|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
3
|
Tuesday, March 29, 2011, 14:14 |
John Wong | Ta#35 | HP-SIS | ITE | TM4 | 38481-3 | 38303-4 | Spent | ITE-TM4-Ta#35-Hp-SIS | ITE-TM4-Ta#35-Hp-SIS
Thu Apr 7 15:32:32 2011:
Target oven - w.o#38481-3. |
|
|
4
|
Thursday, March 31, 2011, 15:38 |
John Wong | SiC#25 | HP-SIS | ITE | TM4 | 38481-1 | 38307-? | Spent | ITE-TM4-SiC#25-Hp-SIS | Thu Mar 31 15:19:51 2011: SiC#25
was made sometime in December of 2010.
It is now in the target module and ready |
|
|
12
|
Wednesday, July 06, 2011, 14:32 |
John Wong | Ta#36 | LP-SIS | ITE | TM4 | 38634-2 | 38307-10 | Spent | Target ready, will go online on July 27 | Ta-LP-SIS (w.o#38634-2)
Target consists of 400 Ta foils,
4.4 cm in length. Total mass + Ta wire |
|
|
15
|
Friday, September 23, 2011, 17:03 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished | Friday, September 23, 2011, 16:54:
Cu-gaskets used for leak
checking target had a leak rate of about |
|
|
17
|
Monday, October 17, 2011, 14:45 |
John Wong | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Spent | Run finished |
|
|
|
20
|
Monday, February 20, 2012, 16:39 |
John Wong | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | | Spent | target ready for assembly | Monday, February 20, 2012, 16:25
Mass of empty target oven used =
461.55g |
|
|
21
|
Thursday, May 24, 2012, 11:04 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | 39069-2 | Spent | HP-SIS SiC27 target description | Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description:
Total SiC foils = 240 discs |
|
|
24
|
Wednesday, July 04, 2012, 11:32 |
Anders Mjos | UO2/Nb #1 | LP-FEBIAD | ITE | TM4 | 38481-9 | 39069-3 | Spent | target assembled |
|
|
|
26
|
Wednesday, August 01, 2012, 09:37 |
Pierre Bricault | ITE-TM4-UO#3 | LP-FEBIAD | ITE | TM4 | | | Problems/Solutions | Short has developed while lowering the cathode heater | On tuesday July we lower the cathode
heater to swap the anode-cathode bias. While
lowering the cathode heater a short on the |
|
|
27
|
Wednesday, August 29, 2012, 14:52 |
John Wong | UCx#5 | LP-SIS | ITW | TM4 | 39165-5 | | Failed | UCx#5 target description | Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing |
|
|
29
|
Thursday, October 11, 2012, 11:41 |
John Wong | NiO#1 | HP-FEBIAD | ITE | TM4 | 38481-7 | 39069-1/10(lid) | Spent | NiO target description | (Should have posted this before my long
vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38 |
|
|
30
|
Tuesday, December 11, 2012, 15:44 |
Anders Mjos | SiC | HP-FEBIAD | ITW | TM4 | na | na (old style fittings) | Ready | Test target for the Conditioning Station | The target has been used for operator
training previously at the ISAC Test Stand.
