Entry  Monday, February 13, 2012, 16:00, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 ready in the Conditioning Station 
    Reply  Monday, June 11, 2012, 13:46, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 run finished 
Message ID: 19     Entry time: Monday, February 13, 2012, 16:00     Reply to this: 23
Author: John Wong 
Target/No.#: Nb#6 
Source: LP-SIS 
Station: ITW 
Module: TM1 
Target Oven W.O#: 38634-4 
Heat Shield W.O#: 36833-1 
Status: Spent 
Subject: Nb#5 ready in the Conditioning Station 

 


Monday, February 13, 2012, 16:00 

Nb#5 target description:

Total Nb foils = 400

Total Mass (400 foils + Ta wire) = 24.52g

Total Length = 4.0cm

Target thickness = 11.57 g/cm2

Target Density = 8.57g/cm3

Inserted Rh foil (1cmx1cm)

Added standard salts before test-stand:

15ml Cs

10ml Li, Na, Rb  

5ml K 


Monday, April 23, 2012, 08:58

Target was tested in the test stand, see https://elog.triumf.ca/TIS/Test-Stand/77 for more details.

No salts were added after the test.  The target is now in the conditioning station. 

 


 