Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
|
Target Production |
Not logged in |
|
|
Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
|
Message ID: 15
Entry time: Friday, September 23, 2011, 17:03
Reply to this: 17
|
Author: |
Anders Mjos |
Target/No.#: |
SiC#26 |
Source: |
HP-FEBIAD |
Station: |
ITE |
Module: |
TM4 |
Target Oven W.O#: |
38295-9 |
Heat Shield W.O#: |
38307-8 |
Status: |
Spent |
Subject: |
Run finished |
|
|
Friday, September 23, 2011, 16:54:
- Cu-gaskets used for leak checking target had a leak rate of about 10-8 10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
- The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.
- Target is now in the test stand and pumping down.
|