9-pin connector was completed |
|
|
31
|
Tuesday, March 19, 2013, 13:32 |
John Wong | SiC#28-RFQ | LP-SIS | | TM4 | LP-RFQ (NEW) | | Spent | SiC#28-RFQ target description | Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description:
Total SiC foils = 325 discs |
|
|
34
|
Wednesday, July 10, 2013, 18:41 |
John Wong | SiC#29 | HP-FEBIAD-CTL | ITE | TM4 | 38481-6 | 39956-4 | Spent | SiC#29 - Target description | Wednesday, July 10, 2013, 18:32
SiC#29 HP-FEBIAD-CTL target description:
Total SiC foils = 510 discs |
|
|
37
|
Friday, October 25, 2013, 17:35 |
John Wong | Ta#41 | HP-SIS | ITW | TM4 | 38817-10 | | Spent | Ta#41 target description | Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400 |
|
|
38
|
Wednesday, November 27, 2013, 17:56 |
John Wong | UCx#8 | LP-IG-LIS | ITE | TM4 | 39814-IV | | Spent | UCx#8 target description | Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1
|
|
|
39
|
Monday, March 17, 2014, 16:15 |
John Wong | Ta#42 | LP-SIS | ITW | TM4 | 40282-1 | 39956-1 | Spent | Ta#42 Target description | Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400 |
|
|
44
|
Tuesday, July 15, 2014, 11:01 |
Laura Lambert | UCx # 10 | LP-SIS | ITE | TM4 | 39165-10 | | Ready | UCx#10 Target Description | Tuesday, July 15, 2014, 10:58
See attachment for target description |
|
|
47
|
Thursday, September 25, 2014, 16:01 |
Laura Lambert | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Ready | Ta#44 target description | Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description: |
|
|
48
|
Thursday, November 06, 2014, 13:35 |
Laura Lambert | UCx # 11 | LP-SIS | ITE | TM4 | 40282-5 | | Ready | UCx#11 Target Description | Thursday, November 06, 2014, 13:29
See attachment for target description
|
|
|
55
|
Friday, July 10, 2015, 11:23 |
John Wong | UCx#13 | LP-IG-LIS | ITE | TM4 | 40860-1 | | Ready | UCx#13 Target description | Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target
description. |
|
|
61
|
Friday, March 11, 2016, 10:18 |
Laura Lambert | Ta # 47 | | ITE | TM4 | | | Spent | Ta # 47 target desscription | Friday, March 11, 2016, 10:13
Ta#47 LP-SIS [new small center |
|
|
71
|
Tuesday, March 07, 2017, 10:00 |
Laura Lambert | UCx#19 | LP-SIS | | TM4 | 42218-12 | | Ready | UCx#19 Target Description | Tuesday, March 07, 2017, 09:54
Attached please find |
|
|
73
|
Tuesday, May 16, 2017, 13:18 |
Laura Lambert | UCx#20 | LP-IG-LIS | ITE | TM4 | 42218-1 | | Ready | UCx#20 Target Description | Tuesday, May 16, 2017, 13:13
Attached please find |
|
|
75
|
Wednesday, May 31, 2017, 09:53 |
Laura Lambert | Ta# 52 | LP-SIS | | TM4 | 42218-14 | | In progress | Ta#52 target description | Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description: |
|
|
80
|
Wednesday, September 27, 2017, 09:14 |
Laura Lambert | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | | Ready | SiC#37 target description | Wednesday, September 27, 2017, 09:13
See attachment for target description.
|
|
|
87
|
Monday, October 15, 2018, 07:36 |
Aaron Schmidt | Ta#57 | | ITE | TM4 | 41177-3 | | | Ta#57 Target Description. | (Laura Lambert: Evap 2 Elog ID: 404) Tuesday,
April 17, 2018, 10:20 |
|
|
102
|
Tuesday, October 06, 2020, 14:25 |
Aaron Schmidt | Ta#61 | LP-SIS | ITE | TM4 | 44508-1 | | In progress | Ta#61 Target Description | Ta#61 LP-SIS target
description: |
|
|
103
|
Tuesday, October 27, 2020, 12:53 |
Aaron Schmidt | Nb#9 | LP-SIS | ITE | TM4 | 44508-2 | | Ready | Nb#9 LP-SIS target description | Nb#9 LP-SIS target description:
|
|
|
104
|
Thursday, November 12, 2020, 11:32 |
Darwin Ortiz Rosales | UCx#31 | HP-SIS | ITE | TM4 | 44160 | 43822 | Ready | UCx#31-Target_description | Target full name ITE-TM4-UC# |
|
|
105
|
Tuesday, March 16, 2021, 17:05 |
Luca Egoriti | ITE-TM4-UC#32-P2N-SIS | HP-SIS | ITE | TM4 | - | - | In progress | UO2 discs cutting | This afternoon, Darwin prepared in the
