Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production  Not logged in ELOG logo
Message ID: 41     Entry time: Wednesday, April 30, 2014, 16:36
Author: John Wong 
Target/No.#: SiC#30 
Source: HP-FEBIAD 
Station: ITE 
Module: TM3 
Target Oven W.O#: 38481-8 
Heat Shield W.O#:  
Status: Spent 
Subject: SiC#30 Target description  

Wednesday, April 30, 2014, 15:16

Note:

This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target was re-conditioned.

See elogs for more details:

https://elog.triumf.ca/TIS/Evaporator_1/20

The target was inspected and was good for online use.


Total SiC foils = 555 discs

Total length (packed) = 17.5cm

Total SiC mass (plus graphite foils) = 52.902g

See attachment for density measurements


 

 

 

Attachment 1: SiC#30_density_measurements.xlsx  15 kB
ELOG V2.9.2-2455