jS3278.pnggrab.FQ5737.png 
  406   Wed Jul 6 09:56:45 2011 Damien Gallop  27Al+1 from MWS for DRAGON EOBDRAGON has been taking beam since approximately
noon on Monday, and finished a little while
ago. Feedback I have received is that beam
 13x 
  405   Sun Jul 3 09:56:47 2011 Damien Gallop  27Al+1 from MWS SetupA lot has happened since the last entry.
The source blinked out at some point. Cause
cited was a PE short. Actions were taken,
 grab.N30246.pnggrab.e30256.pnggrab.M30261.pnggrab.i30265.pnggrab.X30290.png 
  404   Thu Jun 30 10:02:08 2011 Damien Gallop  27Al+1 from MWS SetupSource pumped overnight to previous baseline
(red trace on attached Stripchart). IOPS
conditioned it up to 42kV without a hitch.
 Picture_2.pngPicture_3.pngPicture_4.pngPicture_5.png 
  403   Wed Jun 29 15:49:16 2011 Damien Gallop  27Al+1 from MWS SetupSwitchover from 58Ni+1/MCIS to 27Al+1/MWS
began just after noon. MWS cleaned and fitted
with aluminum liners. Pumping in progress.
 grab.Q27242.png 
  402   Wed Jun 29 09:45:50 2011 Damien Gallop  58Ni from MCIS to TITANLast hours and minutes. Going well. Documentation
appended. Users have requested beam until
noon.
 8x 
  401   Tue Jun 28 09:32:09 2011 Damien Gallop  58Ni from MCIS to TITANBeam mostly idle overnight. Things are
resuming now.
 Picture_4.png 
  400   Mon Jun 27 10:20:41 2011 Damien Gallop  58Ni from MCIS to TITANFrom MCIS. It looks like things went fairly
well over the weekend for them. An interlock
glitch on MCIS:IV1 this morning, source pressure
 Picture_1.pngPicture_2.png 
  399   Fri Jun 24 15:11:20 2011 Damien Gallop  58Ni from MCIS to FC6 SetupOLIS was switched from 22Ne2+ (MWS) to
58Ni+1 (MCIS). Works like magic. 100epA presently.
  
  398   Fri Jun 10 11:35:24 2011 Damien Gallop  22Ne2+ for TUDA-II Pilot BeamMWS online. Beam sitting on FC6.
Mel returned two flow controllers
today, borrowed in March
  
  397   Thu Jun 9 16:51:09 2011 Damien Gallop  22Ne2+ for TUDA-II Pilot BeamMWS online. Note: A/q display is white.
Possible culprit: IOSIOC. ICR will reboot
it at first convenient opportunity.
 Picture_1.pngPicture_4.pngPicture_3.pngPicture_2.pngPicture_5.png 
  396   Mon May 30 14:44:01 2011 Damien Gallop  22Ne2+ for ICR TrainingMWS online. Separator magstab program offline.
Check: Kepco is switched off and one lead
is physically cut and taped over. That's
 IMG_0093.jpg 
  395   Mon May 2 10:50:28 2011 Damien Gallop  Alkalis for DRAGON EOBDRAGON has been taking various species
of Na and Rb using the MWS. Run ended this
morning. Emittance scan of 23Na attached.
 7x 
  394   Fri Apr 1 17:02:09 2011 Damien Gallop  12C2+ for StartupSupernanogan is online with a bit of 12C2+
beam on FC6. Mag stability program is running.
Source development to follow.
  
  393   Tue Mar 29 15:32:08 2011 Damien Gallop  Controls and Panel MROControls is working on an interlock issue.
Electrical panel MCC-X maintenance is planned
for tomorrow afternoon.
  
  392   Fri Mar 25 17:42:38 2011 Keerthi Jayamanna  OLIS HV start upHigh Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is
on at 17:53pm
  
  391   Wed Mar 9 11:09:02 2011 Keerthi Jayamanna  IOS:SSW failedIOS:SSW failed unexpectedly. No reason
found. Came back on easily.
  
  390   Sat Feb 26 22:06:03 2011 Keerthi Jayamanna  Ti+7 status90pA of Ti+7 is running smoothly. 22:05 
Feb26th
  
  389   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall peice of titanium wire is installed
and running aroung 100pA of Ti+7 at FC6.
OSAC are OPs taking data.
  
  388   Fri Feb 25 17:27:11 2011 Keerthi Jayamanna  Titaniums efficiency testSmall piece of titanium foil 0.0005"
thick is installed and running around 100pA
of Ti+7 at FC6.
  
  387   Wed Feb 23 22:29:48 2011 Keerthi Jayamanna  OLIS mahnetKlixon at the OLIS bemding magnet is not
funtioning properly.
  
  386   Tue Feb 22 18:54:43 2011 Keerthi Jayamanna  EE and SSEEBoth EE and SSEE problems were solved.
They are working OK now.
  
  385   Tue Feb 22 18:52:53 2011 Keerthi Jayamanna  Ti+7 efficiency studies2mm diameter Ti was installed to set the
optics. Later 0.0005 in thick foil will be
installed for real efficiency studies.
  
  384   Fri Feb 18 11:43:32 2011 Keerthi Jayamanna  IOS: EE StatusIOS:EE found damaged. It has been replaced
with IOS:SSEE-Michael B.
  
  383   Fri Feb 18 11:05:50 2011 Keerthi Jayamanna  OLIS ProblemsPE set point is ok but read back is half of
the real value.
  
  382   Fri Dec 24 13:06:07 2010 Damien Gallop  Merry Christmas and Happy New YearOur very best to all of you.   
  381   Tue Dec 21 09:43:22 2010 Damien Gallop  In Memoriam... Mike McDonaldAt 5:00 this morning, after a lengthy battle
with cancer, Mike passed from this life to
his eternal reward. He has left us a great
 Mike1526.jpg 
  380   Mon Dec 20 09:50:07 2010 Damien Gallop  MCIS Development & EOBDevelopment and the quest for gold continue.
Later... Mass scans in region of
197Au33 A/q=5.97, with graph of all theoretically
 Picture_5.pngAu_Scan.pngAu_Scan_Zoom.pngAoverQ.png 
  379   Fri Dec 17 09:18:57 2010 Damien Gallop  MCIS DevelopmentDevelopment continues in the search for
gold. A=197 Present A/q=5.94, which suggests
197Au+33. It could also be a tail of 12C+2.
 Picture_1.png 
  378   Wed Dec 15 09:18:41 2010 Damien Gallop  MCIS DevelopmentSource development in preparation for Au
beam in progress.
  
  377   Tue Dec 14 09:15:58 2010 Damien Gallop  MCIS DevelopmentBeam development started yesterday. Looks
like the HERACLES run, which started Thursday,
ended yesterday morning.
  
  376   Tue Dec 7 08:57:26 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentDevelopment should continue today. Looks
like Supernanogan went through a plasma mode
change overnight and settled into a new mode.
 Picture_1.png 
  375   Mon Dec 6 09:08:52 2010 Damien Gallop  80Kr14+/40Ar7+ for SEBT DevelopmentThe previous 12C2+ development run from
the Supernanogan ended Friday morning. Starting
Friday afternoon, the Supernanogan was prepared
 Picture_1.pngPicture_2.pngNoKr.pngWithKr.pngmass7point333.png 
  374   Fri Dec 3 09:37:14 2010 Damien Gallop  12C2+ for CommissioningLast moments of beam development for SEBT
commissioning. Attached is an FC6 plot and
the present optics and 1mm slits. Decision
 15x 
  373   Thu Dec 2 10:02:46 2010 Damien Gallop  12C2+ for CommissioningAccelerator development continues. Save:
101201_2157.snaiosvault. Today's agenda:
emittance scans. Attached: overnight beam
 14x 
  372   Wed Dec 1 08:51:54 2010 Damien Gallop  12C2+ for CommissioningContinuing from Supernanogan. Source touch-up
last evening.
 Picture_2.png 
  371   Tue Nov 30 08:47:47 2010 Damien Gallop  12C2+ for CommissioningCommissioning and development
continue.
 Picture_1.png 
  370   Mon Nov 29 08:55:35 2010 Damien Gallop  12C2+ for CommissioningSupernanogan is online. MCIS:TP3 is off.
It should be on. It is required for best
production of higher charge states.
 Picture_11.png 
  369   Thu Nov 25 11:50:14 2010 Damien Gallop  12C2+ for CommissioningSome start-up teething pains last night.
Decision: Go with the Supernanogan for now.
~20enA on FC6. Save: 101125_1148.snapiosdragon.
 Picture_8.png 
  368   Wed Nov 24 17:08:41 2010 Damien Gallop  12C2+ for SEBT CommissioningSource switchover began at ~15:00.  grab.lq8147.png 
  367   Wed Nov 24 14:02:14 2010 Damien Gallop  85Rb for TITANLast day of 85Rb delivery. Save: 101124_1400_snapiostitan.
Next up: 12C2+ for SEBT commissioning. We
took a few minutes earlier
 Picture_5.pngPicture_6.pngPicture_7.png 
  366   Tue Nov 23 10:31:27 2010 Damien Gallop  85Rb for TITANWe are back to running a Rb beam using
the MWS. The run started last Thursday, November
18th. The previous Rb run ended on Monday,
 Picture_3.png 
  365   Wed Nov 10 09:18:31 2010 Damien Gallop  12C2+ for DRAGON12C2+ beam established yesterday from the
Supernanogan. Tuning to DRAGON began last
evening and is continuing presently.
 Picture_2.pngPicture_3.png 
  364   Tue Nov 9 08:42:38 2010 Damien Gallop  12C2+ for DRAGONA good 12C2+ beam was established yesterday
from the Supernanogan source, driven by background
pressure only; no source gas actively injected.
 Picture_1.pngPicture_1.png 
  363   Mon Nov 8 09:37:03 2010 Damien Gallop  12C2+ for DRAGONThe 85/87Rb run from the MWS ended last
evening as scheduled. The Supernanogan source
was brought online (~21:30 Sunday?) and a
 Picture_1.png 
  362   Fri Nov 5 09:23:53 2010 Damien Gallop  85Rb for PolarizerBeam was used yesterday. Mostly idle overnight.
Looks like a plasma mode change happened
at around 19:00 yesterday. It happens. Or
 Picture_1.png 
  361   Thu Nov 4 09:18:15 2010 Damien Gallop  85Rb for PolarizerSource ran nicely overnight. ICR team set
up a tune into the Polarizer line. Experiment
setup is scheduled to start tomorrow morning.
 Picture_1.png 
  360   Wed Nov 3 09:22:38 2010 Damien Gallop  85Rb for PolarizerYesterday we handed over a 85Rb beam to
ICR. It will be used for a LEBT run using
the Polarizer line. Beam stayed on FC6 overnight.
 Picture_2.pngPicture_1.png 
  359   Tue Nov 2 09:25:30 2010 Damien Gallop  MWS Development85Rb on FC6 overnight. After restarting
the source yesterday following development,
the beam intensity came back, but it's slightly
 Picture_1.pngPicture_1.png 
  358   Mon Nov 1 09:30:15 2010 Damien Gallop  MWS DevelopmentThe source stayed up steadily over the
weekend, with 85Rb on FC6. Not a lot of current,
but pretty good for a first pass. More development
 Picture_45.pngPicture_1.pngPicture_2.pngPicture_3.png 
  357   Fri Oct 29 09:41:20 2010 Damien Gallop  MWS DevelopmentMWS source switchover yesterday was successful.
Leakchecking went well. A small leak on the
intermediate section sealed with a snug on
 6x 
  356   Thu Oct 28 17:51:49 2010 Damien Gallop  MWS switchover for scheduled 85/87Rb beamsA controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared
 grab.N32655.png 
  355   Thu Oct 28 17:51:49 2010 Damien Gallop  MWS switchover for scheduled 85/87Rb beamsA controls issue with IOS:BIAS was found
yesterday. Controls people resolved it today.
MWS source was switched over and prepared
 Picture_1.png 
  354   Wed Oct 27 09:21:59 2010 Damien Gallop  26Mg6+ for TIGRESS EOBThe experiment ran overnight, smoothly,
by the looks of it. Beam is on FC6 now, so
they're likely done. EOB studies on Mg beam
 16x 
  353   Tue Oct 26 09:19:39 2010 Damien Gallop  26Mg6+ for TIGRESSThe TIGRESS run was scheduled to end at
08:30, but has been extended for 24h. The
ICR reports that they are getting "good
 Picture_1.png 
  352   Mon Oct 25 09:05:15 2010 Damien Gallop  26Mg6+ for TIGRESSSmooth delivery (from OLIS point-of-view)
to TIGRESS over the weekend. An SCB RF amplifier
failed yesterday and was replaced. Tuning
 Picture_3.png 
  351   Fri Oct 22 09:35:24 2010 Damien Gallop  26Mg6+ for TIGRESSA 26Mg beam was handed over to TIGRESS
last evening. It is 26Mg6+ through ISAC-I
and further stripped to 26Mg10+ by the time
  
