Tuesday, December 11, 2012, 15:44, Anders Mjos, SiC, HP-FEBIAD, ITW, TM4, na, na (old style fittings), Ready, Test target for the Conditioning Station
|
The target has been used for operator training previously at the ISAC Test Stand.
9-pin connector was completed and grounded
RH gripper arms added to the heat shield
Further documentation
on DocuShare |
Friday, June 14, 2024, 14:12, Darwin Ortiz Rosales, SiC#46, HP-SIS, , , 44692-2, 45235-6, Ready, SiC#46_description
|
|
Tuesday, September 10, 2024, 09:53, Darwin Ortiz Rosales, TiC#9, HP-SIS, , , 45447-29, 45235-19, Ready, TiC#9_Description
|
|
Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description
|
Ta#68 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") avg Measured. |
Friday, June 14, 2024, 14:16, Darwin Ortiz Rosales, TiC#7, HP-FEBIAD, , , 45447-5, 45235-15, Ready, TiC#7_Description
|
Please note that this target comes in a Graphite cartridge. |
Friday, September 20, 2024, 14:26, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, Ready, Ta# Target Description
|
Spare for Ta#68 Ta# LP-SIS
target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Tuesday, August 13, 2024, 10:08, Aaron Schmidt, Ta#67 Thin Foil Target, LP-SIS, ITE, TM2, 45447-14, 45235-10, Ready, Ta#67 Thin Foil Target description & Notes
|
Ta#67 Thin foil LP-SIS target description:
Total Ta foils = 470 loaded into 2 packs of 235 foils each. |
Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description
|
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images
|
Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description
|
Target full name ITE-TM4-UC# |
Friday, May 31, 2019, 16:11, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, Ready, Ta#58 Target desription
|
Ta#58 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description
|
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400 |
Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description
|
Wednesday, July 10, 2013, 18:32
SiC#29 HP-FEBIAD-CTL target description:
Total SiC foils = 510 discs |
Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description
|
Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils.
Total length = 11.7cm |
Monday, March 17, 2014, 16:15, John Wong, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1, Spent, Ta#42 Target description
|
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400 |
Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description
|
Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1.
The target is currently undergoing the final conditioning in the Evaporator#1. |
Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description
|
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon. |
Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description
|
Friday, August 30, 2013, 14:38
NiO/Ni#2
Average |
Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled
|
John Wong wrote:
Monday, February 20, 2012, 16:25 |
Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description
|
Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description:
Total SiC foils = 240 discs |
Thursday, October 11, 2012, 11:41, John Wong, NiO#1, HP-FEBIAD, ITE, TM4, 38481-7, 39069-1/10(lid), Spent, NiO target description
|
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
|
Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished.
|
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm |
Friday, June 01, 2012, 11:43, John Wong, Ta#38, LP-SIS, ITW, TM1, 39165-2, 38633-2, Spent, Ta#38 target description
|
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil thickness = 0.025mm |
Thursday, March 31, 2011, 15:38, John Wong, SiC#25, HP-SIS, ITE, TM4, 38481-1, 38307-?, Spent, ITE-TM4-SiC#25-Hp-SIS
|
Thu Mar 31 15:19:51 2011: SiC#25 was made sometime in December of 2010. It is now in the target module and ready to be conditioned.
Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand. However,
there were enough 40Ca and 39K for tuning (See attachment#1 for the big mass scan). Once the P+ is back, the yields will be measured. |
Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
Friday, September 23, 2011, 16:54:
Cu-gaskets used for leak checking target had a leak rate of about 10-8 10-9 atm cc/sec. Replaced
with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
The target can not hold high voltage when it is sitting |
Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished
|
Anders Mjos wrote:
Friday, September 23, 2011, 16:54: |
Wednesday, July 06, 2011, 14:32, John Wong, Ta#36, LP-SIS, ITE, TM4, 38634-2, 38307-10, Spent, Target ready, will go online on July 27
|
Ta-LP-SIS (w.o#38634-2)
Target consists of 400 Ta foils, 4.4 cm in length. Total mass + Ta wire = 40.87g.
