Entry  Tuesday, March 29, 2011, 14:14, John Wong, Ta#35, HP-SIS, ITE, TM4, 38481-3, 38303-4, Spent, ITE-TM4-Ta#35-Hp-SIS  Ta-HPSIS.jpg
ITE-TM4-Ta#35-Hp-SIS
Thu Apr  7 15:32:32 2011:
Target oven - w.o#38481-3.
Entry  Thursday, March 31, 2011, 15:38, John Wong, SiC#25, HP-SIS, ITE, TM4, 38481-1, 38307-?, Spent, ITE-TM4-SiC#25-Hp-SIS  big_mass_scan.jpg
Thu Mar 31 15:19:51 2011:  SiC#25 was made sometime in December of 2010.  It is now in the target module and ready to be conditioned. 
Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand.  However, 
there were enough 40Ca and 39K  for tuning (See attachment#1 for the big mass scan).  Once the P+ is back, the yields will be measured.
Entry  Friday, June 03, 2011, 09:16, John Wong, Ta#37, LP-SIS, ITW, TM1, 38634-5, 36833-7, Spent, Target is done EE.JPGEE-CuO.jpg
 Fri Jun  3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), 4.0 cm in length.  Total mass + Ta wire = 42.32g.  The heat shield was assembled and tested, and the
Entry  Thursday, June 16, 2011, 17:26, John Wong, Nb, HP-SIS, , , 38817-1, , Spent, Target is ready and stored in cabinet  
 Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:
-----------------------------------------------------------------------------------
Entry  Wednesday, July 06, 2011, 14:13, John Wong, Ta#40, HP-SIS, , , 38295-4, , Spent, Target description  
Details about Ta Hp surface, w.o#38295-4 (spare): 
This target was built as a spare.
 
Entry  Wednesday, July 06, 2011, 14:32, John Wong, Ta#36, LP-SIS, ITE, TM4, 38634-2, 38307-10, Spent, Target ready, will go online on July 27 
Ta-LP-SIS (w.o#38634-2)
Target  consists of 400 Ta foils, 4.4 cm in length.  Total mass + Ta wire =  40.87g.
Thursday, July 07, 2011, 15:43:  Begin target assembly. 
Entry  Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished. broke_screwhead.jpgUCx#2.jpg
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Entry  Tuesday, September 06, 2011, 13:19, John Wong, TaC#1, LP-SIS, ITE, TM1, 38634-6, , Spent, Target is done TaC_density_measurements.xls
Tuesday, September 06, 2011, 13:14: 
Average mass = 0.206g
Average Thickness = 0.0189 cm
Entry  Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished 
Friday, September 23, 2011, 16:54:

    Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced
with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
    The target can not hold high voltage when it is sitting
    Reply  Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished EE_after_teststand.jpgSiC#26_specification.png


    
        
            Anders Mjos wrote:
        
        
            
            Friday, September 23, 2011, 16:54:
Entry  Wednesday, November 16, 2011, 14:08, John Wong, UCx#3, LP-SIS, ITW, TM1, 38634-10, 36833-3, Spent, UCx#3 ready to go online UCx#3_assembly.jpg
 Wednesday, November 16, 2011, 13:51
UCx#3 descriptions: 
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1)
Entry  Monday, February 13, 2012, 16:00, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 ready in the Conditioning Station 
 

Monday, February 13, 2012, 16:00 
Nb#5 target description:
Entry  Monday, February 20, 2012, 16:39, John Wong, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, , Spent, target ready for assembly 
 Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 
Entry  Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description SiC#27_specification.png
 Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
Entry  Friday, June 01, 2012, 11:43, John Wong, Ta#38, LP-SIS, ITW, TM1, 39165-2, 38633-2, Spent, Ta#38 target description Ta_38_EE_deposit.JPGTa#38_EE.PNGTa#38_CE.PNG
Ta#38 LP-SIS target description: 
Total Ta foils = 400
Foil thickness = 0.025mm
    Reply  Monday, June 11, 2012, 13:46, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 run finished 


    
        
            John Wong wrote:
        
        
            
             
    Reply  Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled UO2#3_Anode_End_Cap.xlsx


    
        
            John Wong wrote:
        
        
            