  350   Thu Oct 21 11:46:14 2010 Damien Gallop  26Mg6+ for TIGRESSThe MWS was restarted yesterday, and a
26Mg beam re-established. ICR set up into
ISAC-II overnight, and tuning to TIGRESS
 Picture_14.png 
  349   Wed Oct 20 11:30:32 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS ran fine overnight. It was shut off
this morning to investigate bias sparking
issue, noted on FR#4894. The two MCIS turbopump
 Picture_6.pngPicture_7.pngPicture_9.png 
  348   Tue Oct 19 09:20:40 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS operating nicely.  Picture_1.png 
  347   Mon Oct 18 09:22:35 2010 Damien Gallop  26Mg6+ for TUDA-IIMWS is producing 26Mg, presently parked.
It was used over the weekend
for TUDA tuning.
 Picture_5.png 
  346   Fri Oct 15 09:23:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource is running nicely. Hand-off
to ICR occurred ~Wednesday night. Setup done
overnight.
 Picture_2.png 
  345   Wed Oct 13 16:15:03 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource conditioning most of today, to 59kV.
Striptool attached. Reset to 26Mg tune at
~16:00.
 Picture_1.png 
  344   Tue Oct 12 13:25:21 2010 Damien Gallop  MWS switchover for scheduled 24/26Mg beamsSource switchover in progress on WP#2010-10-12-1.
Magnesium material installed into MWS. Pumpdown
 grab.J26422.pnggrab.J27689.png 
  343   Fri Oct 8 09:35:03 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESSBeam from MWS quietly sitting on FC6 awaiting
tune checks to TIGRESS. Next experiments
up are 26Alg5+ to TUDA and 24Na5+ to TIGRESS.
 Picture_1.png 
  342   Mon Oct 4 09:46:12 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setupA 20Ne1+ beam from the MWS was established
on Friday. Line tuning began Friday evening.
A tune to the front of the SC LINAC was in
  
  341   Mon Oct 4 09:40:30 2010 Damien Gallop  OLIS Maintenance and Development completedThe September Mini-Shutdown is now a memory.
The few days available to OLIS were used
for MCIS Development on 197Au. Productive.
  
  340   Fri Sep 24 13:22:00 2010 Damien Gallop  OLIS Maintenance and DevelopmentSupernanogan on overnight, in the search
for gold. A trace of 197Au34 observed this
morning. Development continues.
  
  339   Thu Sep 23 09:20:34 2010 Damien Gallop  4He1+ for DRAGONDRAGON continues to take MWS beam.
Later... 14:00 EOB. Prepare for Mini-Shutdown.
 Picture_1.pngPicture_1.pngPicture_2.pngPicture_3.png 
  338   Mon Sep 20 09:34:44 2010 Damien Gallop  4He1+ for DRAGONMCIS Development finished Friday evening.
OLIS switched to MWS operation and setup
began for 4He1+ delivery to DRAGON. Beam
  
  337   Fri Sep 17 14:02:29 2010 Damien Gallop  MCIS DevelopmentToday's agenda: RF frequency scans and
generally getting a feel for the new sputter
source.
 Picture_3.pngPicture_5.pngPicture_2.pngAu25beam.pngAubeamNoSputter.png 
  336   Thu Sep 16 17:06:22 2010 Damien Gallop  MCIS DevelopmentA new sputter source was installed onto
the Supernanogan. A wire of Au is installed
in the source. Mass scans this morning with
 grab.yx5537.pngmcis2010sep16Au.png 
  335   Tue Sep 14 09:18:28 2010 Damien Gallop  MCIS DevelopmentThe 16O3+ DRAGON run just finished. MCIS
Development begins this morning for a few
days. The goal is to install and characterize
 8x 
  334   Fri Sep 10 10:38:13 2010 Damien Gallop  16O3+ for DRAGON   grab.E24058.png 
  333   Fri Aug 13 09:27:49 2010 Damien Gallop  4He1+ for SCC DevelopmentMWS is running nicely. SCC development
continues. This is scheduled to end on this
coming Tuesday morning. It will likely continue
 Picture_12.png 
  332   Wed Aug 11 10:35:03 2010 Damien Gallop  4He1+ for SCC DevelopmentBeam used into last evening, then idle
overnight. Nice and stable. Maintenance Day
for the cyclotron and ISAC.
 Picture_1.png 
  331   Tue Aug 10 09:30:36 2010 Damien Gallop  4He1+ for SCC DevelopmentBeam idle overnight, and grew nicely. Source
tweaked up and throttled back a little while
ago. SCC development expected to continue
 Picture_2.png 
  330   Mon Aug 9 10:38:43 2010 Damien Gallop  4He1+ Setup for SCC DevelopmentWe have a request
for changing over the source to 4He1+ operation
from the MWS.
  
  329   Mon Aug 9 09:09:36 2010 Damien Gallop  35Cl2+ for DRAGONBeam ran quietly over the weekend, with
the anticipated intensity drop-off. Source
gas canister at ~15"Hg and IOS at 3.3e-7
 Picture_24.png35Cl2_Startup.png 
  328   Fri Aug 6 09:50:22 2010 Damien Gallop  35Cl2+ setup for DRAGONFirst beam appearing on FC6 presently,
after the source pumped overnight. Source
gas valving set up earlier this morning.
 6x 
  327   Thu Aug 5 18:56:48 2010 Damien Gallop  35Cl2+ setup for DRAGONOLIS off Wednesday morning for source changeover
from 16O3+ to 35Cl2+. We have elected to
use the MWS for this run. Supernanogan is
  
  326   Thu Aug 5 17:47:04 2010 Damien Gallop  16O3+ for TIGRESS EOB Tuesday a.m.Delivery of 16O3+ for TIGRESS "buddy
beam" purposes ended early Tuesday morning,
 16O3_for_TIGRESS.png 
  325   Tue Aug 3 09:31:30 2010 Damien Gallop  16O3+ for TIGRESSBeam idle for most of the weekend. Some
ion source ups and downs, in part due to
a WFB setting on the edge. Tuning began last
 Picture_9.png 
  324   Fri Jul 30 09:09:35 2010 Damien Gallop  16O3+ for TIGRESSSupernanogan is online. Setup done last
night. There is room for tweaking, but stable
3enA on FC6 of 16O3+ presently. We'll see
 Picture_4.pngPicture_5.pngPicture_6.pngPicture_7.png 
  323   Thu Jul 29 18:12:38 2010 Damien Gallop  16O3+ SetupSo... the long-awaited word to switch OLIS
beams and sources finally came through...
at 17:45.
 6x 
  322   Thu Jul 29 15:31:21 2010 Damien Gallop  4He1+ for TIGRESSBeam in use intermittently.   
  321   Wed Jul 28 09:23:57 2010 Damien Gallop  4He1+ for TIGRESSSource switchover went quite well yesterday
morning. About 6nA of beam on FC6. Beam idle
overnight. Tuning has resumed now.
 Picture_1.png 
  320   Tue Jul 27 08:55:49 2010 Damien Gallop  OLIS MaintenanceToday we switch from 74Ge1+ to 4He1+, about
as wide a switch as we've done at OLIS. We
will use the MWS for the 4He.
 Picture_4.pngPicture_5.pngPicture_6.png 
  319   Mon Jul 26 09:41:46 2010 Damien Gallop  74Ge1+ to TITANBeam is sitting on FC6 presently. Good
source operation over the weekend. Some pics
to come. RIB delivery to TITAN ended at 08:30
  
  318   Fri Jul 23 13:00:04 2010 Damien Gallop  74Ge1+ to TITANBeam remained on FC6 overnight. Beam was
used for a tune check this morning. At noon
today beam was switched to 4He.
 Picture_4.pngPicture_3.png 
  317   Thu Jul 22 09:25:21 2010 Damien Gallop  74Ge1+ to TITANThe Supernanogan is producing 74Ge
using the heater source, a first for the
Supernanogan. Development done over the last
 Picture_3.png 
  316   Tue Jul 20 09:38:45 2010 Damien Gallop  OLIS MaintenanceOur work permit to leakcheck the Supernanogan
and IOS was signed this morning. The source
is off presently, and work is underway. The
 Picture_3.png 
  315   Mon Jul 19 10:56:53 2010 Damien Gallop  12C2+ for TIGRESSBeam from the Supernanogan remains on standby
for TIGRESS pilot beam. There were a couple
of source trips over the weekend, at least
 Picture_2.png 
  314   Fri Jul 16 10:22:35 2010 Damien Gallop  12C2+ for TIGRESSTuning to TIGRESS is continuing. There
is a full expectation that they will take
RIB over the weekend.
 Picture_1.png 
  313   Wed Jul 14 09:23:19 2010 Damien Gallop  12C2+ for TIGRESSOLIS is set up for 12C2+ delivery, with
about 13enA on FC6 from the Supernanogan
source presently. Beam was reasonably stable
 Picture_1.png 
  312   Tue Jul 13 18:33:04 2010 Damien Gallop  OLIS Maintenance and DevelopmentA source switchover day was negotiated,
with a goal to provide 12C2+ beam. As a practical
matter, it's been an OLIS Maintenance Day,
  
  311   Mon Jul 12 10:55:14 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam used sporadically over the weekend.
Note temperature response in beam. A power
bump occurred at about 10:00, knocking out
 Picture_1.png 
  310   Fri Jul 9 10:00:03 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningSource drifted overnight. Operators made
a slight correction to silence an alarm.
I have tweaked this up. Shown below are before
 8x 
  309   Thu Jul 8 09:38:36 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Source conditioned
and changed a bit. Slight tweaking required
to bring it back to stable.
 Picture_5.png 
  308   Wed Jul 7 15:21:36 2010 Damien Gallop  16O1+ for SCC CommissioningA 16O1+ beam from the MWS is being used
for SCC development and commissioning by
agreement. Some sideshows getting there.
  