hot lab fume hood the two UO2 slurries to
be cut into P2N target discs. Later, I took |
|
|
108
|
Wednesday, June 23, 2021, 18:13 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44691-4 | | In progress | Ta#62 Target Description (2) | Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10) |
|
|
114
|
Wednesday, November 10, 2021, 18:09 |
Aaron Schmidt | Ta#63 | LP-SIS | ITE | TM4 | 44691-11 | | In progress | Ta#63 | Ta#63 LP-SIS target
description: |
|
|
116
|
Thursday, June 02, 2022, 16:55 |
Aaron Schmidt | Ta#64 | LP-SIS | ITE | TM4 | 44691-12 | | In progress | Ta#64 Target Description | Thursday, June 02, 2022, 16:54:
Ta#64 LP-SIS target |
|
|
41
|
Wednesday, April 30, 2014, 16:36 |
John Wong | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | | Spent | SiC#30 Target description | Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011. |
|
|
52
|
Wednesday, June 03, 2015, 10:55 |
Laura Lambert | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Ready | ZrC#7 target description | Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description. |
|
|
53
|
Monday, July 06, 2015, 12:18 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-1 | | Failed | ZrC#7 target description |
|
|
|
54
|
Tuesday, July 07, 2015, 13:00 |
John Wong | ZrC#7 | LP-SIS | ITW | TM2 | 41177-2 | | Ready | ZrC#7 (backup1) target description | Tuesday, July 07, 2015, 12:36
Total no. discs = 422
Total packed length = 13.2 cm (measured |
|
|
72
|
Wednesday, March 08, 2017, 15:42 |
Laura Lambert | Ta#51 | LP-SIS | | TM2 | 41790-4 | | In progress | Ta#51 target description | Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description: |
|
|
74
|
Tuesday, May 30, 2017, 15:15 |
Laura Lambert | SiC#36 | HP-FEBIAD-CTL | | TM2 | 41369-10 | | Ready | SiC#36 target description | Tuesday, May 30, 2017, 15:12
See attachment for target |
|
|
76
|
Monday, June 26, 2017, 13:36 |
Laura Lambert | Ta #53 | HP-SIS | | TM2 | 42218-6 | | Ready | Ta#53 target description | Monday, June 26, 2017, 13:32
Ta#53 HP-SIS target description: |
|
|
79
|
Tuesday, September 26, 2017, 12:07 |
Laura Lambert | Ta#54 | HP-SIS | ITW | TM2 | 42218-10 | | Ready | Ta#54 target description | Tuesday, September 26, 2017, 09:31
Ta#54 HP-SIS target description: |
|
|
89
|
Friday, May 31, 2019, 16:11 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | 42972-7 | Ready | Ta#58 Target desription | Ta#58 LP-SIS |
|
|
91
|
Tuesday, July 30, 2019, 15:52 |
Darwin Ortiz Rosales | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | | Ready | Target description |
Tuesday, July 30, 2019, 15:50
See attachment for details |
|
|
92
|
Tuesday, September 17, 2019, 08:47 |
Aaron Schmidt | Ta#59 | LP-SIS | | TM2 | 44062-5 | | In progress | Ta#59 Target description | Tuesday, September 17, 2019, 08:44:
T |
|
|
94
|
Friday, October 11, 2019, 09:26 |
Darwin Ortiz Rosales | SiC#38 | HP-FEBIAD | | TM2 | 42464-4 | | Ready | Target SiC#38 Description | Friday, October 11, 2019, 09:25
See attached picture for description.
|
|
|
97
|
Friday, November 29, 2019, 10:53 |
Darwin Ortiz Rosales | SiC#39 | HP-FEBIAD | | TM2 | 42464-3 | | Ready | Target SiC#39 Description | Friday, December 06, 2019, 15:34
Added SEM images (see attachment#2)
- JW |
|
|
101
|
Tuesday, September 29, 2020, 11:50 |
Marla Cervantes | C#2 | LP-SIS | ITW | TM2 | 44139-9 | | In progress | Target C#2 Description | Tuesday, September 29, 2020, 11:49
See attached picture |
|
|
109
|
Monday, August 16, 2021, 11:02 |
John Wong | UCx#34 | LP-SIS | ITW | TM2 | 44691-5 | 44378-1 | Ready | Target description | Monday, August 16, 2021, 11:01
See attachments for the target description
and SEM images |
|
|
118
|
Tuesday, June 21, 2022, 15:34 |
Matthew Gareau | SiC#42, SiC#43 | | | TM2 | | | Problems/Solutions | Multipin guide pin issues | While removing the SiC#42 it became