             Monday, February 20, 2012, 16:25
Entry  Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description UCx#4_specfications.PNG
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.
Entry  Wednesday, September 12, 2012, 01:53, John Wong, Nb#7, LP-SIS, , , 39165-6, , Spent, Nb#7 target description Nb#7_target_description.jpg
 Wednesday, September 12, 2012, 02:10
Nb#7 target description: 
Total Nb foils = 400 discs
Entry  Thursday, October 11, 2012, 11:41, John Wong, NiO#1, HP-FEBIAD, ITE, TM4, 38481-7, 39069-1/10(lid), Spent, NiO target description  
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
 
Entry  Tuesday, March 19, 2013, 13:32, John Wong, SiC#28-RFQ, LP-SIS, , TM4, LP-RFQ (NEW), , Spent, SiC#28-RFQ target description SiC#28_RFQ_density_measurements.xlsx
 Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description: 
Total SiC foils = 325 discs
Entry  Thursday, April 11, 2013, 14:30, John Wong, Ta#39, LP-SIS, ITW, TM1, 39165-7, , Spent, Ta#39 target description 
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm
Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG
 Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1. 
The target is currently undergoing the final conditioning in the Evaporator#1.
Entry  Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description SiC#29_density_measurements_final.xlsx
Wednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
Entry  Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description 
Friday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
Entry  Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description 
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
Entry  Wednesday, November 27, 2013, 17:56, John Wong, UCx#8, LP-IG-LIS, ITE, TM4, 39814-IV, , Spent, UCx#8 target description  UCx_8_specification.PNG
Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1

 
Entry  Monday, March 17, 2014, 16:15, John Wong, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1, Spent, Ta#42 Target description  
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG
 Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils. 
Total length = 11.7cm 
Entry  Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description  SiC#30_density_measurements.xlsx
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target
Entry  Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description  ZrC#6.JPG
 Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description. 
Target is currently undergoing the sintering process
Entry  Friday, March 11, 2016, 10:18, Laura Lambert, Ta # 47, , ITE, TM4, , , Spent, Ta # 47 target desscription 
Friday, March 11, 2016, 10:13 
Ta#47 LP-SIS [new small center block] target description:
Total Ta foils = 470
Entry  Tuesday, December 11, 2012, 15:44, Anders Mjos, SiC, HP-FEBIAD, ITW, TM4, na, na (old style fittings), Ready, Test target for the Conditioning Station 
 The target has been used for operator training previously at the ISAC Test Stand.

    9-pin connector was completed and grounded
    RH gripper arms added to the heat shield

Further documentation
on DocuShare
Entry  Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description  UCx#9_target_description_1.JPG
 Friday, June 06, 2014, 14:08
See attachment for the target description

 
Entry  Tuesday, July 15, 2014, 10:54, Laura Lambert, Ta # 43, LP-SIS, ITW, TM1, 40282-2, , Ready, Ta # 43 Target Description 
 Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description UCx_10_target_description.PNG
Tuesday, July 15, 2014, 10:58
See attachment for target description 
Entry  Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description 
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Entry  Thursday, November 06, 2014, 13:35, Laura Lambert, UCx # 11, LP-SIS, ITE, TM4, 40282-5, , Ready, UCx#11 Target Description UCx_11_target_description.PNG
 Thursday, November 06, 2014, 13:29
See attachment for target description

 
Entry  Friday, April 17, 2015, 16:00, Laura Lambert, UCx # 12, LP-SIS, ITW, TM1, 41177-2, , Ready, UCx#12 Target Description UCx_12_target_description.PNG
 Thursday, April 16, 2015, 14:07
See attachment for target description
Entry  Wednesday, April 29, 2015, 15:39, Laura Lambert, SiC#31, HP-SIS, , , 38817-7, , Ready, SiC#31 Target description final_density_measurements.JPGdensity_measurements.xlsxSiC_density_Jan_10_'14_cast_-_Copy.xlsxSiC_density_Oct_31_'14_cast.xlsx
 Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description: 
Total SiC foils = 520 discs 
Entry  Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description  target_production_elog_ZrC#7.JPGZrC#7_final_density.xlsx
 Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description.
Entry  Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description ZrC#7_backup.PNGZrC_specification_(backup#1_WO#41177-2).xlsx
Tuesday, July 07, 2015, 12:36 
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) 
Entry  Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description UCx_13_target_description.PNG
 Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.   
Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  
Entry  Thursday, September 10, 2015, 13:33, Laura Lambert, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description 
 Thursday, September 10, 2015, 13:31
Ta#46 HP-SIS target description:
Total Ta foils = 505
Entry  Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description elog_snapshot.JPG
 Thursday, September 24, 2015, 11:46
See attachment for target description.