  307   Tue Jul 6 19:10:33 2010 Damien Gallop  OLIS MaintenanceSource pulled down for Mg removal and cleanup.
Done. Supernanogan refurbishing of MCIS optics
complete, plus a comple of other items. Opened
 grab.CK3013.png 
  306   Tue Jul 6 08:57:33 2010 Damien Gallop  26Mg6+ for TIGRESS EOBPhoto-finish for TIGRESS this morning,
apart from a cavity trip
at around 6:00 a.m.. The MWS is running very
 Picture_2.pngPicture_3.pngPicture_4.png 
  305   Mon Jul 5 11:58:49 2010 Damien Gallop  26Mg6+ for TIGRESSBeam was switched from 24Mg5+ to 26Mg6+
on Canada
Day. Also, the source blinked out on
 Picture_1.png 
  304   Wed Jun 30 09:11:25 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery / standby continues.  Picture_2.pngPicture_3.png 
  303   Tue Jun 29 09:16:33 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery to TIGRESS has begun. Beam from
the source looks perfect. Looks  like happy
times for them. The plan is to eventually
 6x 
  302   Mon Jun 28 09:19:16 2010 Damien Gallop  24Mg5+ to TIGRESSDelivery looks like it was pretty smooth
over the weekend. TIGRESS expects to receive
24Na from ITW via the CSB this week. Yield
 Picture_1.png 
  301   Thu Jun 24 11:52:34 2010 Damien Gallop  24Mg5+ to TIGRESS setupTuning into ISAC-II was done yesterday,
and continues today. The source was idle
overnight. There were a couple of magnesium
 Picture_2.png 
  300   Wed Jun 23 09:17:34 2010 Damien Gallop  24Mg5+ to TIGRESS setupMass change yesterday morning from 26Mg1+
to 24Mg1+ from the MWS. It was tough to get
stable beam from the source, and there are
 Picture_1.pngPicture_2.pngPicture_3.pngPicture_1.png 
  299   Tue Jun 22 08:42:33 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam was redirected to TIGRESS yesterday.
RIB delivery to TIDA-II was rendered impossible
due to a failure in the target or module.
 Picture_3.png 
  298   Mon Jun 21 09:20:30 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam waiting quietly on FC6. There was
a power
bump on Friday just after noon that tripped
 Picture_1.pnggrab.oS5646.png 
  297   Thu Jun 17 09:21:56 2010 Damien Gallop  26Mg6+ for TUDA-IITUDA-II began taking beam around midnight
last night. Beam on FC6 for a good part of
the night. Steady as she goes.
 Picture_1.png 
  296   Wed Jun 16 10:12:58 2010 Damien Gallop  26Mg6+ for TUDA-IIBeam idle overnight. Beam is being used
as a pilot beam for this run. Source was
knocked off by a power
 Picture_1.png 
  295   Mon Jun 14 09:44:06 2010 Damien Gallop  26Mg6+ for TUDA-IIOn Saturday we opened the MWS and set it
up for Mg operation. Everything went well.
We are using the pair of half-moon Mg metal
 Picture_4.png 
  294   Sat Jun 12 11:23:40 2010 Damien Gallop  26Mg6+ to TUDA-II source setupAfter EOB activities from 15N4+ run that
ended this morning, we have begun preparations
to switch over the ion sources. Turbos off
 grab.x14118.png 
  293   Sat Jun 12 10:20:14 2010 Damien Gallop  15N4+ to TIGRESS doneDelivery to TIGRESS ended this morning
as scheduled. ICR took nice emittance
scans and is completing a target snapshot
 13x 
  292   Fri Jun 11 09:21:24 2010 Damien Gallop  15N4+ to TIGRESSDelivery of 15N4+ to TIGRESS continues.
Source gas canister is still at ~-22"Hg,
and MCIS pressure is 7.2e-8 Torr. ICR reported
 Picture_1.png 
  291   Thu Jun 10 09:17:42 2010 Damien Gallop  15N4+ to TIGRESSDelivery to TIGRESS began yesterday
or so. ICR reported beam intensity drops
overnight. I'll look at it presently. Meanwhile,
 Picture_1.pngPicture_2.pngPicture_3.png 
  290   Wed Jun 9 10:07:33 2010 Damien Gallop  15N4+ to TIGRESSSetup into ISAC-II began last night. Tuning
is in progress now. Beam on FC6 overnight.
Canister pressure is -22"Hg and MCIS
 Picture_7.png 
  289   Tue Jun 8 09:27:54 2010 Damien Gallop  15N4+ to TIGRESSUser tuning began Sunday night. Beam physics
expert chose to retire the IOS:Q1 defeat,
as he did not know until yesterday that it
 Picture_4.pngPicture_5.png 
  288   Mon Jun 7 10:36:14 2010 Damien Gallop  15N setup over the weekendKeerthi set up the Supernanogan for 15N
operation and destined for TIGRESS, using
two source gas options: a miniature bottle
 Picture_2.png 
  287   Fri Jun 4 09:30:48 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ continues to DRAGON for
the final day. Some online tuning of the
line overnight. Source gas canister pressure
 Picture_2.png 
  286   Thu Jun 3 09:29:11 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues until
Saturday morning. All the signs are that
beam is excellent. Source gas canister is
 Picture_1.png 
  285   Wed Jun 2 09:19:04 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. It
is Maintenance Day for everybody else today.
Source gas canister pressure = -20"Hg.
  
  284   Tue Jun 1 09:12:39 2010 Damien Gallop  33S to DRAGON33S6+ delivery to DRAGON continues. Looks
like there was an RF tweak overnight. Source
gas canister still at ~-20"Hg. MCIS
 Picture_2.png 
  283   Mon May 31 09:18:39 2010 Damien Gallop  33S to DRAGONDelivery of 33S6+ to DRAGON continues.
A couple of RF tweaks done over the weekend.
Source gas canister pressure at -20"Hg.
 Picture_2.png 
  282   Fri May 28 11:02:59 2010 Damien Gallop  33S to DRAGONBeam tuning in progress. Source gas canister
at -20"Hg. MCIS pressure at 7.62e-8
Torr.
 Picture_1.png 
  281   Thu May 27 09:11:10 2010 Damien Gallop  33S Development and Handover33S on FC6 overnight. Preparing to send
beam to DRAGON
now, and confirm isotope.
 Picture_2.png 
  280   Wed May 26 18:16:10 2010 Damien Gallop  33S DevelopmentSome 3enA of beam on FC6 presently. Let
it sit.
 grab.Cm6004.png 
  279   Tue May 25 22:02:41 2010 Keerthi Jayamanna  33S spectrum33S spectrum is saved as 33S_spectrum.dat    
  278   Tue May 25 11:58:02 2010 Keerthi Jayamanna  33S devafter 24 hours background spectrum saved
as "BackgroungNo33S003.dat"
RF Amplitude :7.767 , RFoutput power=
  
  277   Tue May 25 11:28:00 2010 Keerthi Jayamanna  33D devafter 24 hours background spectrum saved
as "BackgroungNo33S002.dat"
RF Amplitude :1.553 , RFoutput power=
  
  276   Tue May 25 00:19:18 2010 Keerthi Jayamanna  33S 
Finally
got something going. YCB1 short to the ground.
  
  275   Mon May 24 22:42:51 2010 Keerthi Jayamanna  33S developmentTried to see the background before 33S
installation. Found few problems: MCIS:YCB1
 Picture_1.png 
  274   Wed May 19 09:55:51 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESSISAC-I tuning done yesterday. TBC today
into ISAC-II. Beam very nice overnight.
 Picture_6.png 
  273   Tue May 18 09:15:16 2010 Damien Gallop  20Ne1+ at 40.8keV for TIGRESS setupPrepare to switch beam from 22Ne2+ to 20Ne1+.
Skimmers from 22Ne2+ run shown below. Table
of tune options below. We will be using the
 8x 
  272   Tue May 18 09:03:32 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1 EOBEOB for SEBT1 run at 08:30, taking 11Li
from ITE and 22Ne2+ from OLIS when needed.
Attempted emittance scans last evening, but
 Picture_6.pngPicture_7.pngPicture_8.png 
  271   Mon May 17 09:09:50 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Last day of this pilot beam to TUDA-II.
Expect a beam switch tomorrow for sake of
TIGRESS.
 Picture_6.png 
  270   Fri May 14 08:50:56 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1MWS continues to provide 22Ne2+ for pilot
beam use. Beam quietly sitting on FC6. Stripchart
attached. Also, Supernanogan plasma is on
 Picture_5.png 
  269   Thu May 13 09:25:38 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Beam continues to be reserved for E1147
pilot beam use. Beam was nice and stable
overnight, as expected. Beam (blue) followed
 Picture_1.pngPicture_2.png 
  268   Wed May 12 13:40:01 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Back to pilot beam status as of around
18:00 last night. A couple of sideshows through
the evening. ICR made an elog entry about
 Picture_2.pngPicture_1.png 
  267   Tue May 11 08:55:41 2010 Damien Gallop  Supernanogan developmentLeak checking on the Supernanogan continues
today. We are preparing for an up-coming
33S run, for which we want "perfect"
 grab.tg1846.pnggrab.bE1993.pnggrab.ed2041.pnggrab.or2050.png 
  266   Mon May 10 16:42:55 2010 Damien Gallop  Supernanogan developmentBy agreement, the source came down this
morning for continuing Supernanogan development.
Main event: leak detecting.
  
  265   Mon May 10 09:39:34 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Supernanogan development, mainly for the
sake of the upcoming 33S run, took place
for a little while on Friday. It was expected
 Picture_1.png 
  264   Fri May 7 19:10:05 2010 Keerthi JayamannaRoutineGeneralOLIS statusMW source is back and running.
A new vacuum
chamber is added to the Supernanogan RF block.
SO2
is not filled in yet.
  
  263   Fri May 7 12:29:41 2010 Keerthi Jayamanna  Supernanogan developmentSupernanogan development for 33S started.
All MW and MW and MCIS power sypplies are
off.
  
  262   Thu May 6 14:33:07 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Beam from MWS remains quietly sitting on
FC6, on standby for pilot beam use to SEBT1.
The cyclotron is still down with cryogenerator
 Picture_1.png 
  261   Wed May 5 09:46:40 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Beam on standby for pilot beam. Cyclotron
is still down with vacuum troubles since
~03:00, so no RIB to ISAC.
  
  260   Tue May 4 14:19:18 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Beam from MWS continues for pilot beam
use into SEBT1. There are cyclotron issues
with cryogenics, so 11Li delivery from ITE
  
  259   Mon May 3 18:12:12 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Beam was switched on Friday morning from
16O1+ to 22Ne2+. This time it's a pilot beam
for a 11Li experiment.
  
  258   Fri Apr 30 13:02:17 2010 Damien Gallop  22Ne2+ at 22.44keV for SEBT1Mid-morning the source was switched over
from 16O1+ to 22Ne2+ operation for a new
experiment. OLIS will be used as the pilot
  
  257   Fri Apr 30 12:58:21 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Delivery to S1151 went quietly overnight
for their last few hours. The run ended at
~08:30 as scheduled. Marco and ICR did some
 grab.s30283.pnggrab.Y30291.pnggrab.z30299.png 
  256   Thu Apr 29 09:11:27 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Another quiet night of beam to S1151.  Picture_5.png 
  255   Wed Apr 28 10:08:05 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Beam delivery continued nicely through
the night.
Yesterday Controls repaired and reinstalled
 Picture_4.png 
  254   Tue Apr 27 09:04:13 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Nominal beam operation to SEBT2 overnight.
A chart of beam over the last few days is
attached. There is a step change in the separator
 Picture_1.pngPicture_3.pnggrab.NQ9764.png 
  253   Mon Apr 26 10:58:46 2010 Damien Gallop  16O1+ at 32.64keV to SEBT2Our first experiment of the year started
right around midnight last night, after extensive
tuning. As I understand it, S1151
 Picture_1.png 
  252   Fri Apr 23 10:18:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningMarco and experimenters are busy at it,
tuning the DTL. Regarding the source, he
is "happy as always!" Well, that
 Picture_4.png 
  251   Thu Apr 22 14:57:25 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningAccelerator development continued this
morning. Beam from source was reported to
be "good". ICR showed me their
  
  250   Wed Apr 21 15:30:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam up as of last evening. Controls performed
some network upgrades today, which impacted
beam operations. One glitch on our side:
 Picture_8.png 
  249   Tue Apr 20 09:02:18 2010 Damien Gallop  OLIS MaintenanceMaintenance Day for OLIS started late yesterday
afternoon. Source up at end of the day. See
attached Stripchart and in particular how
 Picture_3.pngPicture_4.pngPicture_5.png 
  248   Mon Apr 19 17:12:55 2010 Damien Gallop  OLIS MaintenanceJust in: an active work permit for OLIS
maintenance. Underway through tomorrow (Tuesday)
evening.
  
  247   Mon Apr 19 10:11:17 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningDevelopment on Friday; idle over the weekend.
Stripchart attached.
Meanwhile, there was a power bump
 Picture_1.pnggrab.a19570.png 
  246   Fri Apr 16 09:26:01 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam development through accelerators continues
today. Beam was rock-stable overnight.
 grab.Ft9922.png 
  245   Thu Apr 15 09:39:11 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningYesterday's RF troubles in ISAC-I are reportedly
solved. Beam development is expected to resume
this morning.
  