apparent that the multipin guide pin had
become loose again and was not allowing the |
|
|
132
|
Friday, June 23, 2023, 09:02 |
Aaron Schmidt | Nb#10 | LP-IG-LIS | ITW | TM2 | 45447-7 | | | Nb#10 target description. | Nb#10 LP-IG-LIS target
description: |
|
|
135
|
Thursday, August 24, 2023, 14:16 |
Aaron Schmidt | Nb#11 | LP-IG-LIS | ITW | TM2 | 45447-9 | | In progress | Nb#11 Target description | Nb#11 LP-IG-LIS target description:
|
|
|
136
|
Wednesday, September 20, 2023, 14:25 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | | In progress | Ta#66 Target description. | Ta#66 LP-SIS target description:
|
|
|
143
|
Tuesday, August 13, 2024, 10:08 |
Aaron Schmidt | Ta#67 Thin Foil Target | LP-SIS | ITE | TM2 | 45447-14 | 45235-10 | Ready | Ta#67 Thin Foil Target description & Notes | T |
|
|
146
|
Friday, September 20, 2024, 14:26 |
Aaron Schmidt | Ta# | LP-SIS | ITE | TM2 | 45447-18 | 45235-13 | Ready | Ta# Target Description | Spare for Ta#68 Ta# |
|
|
147
|
Monday, October 07, 2024, 13:16 |
Aaron Schmidt | Ta#68 | HP-SIS | ITE | TM2 | 45447-26 | 45235-16 | Ready | Ta#68 Target Description | Ta#68 HP-SIS |
|
|
7
|
Friday, June 03, 2011, 09:16 |
John Wong | Ta#37 | LP-SIS | ITW | TM1 | 38634-5 | 36833-7 | Spent | Target is done | Fri Jun 3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), |
|
|
13
|
Tuesday, August 09, 2011, 14:31 |
John Wong | UCx#2 | LP-SIS | ITW | TM1 | 38634-8 | 38633-5 | Spent | UCx#2 run is finished. | UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm |
|
|
14
|
Tuesday, September 06, 2011, 13:19 |
John Wong | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | | Spent | Target is done | Tuesday, September 06, 2011, 13:14:
Average mass = 0.206g
Average Thickness = 0.0189 cm |
|
|
16
|
Tuesday, September 27, 2011, 10:36 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Problems/Solutions | Material deposited on Extraction Electrode after Test Stand |
|
|
|
18
|
Wednesday, November 16, 2011, 14:08 |
John Wong | UCx#3 | LP-SIS | ITW | TM1 | 38634-10 | 36833-3 | Spent | UCx#3 ready to go online | Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat |
|
|
19
|
Monday, February 13, 2012, 16:00 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 ready in the Conditioning Station |
Monday, February 13, 2012,
16:00 |
|
|
22
|
Friday, June 01, 2012, 11:43 |
John Wong | Ta#38 | LP-SIS | ITW | TM1 | 39165-2 | 38633-2 | Spent | Ta#38 target description | Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil thickness = 0.025mm |
|
|
23
|
Monday, June 11, 2012, 13:46 |
John Wong | Nb#6 | LP-SIS | ITW | TM1 | 38634-4 | 36833-1 | Spent | Nb#5 run finished |
|
|
|
25
|
Friday, July 20, 2012, 11:39 |
John Wong | UCx#4 | LP-SIS | ITW | TM1 | 38634-9 | 36833-4 | Spent | UCx#4 target description | Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored |
|
|
32
|
Thursday, April 11, 2013, 14:30 |
John Wong | Ta#39 | LP-SIS | ITW | TM1 | 39165-7 | | Spent | Ta#39 target description | Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm |
|
|
33
|
Thursday, May 30, 2013, 16:58 |
John Wong | UCx#6 | LP-SIS | | TM1 | 39165-6 | 39230-8 | Spent | UCx#6 - target description | Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment
#1. |
|
|
35
|
Friday, August 30, 2013, 12:08 |
John Wong | UCx#7 | LP-SIS | ITW | TM1 | 38634-7 | 39230-4 | Spent | UCx#7 - target description | Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment
#1. |
|
|
43
|
Tuesday, July 15, 2014, 10:54 |
Laura Lambert | Ta # 43 | LP-SIS | ITW | TM1 | 40282-2 | | Ready | Ta # 43 Target Description | Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description: |
|
|
45
|
Monday, July 28, 2014, 15:57 |
John Wong | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | | Spent | ZrC target description | Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description.