Thursday, July 07, 2011, 15:43: Begin target assembly. |
Tuesday, March 29, 2011, 14:14, John Wong, Ta#35, HP-SIS, ITE, TM4, 38481-3, 38303-4, Spent, ITE-TM4-Ta#35-Hp-SIS
|
ITE-TM4-Ta#35-Hp-SIS
Thu Apr 7 15:32:32 2011:
Target oven - w.o#38481-3. |
Friday, June 03, 2011, 09:16, John Wong, Ta#37, LP-SIS, ITW, TM1, 38634-5, 36833-7, Spent, Target is done
|
Fri Jun 3 12:40:30 2011
Ta#37-LP-SIS (w.o#38634-5)
Filled with 400 Ta foils (25/pk), 4.0 cm in length. Total mass + Ta wire = 42.32g. The heat shield was assembled and tested, and the |
Tuesday, September 27, 2011, 10:36, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Problems/Solutions, Material deposited on Extraction Electrode after Test Stand
|
John Wong wrote:
Tuesday, September 06, 2011, 13:14: |
Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description
|
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box. It will be transported to the South Hotcell on July 31, 2012. |
Wednesday, November 16, 2011, 14:08, John Wong, UCx#3, LP-SIS, ITW, TM1, 38634-10, 36833-3, Spent, UCx#3 ready to go online
|
Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1) |
Monday, February 13, 2012, 16:00, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 ready in the Conditioning Station
|
Monday, February 13, 2012, 16:00
Nb#5 target description: |
Monday, June 11, 2012, 13:46, John Wong, Nb#6, LP-SIS, ITW, TM1, 38634-4, 36833-1, Spent, Nb#5 run finished
|
John Wong wrote:
|
Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting
|
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points. |
Thursday, June 16, 2011, 17:26, John Wong, Nb, HP-SIS, , , 38817-1, , Spent, Target is ready and stored in cabinet
|
Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:
----------------------------------------------------------------------------------- |
Friday, June 17, 2011, 11:58, John Wong, UCx (flakes), LP-SIS, , , , , Problems/Solutions, Making UC2 flakes (stock# 2011_A & _B) 8x
|
Fri Jun 17 10:28:47 2011
First batch of UO2/C mixture of carbonization (Stock# 2011_A):
UO2 used = 50.120g (left overs + container = 411.23g) |
Wednesday, July 06, 2011, 14:13, John Wong, Ta#40, HP-SIS, , , 38295-4, , Spent, Target description
|
Details about Ta Hp surface, w.o#38295-4 (spare):
This target was built as a spare.
|
Wednesday, July 06, 2011, 14:29, John Wong, Nb/Spare, HP-SIS, , , 38817-2, , In progress, Target ready for Assembly
|
Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk). |
Tuesday, September 06, 2011, 13:19, John Wong, TaC#1, LP-SIS, ITE, TM1, 38634-6, , Spent, Target is done
|
Tuesday, September 06, 2011, 13:14:
Average mass = 0.206g
Average Thickness = 0.0189 cm |
Monday, February 20, 2012, 16:39, John Wong, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, , Spent, target ready for assembly
|
Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). |
Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater
|
On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed.
The polarity swap was not possible because the target/tube assembly has also a short to common.
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back |
Wednesday, August 29, 2012, 14:52, John Wong, UCx#5, LP-SIS, ITW, TM4, 39165-5, , Failed, UCx#5 target description
|
Wednesday, August 29, 2012, 14:50
UCx#5 target description, see attachment#1
The target is currently undergoing the final conditioning in the Evaporator #1. |
Wednesday, September 12, 2012, 01:53, John Wong, Nb#7, LP-SIS, , , 39165-6, , Spent, Nb#7 target description
|
Wednesday, September 12, 2012, 02:10
Nb#7 target description:
Total Nb foils = 400 discs |
Tuesday, March 19, 2013, 13:32, John Wong, SiC#28-RFQ, LP-SIS, , TM4, LP-RFQ (NEW), , Spent, SiC#28-RFQ target description
|
Tuesday, March 19, 2013, 12:28
SiC#28 - RFQ target description:
Total SiC foils = 325 discs |
Thursday, April 11, 2013, 14:30, John Wong, Ta#39, LP-SIS, ITW, TM1, 39165-7, , Spent, Ta#39 target description
|
Ta#38 LP-SIS target description:
Total Ta foils = 400
Foil Thickness = 0.025mm |
Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description
|
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400 |
Wednesday, November 27, 2013, 17:56, John Wong, UCx#8, LP-IG-LIS, ITE, TM4, 39814-IV, , Spent, UCx#8 target description
|
Wednesday, November 27, 2013, 17:49
UCx#8 target description - see attachment#1
|
Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description
|
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011. The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target |
Friday, June 06, 2014, 14:09, John Wong, UCx#9, LP-SIS, , , 39165-9, , Ready, UCx#9 - Target description
|
Friday, June 06, 2014, 14:08
See attachment for the target description
|
Tuesday, July 15, 2014, 10:54, Laura Lambert, Ta # 43, LP-SIS, ITW, TM1, 40282-2, , Ready, Ta # 43 Target Description
|
Tuesday, July 15, 2014, 9:45
Ta#42 LP-SIS target description:
Total Ta foils = 400 |
Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description
|
Tuesday, July 15, 2014, 10:58
See attachment for target description |
Monday, July 28, 2014, 15:57, John Wong, ZrC#6, LP-SIS, ITW, TM1, 40282-3, , Spent, ZrC target description
|
Monday, July 28, 2014, 15:52
See attachment#1 for ZrC target description.