  244   Wed Apr 14 17:28:32 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam reserved for continuing accelerator
development, but there are some ISAC-I RF
phase troubles. However, maintenance was
  
  243   Tue Apr 13 10:20:27 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningAccelerator commissioning has resumed for
the day. Beam was nice and stable overnight.
See attached Stripchart.
 Picture_3.png 
  242   Mon Apr 12 11:53:22 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam was used last week for DRAGON commissioning.
Successful run, completed yesterday, as reported
by Colin this morning.
 Picture_1.pngPicture_2.png 
  241   Thu Apr 1 09:23:08 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam idle overnight. Another night of super-stable
beam. If no users today, then we may take
it for MRO.
 Picture_1.png 
  240   Wed Mar 31 09:43:30 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioningBeam set up for accelerator commissioning.
Sophia took beam yesterday. Beam idle overnight.
Stripchart of overnight performance attached.
 Picture_13.png 
  239   Tue Mar 30 10:27:09 2010 Damien Gallop  16O1+ at 32.64keV for accelerator commissioning16O1+ beam requested yesterday. Source
switched over and beam ready by evening.
Nice overnight Stripchart, attached. Sophia
 Picture_12.png 
  238   Mon Mar 29 12:15:00 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningOLIS sprung a water leak last night. Problem
was sparking through a coiled  cooling
line. I replaced the pair of cooling lines
  
  237   Fri Mar 26 09:31:04 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam idling overnight. Yesterday ICR called
me regarding an IOSIOC reboot and consequent
fallout. In short, it turned off IOS:MB.
 Picture_10.png 
  236   Thu Mar 25 12:43:16 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam stable as a rock overnight. Pity we
have no-one using it at the moment! Stripchart
attached.
 Picture_8.png 
  235   Wed Mar 24 11:42:32 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningBeam is on standby. Target
snapshot in IOPS elog.  Over the
last little while...
 Picture_9.png 
  234   Fri Mar 19 09:00:21 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioningMWS is running well. Tune save: 100319_0901.snapiosdragon
with beam observed to Prague magnet. Stripchart
of last 24h attached.
 Picture_5.png 
  233   Wed Mar 17 09:25:27 2010 Damien Gallop  20Ne1+ at 40.8keV for accelerator commissioning20Ne1+ set up from the MWS and handed over
to Sophia & Marco for accelerator recommissioning.
Strip to 5+ at M:5. First day of beam. Happy
 Picture_2.pngPicture_3.pngPicture_4.png 
  232   Fri Mar 12 11:35:34 2010 Keerthi  Cusp water coolingCusp source water cooling (#4)  interlick
does not work.
  
  231   Fri Mar 12 11:33:09 2010 Keerthi  IOS:IG!IOS:IG1 is faulty. Need to replac it during
next earliest window.
  
  230   Thu Mar 11 23:02:18 2010 Keerthi  OLIS status after shutdownMicrowave source is up and running.
Supernanogan: grounding rod is stuck,
RF generator does not clear the interlocks
  
  229   Fri Feb 19 17:54:40 2010 Damien Gallop  OLIS Shutdown in progressPartial disassembly of DB1 optics today.
Shielding of insulators is definitely working
and indicated for unshielded insulators.
 DSCN7351.JPGDSCN7355.JPG 
  228   Wed Feb 17 18:28:33 2010 Damien Gallop  OLIS Shutdown in progressMore materials prepared for optics refit.   
  227   Tue Feb 16 16:04:18 2010 Damien Gallop  OLIS Shutdown in progressPreparations for rewiring the DB1/3 optics
have begun. Sgan gas manifold work is in
progress. Note: IOS:MP1 is scheduled for
  
  226   Fri Feb 12 14:42:06 2010 Damien Gallop  OLIS Shutdown in progressSupernanogan cart removed from Faraday
cage to dock today. Some beam safety tests
on FC6 in progress presently. FC3 was already
 8x 
  225   Wed Feb 10 17:18:24 2010 Damien Gallop  OLIS Shutdown in progressOLIS Shutdown has been in progress for
a week. IOS is vented, was swiped clean and
opened. DB3 was craned out, a precision job.
  
  224   Wed Feb 3 16:30:02 2010 Damien Gallop  OLIS Shutdown began todayWe prepared stuff last night. This morning
we vented IOS to argon, then swiped. Clean.
Lu and Ajit craned out DB3 for us. Nice job,
  
  223   Tue Feb 2 10:06:41 2010 Damien Gallop  Supernanogan development wind-upWe ran 32S5+ overnight. Keerthi has been
working with the new surface source oven
for the last couple of weeks. His results
 9x 
  222   Fri Jan 15 15:30:02 2010 keerthi  Supernanogan oven start upVoltage             
Current          
  MCIC:IG1
  
  221   Thu Jan 14 09:57:05 2010 Damien Gallop  20Ne1+ beam from MWS for 8pi diagnosisBeam is on for 8pi diagnosis by special
request.
We set up beam in IOS yesterday.
 9x 
  220   Wed Jan 13 18:16:22 2010 Damien Gallop  OLIS development with MWS at 28keVWe will be delivering a 28keV beam to the
tuning boys tomorrow for further diagnosis
of the 8pi line. In anticipation, I restarted
 6x 
  219   Mon Jan 11 17:46:31 2010 Damien Gallop  OLIS development for 4He2+ beam loose endsOLIS was shut down over Christmas. We did
a "soft start" of the MWS last
Tuesday, after refurbishing and installation
 grab.r14041.pnggrab.Q14048.pnggrab.h14058.png 
  218   Mon Jan 11 17:40:07 2010 Damien Gallop  Happy New Year!Welcome to 2010. Shutdown is underway across
the site, while beam development is going
on at OLIS.
  
  217   Thu Dec 24 10:13:00 2009 Damien Gallop  OLIS development 20Ne1+ from MWSThe MWS stayed up flawlessly overnight.
Beam grew from about 2µA to over 5µA
this morning. Was it the pre-conditioning
 Picture_5.png 
  216   Wed Dec 23 11:09:37 2009 Damien Gallop  OLIS developmentSo... lots has happened.
* Supernanogan *
Heater components installed in plasma
 7x 
  215   Mon Dec 21 10:22:33 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi and Marco achieved visible 4He2+
through the RFQ on Friday (or so). Mass spec
attached. Development continues today.
 grab.I28800.pngPicture_8.png 
  214   Fri Dec 18 13:14:01 2009 Damien Gallop  OLIS development for CUSP source continued Yesterday: Busy! Source filment changed
last night. Source pumped overnight. First
start this morning.
 9x 
  213   Wed Dec 16 14:07:37 2009 Damien Gallop  OLIS development for CUSP source continued Today we vary source gas pressure.
Later... Several iterations of pressure,
tuning and standing on our heads. Representative
 grab.n10208.pnggrab.o10214.pnggrab.G10224.pnggrab.T10230.png 
  212   Tue Dec 15 17:50:38 2009 Damien Gallop  OLIS development for CUSP source continued Four larger apertures were installed yesterday.
This morning we fired up the modified source.
It lit immediately. Plenty of beam. Development
  
  211   Mon Dec 14 10:01:52 2009 Damien Gallop  OLIS development for CUSP source continuedDevelopment over the weekend. Results to
come. Restart source now and let it warm
up. 4He2+ on FC6. Plasma at zero, to duplicate
  
  210   Fri Dec 11 18:03:30 2009 Damien Gallop  OLIS development for CUSP source continued Today we swapped power supplies between
the arc and plasma electrode. This gives
us a higher voltage range on the arc, at
  
  209   Thu Dec 10 08:59:05 2009 Damien Gallop  OLIS development for CUSP source continued Source stayed up quietly overnight. Current
dropped off gradually. I will tweak things
shortly.
 Picture_12.pngPicture_13.png 
  208   Wed Dec 9 10:24:45 2009 Damien Gallop  OLIS development for CUSP source continuedCUSP source was off for the night, following
Keerthi's development. He had increased the
current on FC6 and the arc current substantially.
 grab.k18688.pngPicture_5.pngPicture_6.pngPicture_7.pngPicture_8.png 
  207   Tue Dec 8 12:40:17 2009 Damien Gallop  OLIS development for CUSP source continuedFuse for FUG power supply obtained and
installed. Source is up and warming up. ~100enA
on FC6.
 grab.M11379.pnggrab.S11386.png 
  206   Mon Dec 7 09:48:24 2009 Damien Gallop  OLIS development for CUSP source continuedThe OLIS cage was open over the weekend.
IOS pressure is in the 4e-7 range, with source
gas manifold closed and external helium bottle
 Picture_4.png 
  205   Fri Dec 4 18:15:19 2009 Damien Gallop  OLIS development for CUSP source - gas lines & waterWe received back the source this morning.
First order of business was to take some
EOB scans. See earlier entry. Then we shut
  
  204   Fri Dec 4 09:58:08 2009 Damien Gallop  20Ne1+ at 28keV for 8pi delivery completeMike declared successful EOB this morning.
"Best beam I ever used" or something
like that! EOB emittance and mass scans attached.
 grab.InU319.pnggrab.YPZ323.pnggrab.RXD329.pnggrab.aGj522.pngPicture_1.png 
  203   Thu Dec 3 14:12:56 2009 Damien Gallop  20Ne1+ at 28keV for 8pi delivery continuesBeam was idle overnight. We took the beam
for a while this morning, and ran a mass
scan. We opted to not go into the cage to
 Picture_20.png 
  202   Wed Dec 2 19:03:55 2009 Damien Gallop  20Ne1+ at 28keV for 8pi deliveryThe source ran well overnight and today.
There is an issue with an ILE Faraday cup.
Tuning is ended for today, and beam is on
 Picture_19.png 
  201   Tue Dec 1 12:33:58 2009 Damien Gallop  20Ne1+ at 28keV for 8piBy agreement, we are providing OLIS beam
to the Beam Delivery group for the purpose
of checking out transmission in the 8pi line.
 8x 
  200   Tue Dec 1 09:27:17 2009 Damien Gallop  OLIS development for CUSP source - first overnight runningThe CUSP source ran well overnight, notwithstanding
local control of source power supplies. Filament
supply had dropped to 115A this morning,
 Picture_16.pngPicture_15.png 
  199   Mon Nov 30 16:53:31 2009 Damien Gallop  20Ne1+ to 8pi planned for tomorrowOLIS beam to 8pi is planned for tomorrow.
A 20Ne1+ beam of ~3nA at 28keV is the agreement.
The 8pi line diagnosis is likely to take
  
  198   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
  
  197   Mon Nov 30 15:41:00 2009 Damien Gallop  OLIS development for CUSP source - initial testsWe completed the services by end of last
week. Of course they could always be better,
but everything is fine for this iteration.
 Picture_14.png 
  196   Fri Nov 27 13:36:09 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dArc power supply replaced. Water leaks
down to one or two pinholes on source body;
manageable. Minor mechanical in progress.
  
  195   Thu Nov 26 16:08:42 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dServices completed today. There are still
some teething pains, particularly the arc
p/s as noted earlier. But we did have some
 grab.I31500.png 
  194   Thu Nov 26 06:22:58 2009 Keerthi Jayamanna  Cusp sourceArc power supply does not hold any voltage.   
  193   Thu Nov 26 06:20:21 2009 Keerthi Jayamanna  Supernanogan DevelopmentSwiched off all the pumps and ion gauge
for oven installation.
 
  
  192   Tue Nov 24 13:55:55 2009 Damien Gallop  OLIS development for CUSP source - installation cont'dKeerthi found and fixed a couple more vacuum
leaks last night. Present vacuum at IOS:IG1
= 4.4e-7 Torr. Electrical and water services
  
  191   Mon Nov 23 10:32:34 2009 Damien Gallop  OLIS development for CUSP source - installation cont'd4He2+ "alpha" CUSP source under
vacuum: IOS:IG1=7.3e-7 Torr. Electrical installations
today.
  