Target is currently undergoing the |
|
|
50
|
Friday, April 17, 2015, 16:00 |
Laura Lambert | UCx # 12 | LP-SIS | ITW | TM1 | 41177-2 | | Ready | UCx#12 Target Description | Thursday, April 16, 2015, 14:07
See attachment for target description |
|
|
8
|
Thursday, June 16, 2011, 17:26 |
John Wong | Nb | HP-SIS | | | 38817-1 | | Spent | Target is ready and stored in cabinet | Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete
and ready to be installed in the heat shields: |
|
|
9
|
Friday, June 17, 2011, 11:58 |
John Wong | UCx (flakes) | LP-SIS | | | | | Problems/Solutions | Making UC2 flakes (stock# 2011_A & _B) | Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization
(Stock# 2011_A): |
8x |
|
10
|
Wednesday, July 06, 2011, 14:13 |
John Wong | Ta#40 | HP-SIS | | | 38295-4 | | Spent | Target description | Details about Ta Hp surface, w.o#38295-4
(spare):
This target was built as a spare. |
|
|
11
|
Wednesday, July 06, 2011, 14:29 |
John Wong | Nb/Spare | HP-SIS | | | 38817-2 | | In progress | Target ready for Assembly | Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right
= 18.16mm. |
|
|
28
|
Wednesday, September 12, 2012, 01:53 |
John Wong | Nb#7 | LP-SIS | | | 39165-6 | | Spent | Nb#7 target description | Wednesday, September 12, 2012, 02:10
Nb#7 target description:
Total Nb foils = 400 discs |
|
|
36
|
Friday, August 30, 2013, 14:45 |
John Wong | NiO#2 | HP-FEBIAD | | | 39530-6 | 39069-4 | Spent | NiO target description | Friday, August 30, 2013, 14:38
NiO/Ni#2
Average |
|
|
40
|
Monday, March 31, 2014, 15:02 |
John Wong | TiC#4 | HP-SIS | | | 38817-8 | 39956-10 | Spent | Target Description | Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC
+ graphite foils. |
|
|
42
|
Friday, June 06, 2014, 14:09 |
John Wong | UCx#9 | LP-SIS | | | 39165-9 | | Ready | UCx#9 - Target description | Friday, June 06, 2014, 14:08
See attachment for the target description
|
|
|
46
|
Monday, August 18, 2014, 14:39 |
Laura Lambert | ThO2 #1 | LP-SIS | | | | | | ThO2 #1 Target Description | Monday, August 18, 2014, 14:53
See attachment for target description
|
|
|
49
|
Wednesday, April 01, 2015, 11:27 |
Laura Lambert | Ta # 45 | HP-SIS | | | 38817-5 | | In Use | Ta#45 target description | Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description: |
|
|
51
|
Wednesday, April 29, 2015, 15:39 |
Laura Lambert | SiC#31 | HP-SIS | | | 38817-7 | | Ready | SiC#31 Target description | Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description: |
|
|
56
|
Thursday, September 10, 2015, 13:33 |
Laura Lambert | Ta # 46 | HP-SIS | | | 41369-3 | | Ready | Ta#46 target description | Thursday, September 10, 2015, 13:31
Ta#46 HP-SIS target description: |
|
|
57
|
Thursday, September 24, 2015, 13:42 |
Laura Lambert | SiC#32 | HP-FEBIAD | | | 39530-5 | | Ready | SiC#32 target description | Thursday, September 24, 2015, 11:46
See attachment for target description.
|
|
|
58
|
Wednesday, September 30, 2015, 17:08 |
John Wong | Ta # 46 | HP-SIS | | | 41369-3 | | Ready | Ta#46 target description |
|
|
|
59
|
Monday, October 26, 2015, 16:33 |
Laura Lambert | UCx#14 | LP-SIS | | | 41077-5 | | Ready | UCx#14 Target Description | Monday, October 26, 2015, 16:23
Attached please find |
|
|
60
|
Friday, March 04, 2016, 14:57 |