 
    Reply  Wednesday, September 30, 2015, 17:08, John Wong, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description 


    
        
            Laura Lambert wrote:
        
        
            
             Thursday, September 10, 2015, 13:31
Entry  Monday, October 26, 2015, 16:33, Laura Lambert, UCx#14, LP-SIS, , , 41077-5, , Ready, UCx#14 Target Description Capture.JPG
 Monday, October 26, 2015, 16:23
Attached please find the UCx#14 target description.
Note: This is the first UCx target using the new LP-SIS small center block design.
Entry  Friday, March 04, 2016, 14:57, Laura Lambert, UCx#15, LP-SIS, ITW, , 41077-1, , Ready, UCx#15 Target Description UCx_15_description.jpg
 Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design.
Entry  Tuesday, April 19, 2016, 11:33, Laura Lambert, Ta # 48, HP-SIS, , , 41369-5, , Ready, Ta # 48 target description 
 Tuesday, April 19, 2016, 11:24
Ta#48 HP-SIS target description:
Total Ta foils = 505
Entry  Wednesday, June 08, 2016, 15:55, Laura Lambert, UCx#16, LP-IG-LIS, , , 40860-2, , Ready, UCx#16 Target Description Target_Description.JPG
 Wednesday, June 08, 2016, 15:52
Attached please find the UCx#16 target description.

 
Entry  Wednesday, June 29, 2016, 11:49, Laura Lambert, SiC # 33, HP-SIS, , , 41369-4, , Ready, SiC#33 target description elog_target_description.JPG
 Wednesday, June 29, 2016, 11:47
See attachment for target description.

 
Entry  Tuesday, August 02, 2016, 15:28, Laura Lambert, UCx#17, LP-SIS, , , 41790-3, , Ready, UCx#17 Target Description UCx#17_description.jpg
 Tuesday, August 02, 2016, 15:27
Attached please find the UCx#17 target description.

 
Entry  Tuesday, August 02, 2016, 15:42, Laura Lambert, Ta # 49, HP-SIS, , , 41369-6, , Ready, Ta#49 target description 
 Tuesday, August 02, 2016, 15:30
Ta#49 HP-SIS target description:
Total Ta foils = 500 [6x20 packs + 380 single discs]
Entry  Friday, September 02, 2016, 14:45, John Wong, SiC#34, LP-IG-LIS, , , 39814-V2-1, , Ready, SiC#34 Target Description  SiC34_target_description.JPG
 Friday, September 02, 2016, 14:43
See attachment for target description 

 
Entry  Friday, October 07, 2016, 16:27, John Wong, SiC#35, HP-FEBIAD, , , 39530-9, , Ready, SiC35 Target description  SiC35_target_description.JPG
Friday, October 07, 2016, 16:28
See attachment for the target description

 
Entry  Tuesday, October 18, 2016, 12:06, Laura Lambert, Ta#50, LP-SIS, , , 41790-5, , Ready, Ta#50 target description 
Tuesday, October 18, 2016, 10:12
Ta#50 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Friday, October 21, 2016, 13:47, Laura Lambert, UCx#18, LP-SIS, , , 41790-6, , Ready, UCx#18 Target Description UCx#18_description.jpg
 Friday, October 21, 2016, 13:46
Attached please find the UCx#18 target description.

 
Entry  Tuesday, March 07, 2017, 10:00, Laura Lambert, UCx#19, LP-SIS, , TM4, 42218-12, , Ready, UCx#19 Target Description UCx#19_description.jpg
 Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.

 
Entry  Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description target_description.JPG
 Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.

 
Entry  Tuesday, May 30, 2017, 15:15, Laura Lambert, SiC#36, HP-FEBIAD-CTL, , TM2, 41369-10, , Ready, SiC#36 target description SiC#36_Target_Description.JPG
 Tuesday, May 30, 2017, 15:12
See attachment for target description.

 
Entry  Monday, June 26, 2017, 13:36, Laura Lambert, Ta #53, HP-SIS, , TM2, 42218-6, , Ready, Ta#53 target description 
 Monday, June 26, 2017, 13:32
Ta#53 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, July 06, 2017, 15:36, Anders Mjos, Ta#55, LP-SIS, , , 42218-11, , Ready, Ta#55 target description 
Target loaded by Matt yesterday
320 foils = 33.7832 g
4 x 20 packs = 9.1170 g
Entry  Monday, August 21, 2017, 11:13, Laura Lambert, UCx#21, LP-SIS, , , 42218-15, , Ready, UCx#21 Target Description target_description.JPG
 Monday, August 21, 2017, 11:09
Attached please find the UCx#21 target description.

