Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production  Not logged in ELOG logo
Message ID: 27     Entry time: Wednesday, August 29, 2012, 14:52
Author: John Wong 
Target/No.#: UCx#5 
Source: LP-SIS 
Station: ITW 
Module: TM4 
Target Oven W.O#: 39165-5 
Heat Shield W.O#:  
Status: Failed 
Subject: UCx#5 target description  

Wednesday, August 29, 2012, 14:50

UCx#5 target description, see attachment#1

The target is currently undergoing the final conditioning in the Evaporator #1. 


 Wednesday, December 05, 2012, 15:46

This target was broken right before the end of the final run.  The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357

Looks like the protective layer (TaC coating) was worn out over the course of the run time. 

We need to improve the target coating so this can be prevented in the future.

More info about this later...


 

Attachment 1: UCx#5_specifications.PNG  55 kB  Uploaded Friday, June 21, 2013, 16:02  | Show | Hide all
ELOG V2.9.2-2455