Laura Lambert | UCx#15 | LP-SIS | ITW | | 41077-1 | | Ready | UCx#15 Target Description | Friday, March 04, 2016, 14:56
Attached please find the UCx#15 |
|
|
62
|
Tuesday, April 19, 2016, 11:33 |
Laura Lambert | Ta # 48 | HP-SIS | | | 41369-5 | | Ready | Ta # 48 target description | Tuesday, April 19, 2016, 11:24
Ta#48 HP-SIS target description: |
|
|
63
|
Wednesday, June 08, 2016, 15:55 |
Laura Lambert | UCx#16 | LP-IG-LIS | | | 40860-2 | | Ready | UCx#16 Target Description | Wednesday, June 08, 2016, 15:52
Attached please find the UCx#16 |
|
|
64
|
Wednesday, June 29, 2016, 11:49 |
Laura Lambert | SiC # 33 | HP-SIS | | | 41369-4 | | Ready | SiC#33 target description | Wednesday, June 29, 2016, 11:47
See attachment for target |
|
|
65
|
Tuesday, August 02, 2016, 15:28 |
Laura Lambert | UCx#17 | LP-SIS | | | 41790-3 | | Ready | UCx#17 Target Description | Tuesday, August 02, 2016, 15:27
Attached please find |
|
|
66
|
Tuesday, August 02, 2016, 15:42 |
Laura Lambert | Ta # 49 | HP-SIS | | | 41369-6 | | Ready | Ta#49 target description | Tuesday, August 02, 2016, 15:30
Ta#49 HP-SIS target description: |
|
|
67
|
Friday, September 02, 2016, 14:45 |
John Wong | SiC#34 | LP-IG-LIS | | | 39814-V2-1 | | Ready | SiC#34 Target Description | Friday, September 02, 2016, 14:43
See attachment for target description
|
|
|
68
|
Friday, October 07, 2016, 16:27 |
John Wong | SiC#35 | HP-FEBIAD | | | 39530-9 | | Ready | SiC35 Target description | Friday, October 07, 2016, 16:28
See attachment for the target description
|
|
|
69
|
Tuesday, October 18, 2016, 12:06 |
Laura Lambert | Ta#50 | LP-SIS | | | 41790-5 | | Ready | Ta#50 target description | Tuesday, October 18, 2016, 10:12
Ta#50 LP-SIS target description: |
|
|
70
|
Friday, October 21, 2016, 13:47 |
Laura Lambert | UCx#18 | LP-SIS | | | 41790-6 | | Ready | UCx#18 Target Description | Friday, October 21, 2016, 13:46
Attached please find |
|
|
77
|
Thursday, July 06, 2017, 15:36 |
Anders Mjos | Ta#55 | LP-SIS | | | 42218-11 | | Ready | Ta#55 target description | Target loaded by Matt yesterday
320 foils = 33.7832 g
4 x 20 packs = 9.1170 g |
|
|
78
|
Monday, August 21, 2017, 11:13 |
Laura Lambert | UCx#21 | LP-SIS | | | 42218-15 | | Ready | UCx#21 Target Description | Monday, August 21, 2017, 11:09
Attached please find |
|
|
81
|
Monday, April 16, 2018, 09:55 |
Laura Lambert | UCx#22 | LP-SIS | | | 42218-13 | | Ready | UCx#22 Target Description | Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target
description. |
|
|
82
|
Thursday, June 21, 2018, 11:34 |
Aaron Schmidt | Ta#56 | HP-SIS | | | 42218-9 | | Ready | Ta#56 target description | Thursday, June 21, 2018, 11:33:
Ta#56 HP-SIS target |
|
|
83
|
Friday, July 13, 2018, 14:41 |
John Wong | UCx#23 | LP-FEBIAD-CTL | | | | | Ready | UCx#23 target description | Friday, July 13, 2018, 14:40
Target is ready for installation.
See attachment for description |
|
|
84
|
Monday, August 27, 2018, 17:11 |
John Wong | UCx#24 | LP-SIS | | | | | Ready | UCx#24 Target Description | Monday, August 27, 2018, 17:09
See attachment for UCx#24 target
description |
|
|
85
|
Monday, September 17, 2018, 11:39 |
John Wong | np-SiC#1 | LP-SIS | | | 43044-1 | | Ready | nano-SiC#1 Target description | Monday, September 17, 2018, 11:32
See attachment for the target description.