 
Entry  Tuesday, September 26, 2017, 12:07, Laura Lambert, Ta#54, HP-SIS, ITW, TM2, 42218-10, , Ready, Ta#54 target description 
Tuesday, September 26, 2017, 09:31
Ta#54 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description Target_Description.JPG
 Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
Entry  Monday, April 16, 2018, 09:55, Laura Lambert, UCx#22, LP-SIS, , , 42218-13, , Ready, UCx#22 Target Description target_description.JPG
 Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target description.

 
Entry  Thursday, June 21, 2018, 11:34, Aaron Schmidt, Ta#56, HP-SIS, , , 42218-9, , Ready, Ta#56 target description Ta#56_Loading_Data.pdf
 Thursday, June 21, 2018, 11:33:
Ta#56 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description UCx_23-target_description.JPG
Friday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description
Entry  Monday, August 27, 2018, 17:11, John Wong, UCx#24, LP-SIS, , , , , Ready, UCx#24 Target Description  Capture.JPG
Monday, August 27, 2018, 17:09
See attachment for UCx#24 target description

 
Entry  Monday, September 17, 2018, 11:39, John Wong, np-SiC#1, LP-SIS, , , 43044-1, , Ready, nano-SiC#1 Target description target_description.JPG
Monday, September 17, 2018, 11:32
See attachment for the target description.
Some notes about the target conditioning in Evap#2 (see elog ID#414):
Entry  Thursday, November 29, 2018, 14:23, Marla Cervantes, UCx#26, LP-IG-LIS, , , 42281-3, , Ready, UCx#26 Target description UCx_26-description.JPG
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description. 

 
Entry  Friday, May 31, 2019, 16:11, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, Ready, Ta#58 Target desription Ta#58_Loading_data.pdf
 Ta#58 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Monday, July 22, 2019, 16:33, Marla Cervantes, UCx#27, LP-SIS, , , 49044-9, , Ready, UCx#27 Target Description UCx#27.JPG
 Monday, July 22, 2019, 16:31
Attached please find the UCx#27 target description. 
Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf
 
Tuesday, July 30, 2019, 15:50
See attachment for details
Entry  Wednesday, October 02, 2019, 11:18, Marla Cervantes, UCx#28, LP-SIS, , , 44062-4, , Ready, UCx #28 Target description UCx28-target_description.JPG
 Wednesday, October 02, 2019, 11:17
Attached please find the UCx#28 target description. 
Entry  Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description SiC#38.PNG
Friday, October 11, 2019, 09:25
See attached picture for description.
 
Entry  Monday, October 21, 2019, 12:38, Darwin Ortiz Rosales, UCx#29, LP-SIS, , , 44062-6 , , Ready, UCx29-target_description UCx#29.PNG
 
Entry  Tuesday, November 19, 2019, 12:20, Darwin Ortiz Rosales, UCx#30, LP-SIS, , , 44062-3 , , Ready, UCx30-target_description  UCx#30.PNGUCx30-taret_description_revised.png
 
Entry  Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description SiC#39_description.PNGSiC39_SEM.pdf
Friday, December 06, 2019, 15:34
Added SEM images (see attachment#2) - JW

 
Entry  Thursday, February 20, 2020, 08:11, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, , Ready, Ta#60 Target Description Ta#60_Loading_Data.pdf
 Thursday, February 20, 2020, 08:07: 
Ta#60 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, April 15, 2020, 08:10, Darwin Ortiz Rosales, SiC#40, HP-SIS, , , 42218-8, , Ready, Target SiC#40 Description Annotation_2020-04-15_080836.png
Wednesday, April 15, 2020, 07:51
See attached picture for description 
Entry  Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description Nb#9_Target_Loading_data.pdf
 Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description UCx31-target_description.png
 Target full name ITE-TM4-UC#
Entry  Thursday, April 08, 2021, 09:54, Aaron Schmidt, Ta#62, LP-SIS, , , 44139-10, , Ready, Ta#62 target description 
Ta#62 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Wednesday, June 09, 2021, 11:45, Darwin Ortiz Rosales, UCx#33, LP-SIS, , , 44139-12, , Ready, UCx#33-Target_description UCx33-target_description.png
 Cartridge with discs was further heated in EVAP1 (eLog 271 Evaporator 1).
Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images