  190   Fri Nov 20 17:26:57 2009 Damien Gallop  OLIS development for CUSP source - installationToday we installed the CUSP "alpha"
source on the MWS port at OLIS. It is vacuum-tight.
Looking good. Also we installed remaining
  
  189   Thu Nov 19 11:14:19 2009 Damien Gallop  OLIS development for CUSP sourcePumps were switched off last night. IOS
was vented to Ar and swiped clean this morning.
MCIS ready for disembarking from F-cage.
  
  188   Wed Nov 18 23:46:14 2009 Keerthi Jayamanna  OLIS development startedAll turbos in the OLIS and MCIS are off.
No controls for the MCIS. Pumps switched
of by pulling the CG cable.
  
  187   Tue Nov 17 09:18:37 2009 Damien Gallop  21Ne4+ to DRAGON for charge distribution studiesAfter their EOB with 17O3+ yesterday, DRAGON
switched to 21Ne4+ running for charge distribution
studies. Keerthi changed over the source
 Picture_2.pngPicture_1.pngPicture_2.pngPicture_5.png 
  186   Mon Nov 16 10:00:41 2009 Damien Gallop  17O3+ beam to DRAGON end of run this morningDRAGON declared EOB at around 08:00 today.
Source and beam were switched to 21Ne4+ for
calibration studies.
 Picture_1.png 
  185   Fri Nov 13 10:26:07 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam and energy changes continued over
the weekend. The ICR reports that things
are going swimmingly, and that the users
 Picture_1.pngPicture_2.png 
  184   Tue Nov 10 09:36:39 2009 Damien Gallop  17O3+ beam to DRAGON continuingBeam ran well overnight. Last evening Vacuum
Group diagnosed and repaired a catastrophic
leak in the ILT cross region. You can see
 Picture_1.png 
  183   Mon Nov 9 09:30:10 2009 Damien Gallop  17O3+ beam to DRAGONBeam delivery continued through the weekend.
As noted on Saturday, current dropped precipitously
due to source gas pressure. We have 2.3e-6eµA
  
  182   Sat Nov 7 12:21:35 2009 Keerthi Jayamanna  17O hand valve status17O+3 at FC6 became 550nA.
17O hand valve found to be closed.
Probable cause may be the cold weather.
  
  181   Fri Nov 6 11:17:54 2009 Damien Gallop  17O3+ setup to DRAGONAs noted, we handed over the beam to our
users yesterday by noon. Setup to DRAGON
is continuing. The report this morning that
 Picture_9.png 
  180   Thu Nov 5 09:45:03 2009 Damien Gallop  MCIS online with 17O3+ on FC6 overnightBeam was quiet overnight. Keerthi touched
up the tune this morning, and it is quieter
yet and a little more of it too.
 Picture_7.png 
  179   Wed Nov 4 09:46:07 2009 Damien Gallop  MCIS online with 17O3+ on FC6 for developmentBeam stayed up overnight nicely. Development
today. RF scans in progress now.
Later... scanning done for the moment.
 9x 
  178   Tue Nov 3 09:25:31 2009 Damien Gallop  MCIS online with 17O3+ on FC6 overnightWe completed 33S operation last night,
and roughed in a setup for 17O. We had 17O3+
on FC6 overnight; chart attached. It grew
 Picture_1.png 
  177   Mon Nov 2 17:42:54 2009 Damien Gallop  MCIS online with 17O3+ on FC6As noted earlier, we have opened the OLIS
cage and set up the source gases for 17O
operation. It will take a while for the SO2
  
  176   Mon Nov 2 09:32:40 2009 Damien Gallop  MCIS on with 33S5+ on FC6 over the weekendBeam came up nicely on  Friday, and
stayed up quuietly over the weekend. Note
the absence of periodic spikes in the separator
 Picture_1.pngPicture_2.pngPicture_3.pngPicture_4.png 
  175   Fri Oct 30 09:44:49 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnightControls finished with IOSIOC work yesterday.
ICR had restored most optics. I restarted
the source last evening. As you can see below,
 Picture_2.pngPicture_1.pngPicture_2.pngPicture_3.png 
  174   Thu Oct 29 09:42:23 2009 Damien Gallop  IOSIOC work in progressYesterday there was an IOSIOC reboot for
a purpose. It was an opportunity to demonstrate
to Controls that IOSIOC reboots materially
  
  173   Wed Oct 28 09:55:28 2009 Damien Gallop  Planned IOSIOC rebootControls is rebooting IOSIOC. I have inserted
MCIS:FC1 for the duration. Let's see what
comes of it all.
 Picture_1.pngPicture_2.png 
  172   Wed Oct 28 09:33:51 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnight cont'dBeam was quiet overnight. I noticed a slow
drift that seemed to follow the source pressure.
My best guess is that our source gas "regulator"
 Picture_1.png 
  171   Tue Oct 27 09:22:14 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnightI had optimized the RF yesterday, but the
source went into a dual-mode toggling regime.
It is hairline to find a nice point. I also
 Picture_7.pngPicture_8.pngPicture_3.pngPicture_4.png 
  170   Mon Oct 26 10:56:52 2009 Damien Gallop  MCIS on with 33S5+ on FC6 over the weekendOn Friday we left 33S5+ on FC6. The separator
magnet power supply tripped at some point
for unknown reason. The operators turned
 Picture_4.png 
  169   Fri Oct 23 09:55:41 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnight cont'dBeam stayed on quietly overnight, as did
the separator stability program. Periodic
pulsing continues to occur. No explanation
 Picture_2.pngPicture_3.png 
  168   Thu Oct 22 15:54:24 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnight cont'dThe Supernanogan was on overnight quietly.
FC6 went in this morning. (Didn't check if
fingers were involved.) I  now notice
 pulse.pngpulse-clip.pngpulse-tweak.png 
  167   Wed Oct 21 11:01:37 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnight cont'dI alsmost want to write, see yesterday's
entry! Source ran quietly with no interruptions.
FTR, the separator stability program is also
  
  166   Tue Oct 20 09:25:29 2009 Damien Gallop  MCIS on with 33S5+ on FC6 overnightThe source stayed up quietly overnight
with about 4enA on FC6. Once in a while a
little burp occurs, visible as small beam
  
  165   Mon Oct 19 10:09:13 2009 Damien Gallop  MCIS on with 33S5+ on FC6Switch on source for stats. Source lit
up perfectly. Slight adjustment on RF frequency.
 Picture_5.png 
  164   Thu Oct 15 21:06:10 2009 Keerthi  OLIS status33S development is completed.  A 3nA
of 33S+5 can be produced with 10W of RF power
and 2.5mm aperture.
  
  163   Thu Oct 15 09:43:00 2009 Damien Gallop  MCIS development with 33S5+Source started. 33S5+ beam on FC6 using
gas flow determined yesterday. At first blush,
it appears we need a slightly higher flow.
 Picture_3.png 
  162   Wed Oct 14 12:06:46 2009 Damien Gallop  MCIS development with 33S5+MCIS was running with background only.
Prepare to open SO2 source gas...
MCIS:IG1 = 5.4e-8 Torr
 grab.w30542.png 
  161   Wed Oct 14 09:52:09 2009 Damien Gallop  MCIS development with 33S5+ todayThe source is on. There is background beam
on FC6 presently, less than yesterday. That's
probably a good thing. Let it cook for a
 Picture_6.png 
  160   Tue Oct 13 14:14:17 2009 Damien Gallop  MCIS setup for 33S5+Keerthi has reinstalled the SO2 source
gas bottle onto MCIS. Presently it is closed
off to the source. We have restarted the
 Picture_2.pngPicture_3.pngPicture_4.pngPicture_5.png 
  159   Sun Oct 11 17:11:31 2009 Keerthi  MCIS turbo pumps power levelsMCIS:TP1 = 12W
MCIS:TP2 = 11W
  
  158   Sun Oct 11 17:09:52 2009 Keerthi  Vacuum with IOS:IV7IOS:IG4 reads 1.25 e-7 Torr and IOS:IG1
reads 9.8e-8 Torr with IOS:IV7 is open
IOS:IG4 reads 8.35 e-8 Torr and IOS:IG1
  
  157   Sun Oct 11 13:17:37 2009 Keerthi  Neon Leak closedNeon leak close for upcoming 33S development.   
  156   Sun Oct 11 13:16:39 2009 Keerthi  MCIS:TP3 was offMCIS TP3 foumd off by 1:00 pm.  Restarted
without a problem
Before TP3 is on MCIS:IG1 is 5.47e-8
  
  155   Fri Oct 9 16:33:45 2009 Keerthi  33S developmentSO2 gas line is connected
again. Leak hand valve is closed.
  
  154   Thu Oct 8 09:39:52 2009 Damien Gallop  CSB Development with MCISFriedhelm and Marco have requested 20Ne2+
from the Supernanogan, and plan to bring
up the same from the CSB today. I am beginning
 MCIS_HV_Conditioning.png 
  153   Wed Oct 7 16:54:33 2009 Keerthi   Today Supernanogan vacuum found to be down in
the morning. Restarted easily.
  
  152   Tue Oct 6 15:28:31 2009 Keerthi  OLIS A/Q changed to 5 (20Ne+4)Changed OLIS A/Q to 5 (20Ne+4) to satisfy
the CSB and ISAC development changes. 8nA
is sitting at the FC6
  
  151   Tue Oct 6 15:22:43 2009 Damien Gallop  22Ne4+ & 20Ne4+ operationOver the weekend, Keerthi had set up 22Ne4+
to FC6 for the purpose of developing a tune
matched with a similar tune from the CSB.
 20Ne4_on_FC6.png 
  150   Sun Oct 4 19:16:46 2009 Keerthi  OLIS statusSupernanogan is ready with 22Ne+4 for upcoming
CSB run. EL, HV and RF are on. The anlyzing magnet
and the other optics are set for A/Q=5.5.
  
  149   Fri Oct 2 15:58:36 2009 Keerthi  17O and Ne gases are now connectedA  1e-5 atm.cc/sec of 17O leak and
a 1e-6 atm.cc/sec of neon leak are connected
to the source through center tube of the
  
  148   Fri Oct 2 09:38:26 2009 KeerthiRoutineGeneral33Sulfur development completed successfully. 
Sulfur-33
development completed successfully.
  