Some notes about the target conditioning |
|
|
86
|
Friday, October 12, 2018, 17:14 |
John Wong | UCx#25 | LP-SIS | | | | | In progress | UCx#25 Target Description | Friday, October 12, 2018, 17:11
See attachment for UCx#25 target
description. |
|
|
88
|
Thursday, November 29, 2018, 14:23 |
Marla Cervantes | UCx#26 | LP-IG-LIS | | | 42281-3 | | Ready | UCx#26 Target description | Thursday, November 29, 2018, 14:20
Attached please find |
|
|
90
|
Monday, July 22, 2019, 16:33 |
Marla Cervantes | UCx#27 | LP-SIS | | | 49044-9 | | Ready | UCx#27 Target Description | Monday, July 22, 2019, 16:31
Attached please find |
|
|
93
|
Wednesday, October 02, 2019, 11:18 |
Marla Cervantes | UCx#28 | LP-SIS | | | 44062-4 | | Ready | UCx #28 Target description | Wednesday, October 02, 2019, 11:17
Attached please find |
|
|
95
|
Monday, October 21, 2019, 12:38 |
Darwin Ortiz Rosales | UCx#29 | LP-SIS | | | 44062-6 | | Ready | UCx29-target_description | |
|
|
96
|
Tuesday, November 19, 2019, 12:20 |
Darwin Ortiz Rosales | UCx#30 | LP-SIS | | | 44062-3 | | Ready | UCx30-target_description | |
|
|
98
|
Thursday, February 20, 2020, 08:11 |
Aaron Schmidt | Ta#60 | LP-SIS | | | 44139-13 | | Ready | Ta#60 Target Description | Thursday, February 20, 2020, 08:07:
Ta#60 LP-SIS target description: |
|
|
99
|
Wednesday, April 15, 2020, 08:10 |
Darwin Ortiz Rosales | SiC#40 | HP-SIS | | | 42218-8 | | Ready | Target SiC#40 Description | Wednesday, April 15, 2020, 07:51
See attached picture for description |
|
|
100
|
Thursday, June 04, 2020, 15:00 |
Marla Cervantes | C#1 | LP-SIS | | | 43044-8 | | In progress | Target C#1 Description | Thursday, June 04, 2020, 15:00
See attached picture |
|
|
106
|
Thursday, April 08, 2021, 09:54 |
Aaron Schmidt | Ta#62 | LP-SIS | | | 44139-10 | | Ready | Ta#62 target description | Ta#62 LP-SIS target description:
|
|
|
107
|
Wednesday, June 09, 2021, 11:45 |
Darwin Ortiz Rosales | UCx#33 | LP-SIS | | | 44139-12 | | Ready | UCx#33-Target_description | Cartridge with discs was further
heated in EVAP1 (eLog 271 Evaporator 1). |
|
|
110
|
Monday, September 13, 2021, 14:53 |
Darwin Ortiz Rosales | SiC#41 | HP-SIS | | | 42218-7 | | Ready | Target SiC#41 Description | Monday, September 13, 2021, 14:52
|
|
|
111
|
Tuesday, September 21, 2021, 21:08 |
Darwin Ortiz Rosales | C#3 | LP-SIS | | | 44691-7 | | Ready | Target C #3 Description | Tuesday, September 21, 2021, 21:09
See attached file for target description. |
|
|
112
|
Wednesday, September 29, 2021, 10:37 |
Darwin Ortiz Rosales | UCx#35 | LP-IG-LIS | | | 42218-5 | | Ready | UCx#35-Target_description |
|
|
|
113
|
Monday, November 08, 2021, 11:30 |
Darwin Ortiz Rosales | UCx#36 | LP-SIS | | | 44691-1 | | Ready | UCx#36_Target_Description | |
|
|
115
|
Wednesday, May 25, 2022, 10:15 |
Darwin Ortiz Rosales | SiC#42 | HP-FEBIAD | | | 44692-9 | | Ready | Target SiC#42 Description | Wednesday, May 25, 2022, 10:15
|
|
|
117
|
Monday, June 20, 2022, 10:35 |
Darwin Ortiz Rosales | SiC#43 | HP-FEBIAD | | | 42464-1 | | Ready | Target SiC#43 Description | Monday, June 20, 2022, 10:33
|
|
|
119
|
Friday, July 15, 2022, 10:47 |
Darwin Ortiz Rosales | UCx#38 | LP-SIS | | | 44508-3 | | Ready | UCx#38_Target_Description | The bulk density was corrected. Use
attachment number 2.