 
Entry  Monday, September 13, 2021, 14:53, Darwin Ortiz Rosales, SiC#41, HP-SIS, , , 42218-7, , Ready, Target SiC#41 Description Screenshot_2021-09-13_144830.png
Monday, September 13, 2021, 14:52
Entry  Tuesday, September 21, 2021, 21:08, Darwin Ortiz Rosales, C#3, LP-SIS, , , 44691-7, , Ready, Target C #3 Description C#3_Target_description.png
 Tuesday, September 21, 2021, 21:09
See attached file for target description.
Entry  Wednesday, September 29, 2021, 10:37, Darwin Ortiz Rosales, UCx#35, LP-IG-LIS, , , 42218-5, , Ready, UCx#35-Target_description UCx#35_Target_Description_.png
 

      
Entry  Monday, November 08, 2021, 11:30, Darwin Ortiz Rosales, UCx#36, LP-SIS, , , 44691-1, , Ready, UCx#36_Target_Description  UCx#36_properties.png
 
Entry  Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description Description-SiC#42.png
Wednesday, May 25, 2022, 10:15 
Entry  Monday, June 20, 2022, 10:35, Darwin Ortiz Rosales, SiC#43, HP-FEBIAD, , , 42464-1, , Ready, Target SiC#43 Description 
Monday, June 20, 2022, 10:33 
Entry  Friday, July 15, 2022, 10:47, Darwin Ortiz Rosales, UCx#38, LP-SIS, , , 44508-3, , Ready, UCx#38_Target_Description  UCx#38.pngUCx#38.png
The bulk density was corrected.  Use attachment number 2.
 
Darwin
Entry  Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description UCx#39_Description.png
 
Entry  Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description 
Tuesday, August 16, 2022, 09:47 
Entry  Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description C#4_Target_Description.png
Thursday, September 22, 2022, 13:17
Entry  Tuesday, October 25, 2022, 13:10, Darwin Ortiz Rosales, UCx#40, LP-SIS, , , 45550-2, , Ready, UCx#40 Target Description UCx#40_Description.png
Tuesday, October 25, 2022, 13:10 
Target in Glovebox
Entry  Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,  UCx#41_Description.png
 
Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png
Graphite target
Entry  Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, C#6, , , , 45220-6, , Ready, Target C#6 Description C#6_Description.png
 
Entry  Monday, March 06, 2023, 13:38, Aaron Schmidt, Ta#65, LP-SIS, , , 45220-7, , Ready, Ta#65 Target Description. 
 Monday, March 06, 2023, 13:38:
Ta#65 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta Ta_2023_-_01.pdf
 Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Friday, May 26, 2023, 11:53, Darwin Ortiz Rosales, SiC#45, HP-SIS, , , 44692-3, , Ready,  SiC#45.png
 
Entry  Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description UCx#42_Description.png
 
Entry  Wednesday, July 26, 2023, 12:03, Darwin Ortiz Rosales, UCx#43, LP-SIS, , , 45447-11, , Ready, UCx#43_Description UCx#43_Description.png
 
Entry  Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description UCx#44_Description.png
Three Ta heatshields left installed on container.
Entry  Tuesday, March 05, 2024, 10:15, Aaron Schmidt, Ta, LP-SIS, , , 45447-15, , Ready, Ta# (March stock) Target Description. 
Tuesday, March 05, 2024, 10:12: Ta#
(Stock - Loaded today) LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, May 22, 2024, 22:32, Darwin Ortiz Rosales, UCx#45, LP-SIS, , , 45220-9, , Ready, UCx#45_Description UCx#45_Description.png
 
Entry  Friday, June 14, 2024, 14:12, Darwin Ortiz Rosales, SiC#46, HP-SIS, , , 44692-2, 45235-6, Ready, SiC#46_description SiC#46.png
 