  147   Wed Sep 30 15:30:04 2009 Damien Gallop  33S6+ from MCIS for DRAGON setupBeam is stable enough to let Marco set
up something to DRAGON. We are a couple of
days early.
 grab.sA3956.pnggrab.ar3960.png 
  146   Mon Sep 28 14:16:47 2009 Damien Gallop  MCIS Cart down for TP1 ReplacementWe are taking the opportunity to replace
TP1 today. Edi Dalla Valle is on it. Also,
Diagnostics has a WP in the queue for looking
  
  145   Mon Sep 28 14:12:17 2009 Damien Gallop  33S5+ from MCIS on Friday 25-Sep-2009A sustained 33S5+ beam was generated in
the Supernanogan on Friday, September 25th.
Attached is a trar plot.
 33S_from_MCIS_25-Sep-2009.png 
  144   Wed Sep 16 18:14:29 2009 Damien Gallop  Test scans for publication 2090916_1206ILTEMIT.txt
Graphics with "color" in
the filename will look in print the same
 19x 
  143   Wed Sep 16 12:48:13 2009 Keerthi  17O+5 double peaks090916_1242ILTEMIT.txt  17O+5 has
two peaks.
090916_1355ILTEMIT.txt  Repeat
 grab.U24653.pnggrab.s24670.pnggrab.s24675.pnggrab.d24681.pnggrab.u24686.png 
  142   Wed Sep 16 12:26:51 2009 KeerthiRoutineGeneral17O+3 emittance with changed steering090916_1222ILTEMIT.txt  Changed the
MCIS steering to center the beam in the EL.
17O+3 ~5uA, 50x100
  
  141   Wed Sep 16 12:20:10 2009 Keerthi  17O+3 emittance with increased EL090916_1215ILTEMIT.txt   
EL increased, ~4.5uA, emittance increases,
50x100   17O+3
  
  140   Wed Sep 16 12:12:04 2009 KeerthiRoutineGeneral17O+3 emittance sacns090916_1156ILTEMIT.txt     
17O+3  good settings 50x100 ,  
333nA Scale, ~4uA
  
  139   Tue Sep 15 20:02:46 2009 Keerthi  17O8+ on FC6 from MCIS0.4nA of 17O+8 is sitting on FC6. Development
will continue tomorrow.
 grab.I24583.png 
  138   Tue Sep 15 19:46:21 2009 KeerthiRoutineGeneralSupernanogan emittance scans090915_1915ILTEMIT.txt = 17O +3,  4.4uA
new tune, scanner offset +10V,  scanner
scale 100nA , 100x50 matrix
 9x 
  137   Tue Sep 15 16:56:03 2009 Damien Gallop  Test scans for publicationHere are pix of the same scan: original,
then greyscale, then cropped, using The GIMP.
Not bad.
 grab.E19994.pnggrab.U19879-greyscale.pnggrab.U19879-cropped.png 
  136   Tue Sep 15 16:09:31 2009 Damien Gallop  MCIS Development 17O emittance scansWe noticed a double peak effect in the
16O3+ scan. I will set up the line for 17O3+
and see.
 13x 
  135   Tue Sep 15 10:32:39 2009 Damien Gallop  MCIS DevelopmentSo. We are preparing for a few days of
Supernanogan development. The present run
plan is to obtain good emittance scans for
 7x 
  134   Tue Sep 15 09:54:22 2009 Damien Gallop  16O3+ run to DRAGON ended on schedule at 08:00The DRAGON run ended uneventfully. (That's
a good thing.) I ran a few emittance scans
on the beam as-is. It is clearly monoisotopic.
 8x 
  133   Fri Sep 11 23:42:45 2009 KeerthiOtherGeneralMCIS turbo pumpMCIS TP1 is not running well. Needs investigation
as soon as S1219 is completed.
Later... TP1 failed completely, and
 mcis_multi-state.png 
  132   Tue Sep 8 15:14:45 2009 Damien Gallop  Back from vacationI'm back from vacation. Physically, anyway.
Keerthi did comprehensive emittance scans
during Supernanogan Development over the
 magstab_off-on.pngmagstab_on_10-sep-2009.pngmagstab_on_14-sep-2009.png 
  131   Tue Aug 18 11:16:16 2009 Damien Gallop  MCIS "PV" PLC trip overnightAnother in the on-going saga of MCIS:PV1
trips occurred again this morning. The operators
recovered most of the vacuum devices except
 grab.SXu928.pnggrab.eG1166.pnggrab.di1170.png 
  130   Mon Aug 17 15:53:54 2009 Damien Gallop  MCIS mass scans & initial emittance scansHigh resolution zero to 25. Save file:
masscorr_mcis_090817-highres.txt
Ack! Elog server went down at ~17:00!!!
 11x 
  129   Mon Aug 17 13:58:35 2009 Damien Gallop  Supernanogan Development begins today for one weekSupernanogan Development begins. It will
be a marathon. Main goals are high-charge
emittance scans and RF frequency scans. Tall
 Picture_43.pnggrab.a30699.png 
  128   Fri Aug 14 13:53:34 2009 Damien Gallop  MWS 25Mg end of run dataMarco gave us the all-clear this morning
to shut down the MWS. We are preparing to
remove the MWS head from the Y-box and blank
 10x 
  127   Tue Aug 11 09:54:28 2009 Damien Gallop  MWS 25Mg operation overnight & MCIS cart installationAs noted earlier, the MWS beam dropped
out at some point after yesterday afternoon's
playtime, due to insufficient PE. Plasma
 grab.Z26532.pnggrab.Y26538.png 
  126   Mon Aug 10 18:29:32 2009 Damien Gallop  MWS source trip & restartWell, so it goes. As I was penning a note
for OPS, the source tripped. It easily reignited
with a little extra Ne. I left the flow slightly
 grab.q23803.png 
  125   Mon Aug 10 18:06:09 2009 Damien Gallop  MWS 25Mg reduce intensity with PESo... we have had this on-going problem
with intense Mg beam coating our optics.
Keerthi found a good recipe last week with
 grab.W23753.png 
  124   Mon Aug 10 17:42:18 2009 Damien Gallop  MWS 25Mg emittance scan with original settingsFinally, here is the "original"
beam. Can you tell the difference (side-by-side
at bottom)? I can't.
 6x 
  123   Mon Aug 10 17:20:55 2009 Damien Gallop  MWS 25Mg emittance scan with zeroed vertical steerersHere is a variation I thought might be
appropriate.
Data file: 090810_1724ILTEMIT.txt
 grab.k23573.pnggrab.m23577.pnggrab.v23582.pnggrab.U23599.png 
  122   Mon Aug 10 17:16:20 2009 Damien Gallop  MWS 25Mg emittance scan with downstream quads offHere is the emittance scan that Rick requested,
beam with Q4/5/6 off. Note that present numbers
for these quads do not match theoretical.
 grab.E23496.pnggrab.o23517.pnggrab.J23522.pnggrab.Q23526.png 
  121   Mon Aug 10 16:43:59 2009 Damien Gallop  MWS 25Mg emittance scan with slits openBefore proceeding, I nudged in each of
the slits, watching for first clipping. With
the current emittance (nice), the beam cleared
 grab.G23396.pnggrab.g23400.pnggrab.r23404.png 
  120   Mon Aug 10 16:36:33 2009 Damien Gallop  MWS 25Mg emittance scansA series of 25Mg emittance scans for Rick.
Starting scan with everything as-is,
i.e. slits closed.
 grab.d23286.pnggrab.w23291.pnggrab.U23295.pnggrab.U23312.pnggrab.q23316.png 
  119   Mon Aug 10 16:12:28 2009 Damien Gallop  MWS 25Mg operation over the weekendSummary: good.
Details: A trip occurred at some
point. I restarted the source over the weekende
 grab.m23211.pnggrab.F23215.png 
  118   Fri Aug 7 14:42:29 2009 Damien Gallop  MWS 25Mg beam reductionAround noon, Keerthi adjusted the PE down
to reduce the intensity of the Mg beam, as
we are running with attenuators in. He ended
 grab.jpa367.pnggrab.zFr371.pnggrab.PTd375.pnggrab.DYQ403.png 
  117   Fri Aug 7 10:16:38 2009 Damien Gallop  MWS 25Mg emittance scansWhile there is an SC cavity issue, I have
been repeating last evening's emittance scans.
Here is the best one. About 70nA of 25Mg
 6x 
  116   Thu Aug 6 17:02:00 2009 Damien Gallop  MWS 25Mg tuning to TIGRESS in progressTuning has been on-going through the day.
Here are a couple of emittance scans taken
in-between heartbeats. The first is zoomed
 7x 
  115   Wed Aug 5 11:29:51 2009 Damien Gallop  MWS operation overnight and 25Mg statusSo... there evidently was a power bump
overnight, because the stability power supply
was "disconnected" from the system.
 grab.G24908.pnggrab.h24912.pnggrab.T24916.pnggrab.W24925.pnggrab.x24953.png 
  114   Tue Aug 4 11:13:04 2009 Damien Gallop  MWS source tuning for 25Mg operationThe source stayed up overnight just fine,
with a little 25Mg beam on FC6. This morning
I did a few mass scans to get a fix on Mg
 6x 
  113   Mon Aug 3 08:39:31 2009 Damien Gallop  MWS 21Ne -> 25Mg switchoverConveniently scheduled for BC Day, we are
preparing to switch over the MWS to sputter
operation with MG source material. Operations
 grab.f18355.pnggrab.n18345.png 
  112   Mon Jul 27 14:39:22 2009 Damien Gallop  21Ne5+ to TUDA-II21Ne has been available from the MWS since
mid-week. Here is roughly how last week unfolded
to now:
  
  111   Wed Jul 22 14:31:28 2009 Damien Gallop  21Ne setup to TUDA-II is underwayLast night Keerthi resolved the sparking
issue in MWS and started the source while
I was present. There was a frozen interlock
 Picture_27.pngPicture_24.png 
  110   Wed Jul 22 01:33:29 2009 Damien Gallop  MWS initial startup summaryVacuum came down to ~7e-7 Torr. On startup,
bias sparked over somewhere. Vacuum leak
was caused. Later we found that HV had sparked
  
  109   Tue Jul 21 17:11:33 2009 Damien Gallop  MWS preparations for 21Ne operationWith the MCIS cart removed, Geoff hooked
up the leak detector to the MWS source gas
line. He did a couple of hours of leak checking
 Picture_23.png 
  108   Mon Jul 20 17:28:01 2009 Damien Gallop  MCIS cart removed from cage and parkedWe discussed whether or not to leave the
Supernanogan in the OLIS Faraday cage, and
decided no, because the up-coming runs will
  
  107   Mon Jul 20 09:25:35 2009 Damien Gallop  18O4+ run to TIGRESS completeThe 18O4+ run at about 5MeV/u ended this
morning with reasonable success, I'm informed,
despite MCIS vacuum trips, SC cryo trips
 grab.rt5424.pnggrab.kH5418.pngPicture_25.pngPicture_24.pngPicture_23.png 
  106   Fri Jul 17 11:10:21 2009 Damien Gallop  Supernanogan development doneBeam switched back to 18O4+ by 11:00 as
agreed. Some glitches. Here are snapshots
of how it looked at handover time.
 6x 
  105   Fri Jul 17 10:46:06 2009 Damien Gallop  16O6+ recheckA/q = 2.666 Field = 767.1G FC6 = 3enA  grab.C25591.pnggrab.q25595.pnggrab.Q25796.pnggrab.w25831.pnggrab.c25693.png 
  104   Fri Jul 17 10:32:42 2009 Damien Gallop  16O8+ recheckA/q = 2 Field = 667.3 FC6 = ~10enA  grab.X25481.png 
  103   Fri Jul 17 10:30:27 2009 Damien Gallop  16O7+ recheckA/q = 2.2857 Field = 710.5G FC6 = 100pA   
  102   Fri Jul 17 10:28:09 2009 Damien Gallop  18O7+ recheckA/q = 2.571 Field = 753.5 FC6 = 50epA   
  101   Fri Jul 17 10:03:07 2009 Damien Gallop  18O6+ recheckA/q = 3 Field = 813.9G FC6 = 2.2enA
I tweaked the adjustment of the displayed
A/q calibration to fit this one.
 grab.a25266.pnggrab.J25270.pnggrab.C25275.png 
  100   Fri Jul 17 09:47:16 2009 Damien Gallop  18O8+ recheckGo fishing in the range 2.24-2.26, but
no fish in this pond this time. However,
there is a relatively strong beam at 2.3.
  
  99   Fri Jul 17 09:33:09 2009 Damien Gallop  Supernanogan epilogueThere are the last couple of hours of Supernanogan
Development for this set. Our run plan included
17On+ studies. Time will not permit it this
 grab.a24906.pnggrab.Q24916.png 
  98   Thu Jul 16 17:15:50 2009 Damien Gallop  16/18On+ survey summaryHere is a summary of emittances gleaned
from the aforementioned elog entries.
  