|
|
|
120
|
Tuesday, August 09, 2022, 11:02 |
Darwin Ortiz Rosales | UCx#39 | LP-IG-LIS | | | 42218-4 | | Ready | UCx#39_Target_Description | |
|
|
121
|
Tuesday, August 16, 2022, 09:48 |
Darwin Ortiz Rosales | SiC#44 | HP-FEBIAD | | | 37978-1 | | Ready | Target SiC#44 Description | Tuesday, August 16, 2022, 09:47
|
|
|
122
|
Thursday, September 22, 2022, 13:18 |
Darwin Ortiz Rosales | C#4 | LP-SIS | | | 44691-3 | | Ready | Target C#4 Description | Thursday, September 22, 2022, 13:17 |
|
|
123
|
Tuesday, October 25, 2022, 13:10 |
Darwin Ortiz Rosales | UCx#40 | LP-SIS | | | 45550-2 | | Ready | UCx#40 Target Description | Tuesday, October 25, 2022, 13:10
Target in Glovebox |
|
|
124
|
Tuesday, November 15, 2022, 08:41 |
Darwin Ortiz Rosales | UCx#41 | LP-SIS | | | 45220-13 | | Ready | | |
|
|
125
|
Wednesday, December 14, 2022, 10:28 |
Darwin Ortiz Rosales | C#5 | | | | 44691-13 | | Ready | Target C#5 Description | Graphite target |
|
|
126
|
Monday, February 06, 2023, 10:02 |
Darwin Ortiz Rosales | C#6 | | | | 45220-6 | | Ready | Target C#6 Description | |
|
|
127
|
Monday, March 06, 2023, 13:38 |
Aaron Schmidt | Ta#65 | LP-SIS | | | 45220-7 | | Ready | Ta#65 Target Description. | Monday, March 06, 2023, 13:38:
Ta#65 LP-SIS target description: |
|
|
128
|
Friday, March 10, 2023, 07:21 |
Aaron Schmidt | | | | | | | Ready | Target Material Batch - Ta | Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013" |
|
|
129
|
Monday, May 01, 2023, 14:59 |
Darwin Ortiz Rosales | TiC #5 | LP-FEBIAD | | | 44692-5 | | Ready | Target TiC #5 Description | |
|
|
130
|
Friday, May 26, 2023, 11:35 |
Darwin Ortiz Rosales | TiC#6 | HP-SIS | | | 44692-10 | | Ready | Target TiC #6 Description | |
|
|
131
|
Friday, May 26, 2023, 11:53 |
Darwin Ortiz Rosales | SiC#45 | HP-SIS | | | 44692-3 | | Ready | | |
|
|
133
|
Wednesday, July 26, 2023, 09:42 |
Darwin Ortiz Rosales | UCx#42 | LP-SIS | | | 45220-1 | | Ready | UCx#42_Description | |
|
|
134
|
Wednesday, July 26, 2023, 12:03 |
Darwin Ortiz Rosales | UCx#43 | LP-SIS | | | 45447-11 | | Ready | UCx#43_Description | |
|
|
137
|
Thursday, October 05, 2023, 12:48 |
Aaron Schmidt | | LP-SIS | | | 45220-3 | | | Ta#( ) Target description. (Spare) | Ta# LP-SIS target |
|
|
138
|
Tuesday, October 24, 2023, 11:30 |
Darwin Ortiz Rosales | UCx#44 | LP-FEBIAD | | | 41790-7 | | Ready | UCx#44_Description | Three Ta heatshields left installed on
container. |
|
|
139
|
Tuesday, March 05, 2024, 10:15 |
Aaron Schmidt | Ta | LP-SIS | | | 45447-15 | | Ready | Ta# (March stock) Target Description. | Tuesday, March 05, 2024, 10:12: Ta# |
|
|
140
|
Wednesday, May 22, 2024, 22:32 |
Darwin Ortiz Rosales | UCx#45 | LP-SIS | | | 45220-9 | | Ready | UCx#45_Description | |
|
|
141
|
Friday, June 14, 2024, 14:12 |
Darwin Ortiz Rosales | SiC#46 | HP-SIS | | | 44692-2 | 45235-6 | Ready | SiC#46_description | |
|
|
142
|
Friday, June 14, 2024, 14:16 |
Darwin Ortiz Rosales | TiC#7 | HP-FEBIAD | | | 45447-5 | 45235-15 | Ready | TiC#7_Description | Please note that this target comes in a
Graphite cartridge. |
|
|
144
|
Tuesday, September 03, 2024, 16:11 |
Darwin Ortiz Rosales | TiC#8 | HP-FEBIAD | | | 45447-2 | | Ready | TiC#8_Description | This was back-up target |
|
|
145
|
Tuesday, September 10, 2024, 09:53 |
Darwin Ortiz Rosales | TiC#9 | HP-SIS | | | 45447-29 | 45235-19 | Ready | TiC#9_Description | |
|
|
148
|
Tuesday, November 12, 2024, 12:49 |
Darwin Ortiz Rosales | UCx#46 | LP-IG-LIS | | | 42218-2 | | Ready | UCx#46_Description | |
|
|
149
|
Thursday, January 02, 2025, 12:54 |
Darwin Ortiz Rosales | UCx#47 | LP-SIS | | | 45447-12 | | Ready | UCx#47_Description | |
|