Message ID: 12     Entry time: Wednesday, July 06, 2011, 14:32
Author: John Wong 
Target/No.#: Ta#36 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 38634-2 
Heat Shield W.O#: 38307-10 
Status: Spent 
Subject: Target ready, will go online on July 27 

Ta-LP-SIS (w.o#38634-2)

Target consists of 400 Ta foils, 4.4 cm in length.  Total mass + Ta wire = 40.87g.

Thursday, July 07, 2011, 15:43:  Begin target assembly. 

Friday, July 08, 2011, 14:24: assembly completed.  Std stds added for test-stand: Li, Na, Rb, K, Cs.

Friday, July 15, 2011, 09:09:  Target currently in test-stand.  Will come out on Monday next week.  Need to add std salts + Be. 

Monday, July 18, 2011, 10:58:  Target removed from test-stand.  Std salts added (Li, Na, Rb, K, Cs) & Be (as requested by Jens).  Maico D.V will do a final inspection on the target before it goes into the hotcell

 