  97   Thu Jul 16 17:09:52 2009 Damien Gallop  18O1+ surveyA/q = 18 Field = 1987.1 FC6 = 161nA  grab.b17471.pnggrab.r17475.pnggrab.R17480.png 
  96   Thu Jul 16 17:05:29 2009 Damien Gallop  16O1+ surveyA/q = 16 Field = 1873.4G FC6 = 204enA  grab.o17385.pnggrab.G17390.pnggrab.B17394.png 
  95   Thu Jul 16 16:50:41 2009 Damien Gallop  18O2+ surveyA/q = 9 Field = 1405.0G FC6 = 55enA  grab.N17330.pnggrab.Y17335.pnggrab.w17339.png 
  94   Thu Jul 16 16:40:11 2009 Damien Gallop  16O2+ surveyA/q = 8 Field = 1324.8G FC6 = 172enA  grab.u17187.pnggrab.U17191.pnggrab.s17196.png 
  93   Thu Jul 16 16:33:28 2009 Damien Gallop  18O3+ surveyA/q = 6 Field = 1147.2 FC6 = 39.3enA  grab.k17100.pnggrab.e17104.pnggrab.E17109.png 
  92   Thu Jul 16 16:15:39 2009 Damien Gallop  16O3+ surveyA/q = 5.3333 Field = 1081.6G FC6 = 110nA  grab.F17014.pnggrab.D17019.pnggrab.E17026.png 
  91   Thu Jul 16 15:58:53 2009 Damien Gallop  18O4+ surveyA/q = 4.5 Field = 993.5G FC6 = 20enA  grab.Q16857.pnggrab.l16862.pnggrab.r16890.png 
  90   Thu Jul 16 15:49:46 2009 Damien Gallop  16O4+ surveyA/q = 4 Field = 936.7 FC6 = 54.0enA  grab.W16723.pnggrab.F16727.pnggrab.l16731.png 
  89   Thu Jul 16 15:41:35 2009 Damien Gallop  18O5+ surveyA/q = 3.6 Field = 888.6G FC6 = 6.2enA  grab.d16597.pnggrab.v16602.pnggrab.z16609.png 
  88   Thu Jul 16 15:38:58 2009 Damien Gallop  16O5+ surveyA/q = 3.2 Field = 837.7G FC6 = 14.5enA  grab.a16526.pnggrab.l16532.pnggrab.N16536.png 
  87   Thu Jul 16 15:22:51 2009 Damien Gallop  18O6+ surveyA/q = 3 Field = 811.2G FC6 = 1.6nA
Not quite enough beam for an emittance
scan.
 grab.Z16300.png 
  86   Thu Jul 16 15:11:16 2009 Damien Gallop  16O6+ surveyA/q = 2.6667 Field = 764.7G FC6 = 3.0nA  grab.e16164.pnggrab.z16169.pnggrab.a16173.png 
  85   Thu Jul 16 14:50:38 2009 Damien Gallop  18O7+ surveyA/q = 2.5714 Field = 751.1G FC6 = 40epA
No emittance scan possible.
  
  84   Thu Jul 16 14:46:52 2009 Damien Gallop  16O7+ surveyA/q = 2.2857 Field = 708.0G FC6 = 70epA
(noisy)
No emittance scan possible.
  
  83   Thu Jul 16 14:44:06 2009 Damien Gallop  18O8+ surveyA/q = 2.25 Field = 702.5G FC6 = not visible
It looks like last night's vacuum
trip is biting us here.
  
  82   Thu Jul 16 14:41:46 2009 Damien Gallop  16O8+ surveyA/q = 2 Field = 662.3G FC6 = 150epA (unstable)
No emittance scan possible.
  
  81   Thu Jul 16 14:25:27 2009 Damien Gallop  18O4+ surveyA/q = 4.5 Field = 993.5G FC6 = 24.0enA  grab.x15815.pnggrab.p15822.pnggrab.x15826.png 
  80   Thu Jul 16 14:11:43 2009 Damien Gallop  MCOL3 slits calibrationsI ran through a calibration exercise for
the IOS slits. Here is my data. I have moved
each set to the midpoint of the largest (5mm)
 grab.k15763.pnggrab.h15767.pnggrab.J15771.png 
  79   Thu Jul 16 14:06:56 2009 Damien Gallop  MCIS vacuum trip overnightThe MCIS vacuum system tripped last night
again. Fortunately the operators
noticed it and restarted stuff. Otherwise
 grab.X15685.png 
  78   Wed Jul 15 16:37:01 2009 Damien Gallop  Bias for IOS emittance rigGraham looked up the list of IOS bias assignments.
None was form the emittance rig. I quickly
tested the list in ILT, but nothing jumped
 grab.wu7505.pnggrab.Vo7510.pnggrab.le7613.pnggrab.TN7617.png 
  77   Wed Jul 15 14:41:25 2009 Damien Gallop  18O5+ surveyA/q = 3.6 Field = 888.6G FC6 = 10nA
Two emittance scans, one with the
as-is emittance rig, one with a manually
 grab.Nr6887.pnggrab.ag6892.pnggrab.sV7547.pnggrab.Sg7555.png 
  76   Wed Jul 15 10:52:25 2009 Damien Gallop  18O6+ surveyA/q = 3 Field = 813.2 FC6 = 2.9nA
Beam is too faint for a good emittance
scan, but it's visible. Redo with reverse
 7x 
  75   Wed Jul 15 10:51:25 2009 Damien Gallop  18O7+ surveyA/q = 2.571 Field = 752.9 FC6 = 88pA   
  74   Wed Jul 15 10:41:23 2009 Damien Gallop  18O8+ surveyA/q = 2.25 Field = 704.7G FC6 = <pA
Well, it's there, but pretty faint.
The attached stripchart shows no beam then
 grab.dg7993.png 
  73   Wed Jul 15 10:27:18 2009 Damien Gallop  18O4+ overnight and emittance checkRepeat emittance scan of present 18O4+
beam. It compares okay (somewhat broader
emittance numbers)  with yesterday's
 grab.tL7839.pnggrab.An7844.pnggrab.fH7848.pnggrab.Jq7854.png 
  72   Wed Jul 15 09:20:26 2009 Damien Gallop  Supernanogan development in progressProposed run plan for this time:

    Document TIGRESS tune.

   18O4+ emittance scan.
    Mass
  
  71   Tue Jul 14 15:19:51 2009 Damien Gallop  MCIS mass scanI have begun a mass scan from 0 to 25.
It will be a while. Data file: masscorr_mcis__0-25_090714.txt.
25nA of 18O4+ restored to FC6.
 grab.qQ4911.png 
  70   Tue Jul 14 09:47:14 2009 Damien Gallop  18O4+ tuning to TIGRESS this morningWe have a change of schedule. Due to circumstances,
Sophia will continue tuning to TIGRESS this
morning. Sgan Development will resume this
 7x 
  69   Mon Jul 13 17:41:04 2009 Damien Gallop  Supernanogan development Monday morningAs noted, Keerthi was called to restart
the source after a power bump. He continued
Supernanogan development through the night
 Picture_20.png 
  68   Mon Jul 13 17:19:29 2009 Damien Gallop  MCIS vacuum trip at ~15:30An MCIS vacuum trip occurred somewhere
around 15:30. Sophia observed a drop-off
in beam. The cause looks like the PLC-related
 grab.Z26697.png 
  67   Mon Jul 13 09:49:52 2009 Damien Gallop  18O4+ tuning to TIGRESS todayAs per our agreed deal last week, today
is reserved for Supernanogan tuning to TIGRESS.
Development will resume tomorrow.
 Picture_19.png 
  66   Fri Jul 10 11:47:07 2009 Damien GallopRoutineGeneral18On+ frequency scans & resonancesThe Supernanogan was restarted this morning,
after last night's power bump. 18O4+ on FC6,
cooking for about an hour. Looks very good.
 Picture_18.png 
  65   Fri Jul 10 11:46:55 2009 Damien GallopRoutineGeneral18On+ frequency scans & resonancesThe Supernanogan was restarted this morning,
after last night's power bump. 18O4+ on FC6,
cooking for about an hour. Looks very good.
 Picture_18.png 
  64   Fri Jul 10 09:55:25 2009 Damien GallopRoutineGeneral18O8+ beam overnightHere is a striptool of 18O8+ beam (magenta
trace) last evening from about 18:00 to 22:30
when there was a large power bump coincident
 grab.N10241.png 
  63   Thu Jul 9 16:07:56 2009 Damien GallopRoutineGeneral18O8+ frequency scansKeerthi did some 18On+ frequency scans
this morning. He observed 18O8+! I am attempting
to repeat it myself now. Reverse bias on
 6x 
  62   Wed Jul 8 19:51:33 2009 Damien GallopRoutineGeneral18On+ summary for the dayThe 18O source gas bottle is online. The
ion source was optimized for 18O4+ and kept
the same throughout. Emittance scans of each
 grab.TF3397.pnggrab.fu3402.pnggrab.Tk3406.png 
  61   Wed Jul 8 19:13:15 2009 Damien GallopRoutineGeneral18O8+ emittance scanA/q = 2.25 FC6 at reverse bias MB = 736.9G
@ 42.9A
Not enough intensity for an emittance
 grab.Ah3293.pnggrab.ed3302.pnggrab.Nc3298.png 
  60   Wed Jul 8 19:07:15 2009 Damien GallopRoutineGeneral18O7+ emittance scanA/q = 2.57 FC6 = 0.25nA MB = 790.0G @ 46.2A
Not enough intensity for an emittance
scan.
 grab.ca3306.png 
  59   Wed Jul 8 18:57:09 2009 Damien GallopRoutineGeneral18O6+ emittance scanA/q = 3 FC6 = 5.5nA MB = 851.5G @ 50.1A  grab.cb3228.pnggrab.un3232.png 
  58   Wed Jul 8 18:47:43 2009 Damien GallopRoutineGeneral18O5+ emittance scanA/q = 3.6 FC6 = 12.5nA MB = 931.8G @ 55.3A  grab.IW3188.pnggrab.kW3192.png 
  57   Wed Jul 8 18:38:21 2009 Damien GallopRoutineGeneral18O4+ emittance scanA/q = 4.5 FC6 = 29.5nA MB = 1041.8G @ 62.4A  grab.Cb3157.pnggrab.wO3161.png 
  56   Wed Jul 8 18:20:43 2009 Damien GallopRoutineGeneral18O3+ emittance scanA/q = 6 FC6 = 49.5nA MB = 1201.4G @ 73.1A  grab.Pc3095.pnggrab.Oi3099.png 
  55   Wed Jul 8 18:12:25 2009 Damien GallopRoutineGeneral18O2+ emittance scanA/q = 9 FC6 = 50.0nA MB = 1470.8G @ 90.8A  grab.LL3034.pnggrab.Yj3038.png 
  54   Wed Jul 8 17:58:02 2009 Damien GallopRoutineGeneral18O1+ emittance scanHere we go. A/q = 18 FC6 = 141.0nA MB =
2078G @ 130.2A
 grab.QR2996.pnggrab.dm3000.png 
  53   Wed Jul 8 17:47:26 2009 Damien GallopRoutineGeneral18O4+ emittance scansFirst up is a check scan of 18O4+. There
is a definite vertical offset compared to
earlier today. Otherwise, it correlates well
 grab.Jj2874.pnggrab.fz2878.pnggrab.ND2931.pnggrab.pH2935.pnggrab.oY2939.png 
  52   Wed Jul 8 16:12:51 2009 Damien GallopRoutineGeneralMass scan in progressA mass scan from A/q of zero to 25 is in
progress. Data file (large): masscorr_mcis_090708.txt.
The source is optimized for 18O4+. Fishing
 grab.rh2790.pngPicture_16.pngPicture_17.png 
  51   Wed Jul 8 11:52:54 2009 Damien GallopRoutineGeneralSupernanogan development run plan for the remainder of this set* 18On+ emittance scans at present ion
source settings: complete today.
* 18On+ frequency measurements: Thursday.
  
