Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production  Not logged in ELOG logo
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  
Message ID: 53     Entry time: Monday, July 06, 2015, 12:18     In reply to: 52
Author: John Wong 
Target/No.#: ZrC#7 
Source: LP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 41177-1 
Heat Shield W.O#:  
Status: Failed 
Subject: ZrC#7 target description  

Laura Lambert wrote:

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

 Monday, July 06, 2015, 12:10

This target did not pass the test-stand and will not be used for online (unless if it gets approved).  The target container is deformed.  An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?!  See Test-stand e-log#450 for more details.  

Another target is already prepared and being tested.  (Target Oven WO# 41177-2). 


 

ELOG V2.9.2-2455