Entry  Friday, June 14, 2024, 14:16, Darwin Ortiz Rosales, TiC#7, HP-FEBIAD, , , 45447-5, 45235-15, Ready, TiC#7_Description TiC#7.png
Please note that this target comes in a Graphite cartridge.
Entry  Tuesday, August 13, 2024, 10:08, Aaron Schmidt, Ta#67 Thin Foil Target, LP-SIS, ITE, TM2, 45447-14, 45235-10, Ready, Ta#67 Thin Foil Target description & Notes Certificate_of_Analysis_-_Ta_0.01mm.pdf
  Ta#67 Thin foil LP-SIS target description: 
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Entry  Tuesday, September 03, 2024, 16:11, Darwin Ortiz Rosales, TiC#8, HP-FEBIAD, , , 45447-2, , Ready, TiC#8_Description TiC#8_(2).png
This was back-up target
Entry  Tuesday, September 10, 2024, 09:53, Darwin Ortiz Rosales, TiC#9, HP-SIS, , , 45447-29, 45235-19, Ready, TiC#9_Description TiC#9.png
 
Entry  Friday, September 20, 2024, 14:26, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, Ready, Ta# Target Description 
Spare for Ta#68 Ta# LP-SIS
target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
 Ta#68 HP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") avg Measured. 
Entry  Tuesday, November 12, 2024, 12:49, Darwin Ortiz Rosales, UCx#46, LP-IG-LIS, , , 42218-2, , Ready, UCx#46_Description UCx#46_Description.png
 
Entry  Thursday, January 02, 2025, 12:54, Darwin Ortiz Rosales, UCx#47, LP-SIS, , , 45447-12, , Ready, UCx#47_Description UCx#47_Description.png
 
Entry  Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x
Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization (Stock# 2011_A):   
UO2 used = 50.120g (left overs + container = 411.23g)
    Reply  Tuesday, September 27, 2011, 10:36, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Problems/Solutions, Material deposited on Extraction Electrode after Test Stand Deposited_material.pdf


    
        
            John Wong wrote:
        
        
            
            Tuesday, September 06, 2011, 13:14: 
Entry  Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater 
 On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed. 
The polarity swap was not possible because the target/tube assembly has also a short to common. 
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back
Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 
 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off.
Entry  Wednesday, July 06, 2011, 14:29, John Wong, Nb/Spare, HP-SIS, , , 38817-2, , In progress, Target ready for Assembly 
Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).  
Entry  Wednesday, March 08, 2017, 15:42, Laura Lambert, Ta#51, LP-SIS, , TM2, 41790-4, , In progress, Ta#51 target description 
 Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, May 31, 2017, 09:53, Laura Lambert, Ta# 52, LP-SIS, , TM4, 42218-14, , In progress, Ta#52 target description 
 Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
Total Ta foils = 400 [4x20 packs + 320 single discs]
Entry  Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description UCx#25_target_description.JPG
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.

 
Entry  Tuesday, September 17, 2019, 08:47, Aaron Schmidt, Ta#59, LP-SIS, , TM2, 44062-5, , In progress, Ta#59 Target description Ta#59_Loading_Data.pdf
Tuesday, September 17, 2019, 08:44: 
Ta#59 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description C1-Description.PNG
 Thursday, June 04, 2020, 15:00
See attached picture for description 
Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG
 Tuesday, September 29, 2020, 11:49
See attached picture for description 
Entry  Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description 
 Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2) 
 Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63 Ta#63_Target_Loading_Data.pdf
  Ta#63 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description Ta#64_Target_Loading_Data.pdf
Thursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description Nb#11_Target_Loading_Data.pdf
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Wednesday, September 20, 2023, 14:25, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, , In progress, Ta#66 Target description. Ta#66_Target_Loading_Data.pdf
Ta#66 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. 
Entry  Wednesday, April 01, 2015, 11:27, Laura Lambert, Ta # 45, HP-SIS, , , 38817-5, , In Use, Ta#45 target description 
 Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
Total Ta foils = 400
Entry  Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description  UCx#5_specifications.PNG
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. 
    Reply  Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description  


    
        
            Laura Lambert wrote:
        
        
            
             Wednesday, June 03, 2015, 10:53
Entry  Monday, August 18, 2014, 14:39, Laura Lambert, ThO2 #1, LP-SIS, , , , , , ThO2 #1 Target Description ThO2#1_target_description.JPG
Monday, August 18, 2014, 14:53
See attachment for target description

 
Entry  Monday, October 15, 2018, 07:36, Aaron Schmidt, Ta#57, , ITE, TM4, 41177-3, , , Ta#57 Target Description. 
(Laura Lambert: Evap 2 Elog ID: 404) Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Entry  Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description. 
 Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Thursday, October 05, 2023, 12:48, Aaron Schmidt, , LP-SIS, , , 45220-3, , , Ta#( ) Target description. (Spare) Ta#68_Target_Loading_Data.pdf
Ta# LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. 