  50   Wed Jul 8 10:57:46 2009 Damien GallopRoutineGeneral18O4+ emittance scansTune saved as 090708_1200.snapmcisfc6.
I settled on the 15.486GHz optimal frequency,
and tweaked that for effect. Then I ran a
 10x 
  49   Wed Jul 8 09:34:58 2009 Damien GallopRoutineGeneral18O4+ frequency optimizationStarting frequency: 15.7864GHz => 870pA
on FC6  Step size: 1MHz. Selected peaks
shown. There were many smaller resonances
  
  48   Wed Jul 8 09:22:07 2009 Damien GallopRoutineGeneral18O4+ beam growth overnightAfter accessing the OLIS cage and opening
the 18O source gas valve, I restarted the
Supernanogan source last evening around 18:00
 grab.hD1461.png 
  47   Tue Jul 7 17:47:14 2009 Damien GallopRoutineGeneral18On+ beam & emittanceAs noted earlier, we have 17O and 18O source
gas attached to the Supernanogan source chamber.
Both are valved off presently. The source
  
  46   Tue Jul 7 15:43:19 2009 Damien GallopRoutineGeneralISIS emittance rig tests this morningKeerthi and I were front and centre doing
ISIS emittance rig testing this morning.
He ran it, and I tried to find ways to run
 Picture_11.pngPicture_12.png 
  45   Mon Jul 6 17:34:24 2009 Damien GallopRoutineGeneral18O background studiesWell... my browser blew away just before
I submitted version one of this entry. Let's
try again.
 6x 
  44   Mon Jul 6 10:57:08 2009 Damien GallopRoutineGeneralBeam stability versus temperature over weekendWe had 16O3+ on FC6 on Friday. An IOSIOC
reboot occurred mid-afternoon Friday unfortunately.
Operators restored beam at about 06:00 on
 Picture_4.png 
  43   Fri Jul 3 10:29:15 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16O cont'd.16O2+ beam on FC6 = 10nA as before. Move
to 16O3+ A/q = 5.33...
A frequency scan between 13 &
 grab.Cr7150.pnggrab.yi7257.pnggrab.vt7264.pnggrab.vP7271.png 
  42   Fri Jul 3 10:03:11 2009 Damien GallopRoutineGeneralOvernight beam stability on FC3Here are some pics and data from total
MCIS beam on FC3 overnight. A bit inconclusive,
but there may be a temperature correlation.
 grab.lB3687.pnggrab.w13197.pngmcis_fc3_090703.datiosfc3_fc6_halltemp.txt 
  41   Thu Jul 2 16:55:04 2009 Damien GallopRoutineGeneralRF frequency scans versus each charge state of 16OLet's take a look at varying frequency
versus beam current for 16O2+. Starting RF
values shown below. FC6 = 1.09enA.
 7x 
  40   Thu Jul 2 11:58:18 2009 Damien GallopRoutineGeneralSupernanogan development in progressHappy Canada Day!
I noticed a long-term trend in beam
intensity. I have every reason to believe
 Picture_29.pnggrab.x14914.pnggrab.C15389.png 
  39   Tue Jun 30 17:39:13 2009 Damien GallopRoutineGeneralCompare 16O2+ beam from start of run to todayThere seemed to be some small change to
the beam over the week of TACTIC running.
I would like to poke around a bit. The emittance
 6x 
  38   Tue Jun 30 17:16:25 2009 Damien GallopRoutineGeneral16O2+ emittance scans with slits openFirst, with upstream slits opened, then
with both open. Original slit setting was
1mm. Finally, restore slits to 1mm and see
 6x 
  37   Tue Jun 30 10:56:26 2009 Damien GallopRoutineGeneral16O2+ emittance scansThe first emittance scan sort of got interrupted;
it auto-restarted just before the previous
scan had finished. I thought the resulting
 6x 
  36   Tue Jun 30 10:30:17 2009 Damien GallopRoutineGeneralInitial development setupSetup teething pains... The Start button
on the emittance panel worked this time.
But ICR called, requesting a few minutes
  
  35   Tue Jun 30 09:33:00 2009 Damien GallopRoutineGeneralSupernanogan Development begins today for two weeksSupernanogan development starts today.
The TACTIC run, which ended around 08:30
today, appears to have been a success. TACTIC
  
  34   Mon Jun 29 10:35:35 2009 Damien GallopRoutineGeneral16O2+ pilot beam to TACTIC in progressWe handed over a 16O2+ beam on Wednesday
morning to Sophia for TACTIC setup. On our
side, everything went well. TACTIC switched
 Picture_23_09-22-33.pngPicture_23.pngPicture_24.png 
  33   Wed Jun 24 10:27:23 2009 Damien GallopRoutineGeneral16O2+ tune ready for Sophia and MarcoSee ISAC elog entry today. 
Keerthi developed a dual-mode tune last night,
so that we can run the MWS at will if so
 Picture_22.pngPicture_23.pnggrab.s21695.pnggrab.H11995.png 
  32   Tue Jun 23 18:04:30 2009 Damien GallopRoutineGeneralMCIS HV conditioning to 20KVSupernanogan bias for this run is 16.32KV.
After we were finished with source tuning,
etc., we conditioned up to 20KV. Then beam
 grab.Vd9281.png 
  31   Tue Jun 23 16:48:00 2009 Damien GallopRoutineGeneral16O2+ on FC6 after source tuningAfter a first round of source and line
tuning for good current with minimum RF power,
we have about 8nA of 16O2+ on FC6. Here is
 grab.IW8732.pnggrab.wS8740.pnggrab.mb8690.pnggrab.ON8795.png 
  30   Tue Jun 23 15:02:38 2009 Damien GallopRoutineGeneral16O2+ on FC6We now have about 80nA of 16O2+, using
the same source parameters as before. Keep
a watch for a while, then tune the source
 grab.wE8003.pnggrab.YK8019.pnggrab.HH8254.pnggrab.WH8272.pnggrab.ly8245.png 
  29   Tue Jun 23 10:33:43 2009 Damien GallopRoutineGeneralEffects of RF on charge stateToday is the last day of this set of Supernanogan
Development. The source ran at 16KV overnight,
in anticipation of 16O2+ delivery later today.
 grab.aS7166.pnggrab.WZ7540.pnggrab.Ku7550.pnggrab.Pv7570.png 
  28   Mon Jun 22 20:28:37 2009 Damien GallopRoutineGeneralPreparations for 16O2+ deliveryIn anticipation of 16O2+ delivery mid-week,
we checked 16O2+ production from the Supernanogan
source. No problem. We did have to use the
 6x 
  27   Mon Jun 22 16:00:04 2009 Damien GallopRoutineGeneralEmittance thoughts and other mattersAn emittance scan of the 16O7+ beam follows.
Also, a stripchart of the same beam on FC6
overnight. Keerthi did some studies over
 7x 
  26   Fri Jun 19 20:15:19 2009 Damien GallopRoutineGeneralSummary of 16On+ emittance scansHere is a list of 16On+ emittance scans
for today. Although IOSIOC got rebooted,
restored tune was identical and trouble-free,
  
  25   Fri Jun 19 11:59:49 2009 Damien GallopRoutineGeneral16On+ emittance scans continueKeerthi developed a nice 16O7+ beam to
FC6 last night. Beam current is about 3nA
presently. Here is the first emittance scan
 18x 
  24   Thu Jun 18 09:38:52 2009 Damien GallopRoutineGeneralCheck Supernanogan beam after IOC reboot yesterdayAs mentioned before, IOSIOC was rebooted
yesterday afternoon to unfreeze the emittance
rig panel. It cost us our tune, which unfortunately
 15x 
  23   Wed Jun 17 17:01:07 2009 Damien GallopRoutineGeneral16On+ emittance scansA series of 16On+ emittance scans. Benchmark
scan of 16O5+ matched well with same scan
done this morning. Subsequent scans beginning
  
  22   Wed Jun 17 10:14:57 2009 Damien GallopRoutineGeneral16O5+ on FC6 overnightThe 16O5+ beam stayed up OK overnight.
ICR took some emittance
scans this morning. They look interesting.
 6x 
  21   Tue Jun 16 16:47:02 2009 Damien GallopRoutineGeneralMass scan around 16O5+Keerthi suggested using 16O5+ for optimizing
the source. I did a tight mass scan in that
area, and 16O5+ is clearly visible. I will
 grab.W16564.pnggrab.W24269.pnggrab.x24327.pnggrab.w24262.png 
  20   Tue Jun 16 12:10:17 2009 Damien GallopRoutineGeneral84Kr charge states begun


   
        
            
 grab.c14389.pnggrab.Q14911.pnggrab.T15712.pnggrab.F15724.png 
  19   Mon Jun 15 17:49:23 2009 Damien GallopRoutineGeneral84Kr charge states begunWe began looking at 84Kr this weekend.
Keerthi had 84Kr19+ on FC6 this morning,
which I was able to tweak up from ~300epA
  
  18   Fri Jun 12 14:24:49 2009 Damien GallopRoutineGeneral17O3+ beam at optimized RFA comment about RF power came up at the
presentation this morning. Intense X-rays
can be produced not only at the peak efficiency
 grab.Q22311.pnggrab.Z22325.pnggrab.F22387.png 
  17   Fri Jun 12 14:12:04 2009 Damien GallopRoutineGeneralOLIS & Supernanogan Facilities presentationPresentation this morning in Auditorium.
Players:
Keerthi: science
  
  16   Thu Jun 11 12:10:22 2009 Damien GallopRoutineGeneralSupernanogan statusPumping went well overnight. TP3 turned
on around noon. Issues with Kepco communications.
  
  15   Wed Jun 10 18:48:53 2009 Damien GallopRoutineGeneralKrypton source gas fittedKrypton source gas teed directly into ion
source. A Nupro valve and tee also added
for 17O line. At present, the 17O gas bottle
  
  14   Wed Jun 10 17:49:40 2009 Damien GallopRoutineGeneralBeam to RFQWe handed over the beam to Sophia for testing
Rick's new tune. Although there are RF issues
at the RFQ presently, her feedback to the
  
  13   Wed Jun 10 11:22:59 2009 Damien GallopRoutineGeneralSupernanogan development mass scansMain event this morning so far: mass scans
and post-scan analysis using Gabe's tools.
We have a pretty good recipe now. Tight scan
 grab.t27875.pnggrab.R27900.pnggrab.H27444.png 
  12   Tue Jun 9 20:49:32 2009 Damien GallopRoutineGeneralSupernanogan RF & IOS slitsI have been testing various RF power settings
for cold starts and beam stability. No surprise,
the best tuner setting is approximately midway
 grab.T18854.pnggrab.s18900.png 
  11   Tue Jun 9 16:53:55 2009 Damien GallopRoutineGeneralSupernanogan development in progressKeerthi started the Supernanogan source
today. His primary goal was to test out Rick's
theoretical tune calculations. He was ecstatic
  
  10   Mon Jun 8 09:31:39 2009 Damien GallopRoutineGeneralEmittance scan of 18O beam from MWSThe TIGRESS run ended this morning. Supernanogan
Development begins now for two weeks. Begin
an 18O1+ emittance scan and also take some
  
  9   Thu Jun 4 10:46:37 2009 Damien GallopRoutineGeneral18O source operation overnightThe MWS delivered 18O overnight, mostly
onto FC6. Sophia complained about source
stability this morning. It definitely could
  
  8   Wed Jun 3 16:17:51 2009 Damien GallopRoutineGeneralMWS started for 18O1+ production to TIGRESSA couple of weeks of 17O3+ to DRAGON ended
yesterday with a photo finish. Supernanogan
went off at 10:00. Preparations for 18O began.
  
  7   Fri May 22 15:03:55 2009 Damien GallopRoutineGeneralTemporary fix on IOS:TP7Vacuum Group applied a temporary fix to
the lower body seal on IOS:TP7, which we
found last night to be leaking. Edi tells
  
  6   Fri May 22 12:31:36 2009 Raymond Dubé  TestHello world   
  5   Fri May 22 10:50:06 2009 Damien GallopRoutineGeneralMCIS online with 17O3+ on FC6The previous 18O4+/8+ run to TUDA-II finished
midday yesterday. OLIS was prepared for 17O
delivery from the Supernanogan source. Leak
  
  4   Thu May 21 16:23:37 2009 Damien GallopRoutineGeneral18O4+/8+ to TUDA-II declared done around noonEnd of run diagnostics done. See ISAC elog.
Supernanogan cart is already installed and
at high vacuum. Prepare to run 17O from Sgan
  
  3   Fri May 15 14:12:45 2009 Geoff Wight  1st testtest   
  2   Thu May 14 12:02:09 2009 Damien GallopRoutineGeneralTesting 2My first OLIS elog entry.   
  1   Thu May 14 11:07:33 2009 Hossein Rafighi  TestTesting!   