Target is currently undergoing the sintering process |
Monday, August 18, 2014, 14:39, Laura Lambert, ThO2 #1, LP-SIS, , , , , , ThO2 #1 Target Description
|
Monday, August 18, 2014, 14:53
See attachment for target description
|
Thursday, November 06, 2014, 13:35, Laura Lambert, UCx # 11, LP-SIS, ITE, TM4, 40282-5, , Ready, UCx#11 Target Description
|
Thursday, November 06, 2014, 13:29
See attachment for target description
|
Wednesday, April 01, 2015, 11:27, Laura Lambert, Ta # 45, HP-SIS, , , 38817-5, , In Use, Ta#45 target description
|
Wednesday, April 01, 2015, 11:25
Ta#45 HP-SIS target description:
Total Ta foils = 400 |
Friday, April 17, 2015, 16:00, Laura Lambert, UCx # 12, LP-SIS, ITW, TM1, 41177-2, , Ready, UCx#12 Target Description
|
Thursday, April 16, 2015, 14:07
See attachment for target description |
Wednesday, April 29, 2015, 15:39, Laura Lambert, SiC#31, HP-SIS, , , 38817-7, , Ready, SiC#31 Target description
|
Wednesday, April 29, 2015, 15:30
SiC#31 HP-SIS target description:
Total SiC foils = 520 discs |
Wednesday, June 03, 2015, 10:55, Laura Lambert, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Ready, ZrC#7 target description
|
Wednesday, June 03, 2015, 10:53
Total length packed = 12.3cm
See attachment for target description. |
Monday, July 06, 2015, 12:18, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-1, , Failed, ZrC#7 target description
|
Laura Lambert wrote:
Wednesday, June 03, 2015, 10:53 |
Tuesday, July 07, 2015, 13:00, John Wong, ZrC#7, LP-SIS, ITW, TM2, 41177-2, , Ready, ZrC#7 (backup1) target description
|
Tuesday, July 07, 2015, 12:36
Total no. discs = 422
Total packed length = 13.2 cm (measured after the sintering process) |
Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description
|
Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.
Note: Target container was coated/sintered with TaC twice. Would like to see if this will improve the life-span of the target. |
Thursday, September 10, 2015, 13:33, Laura Lambert, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description
|
Thursday, September 10, 2015, 13:31
Ta#46 HP-SIS target description:
Total Ta foils = 505 |
Thursday, September 24, 2015, 13:42, Laura Lambert, SiC#32, HP-FEBIAD, , , 39530-5, , Ready, SiC#32 target description
|
Thursday, September 24, 2015, 11:46
See attachment for target description.
|
Wednesday, September 30, 2015, 17:08, John Wong, Ta # 46, HP-SIS, , , 41369-3, , Ready, Ta#46 target description
|
Laura Lambert wrote:
Thursday, September 10, 2015, 13:31 |
Monday, October 26, 2015, 16:33, Laura Lambert, UCx#14, LP-SIS, , , 41077-5, , Ready, UCx#14 Target Description
|
Monday, October 26, 2015, 16:23
Attached please find the UCx#14 target description.
Note: This is the first UCx target using the new LP-SIS small center block design. |
Friday, March 04, 2016, 14:57, Laura Lambert, UCx#15, LP-SIS, ITW, , 41077-1, , Ready, UCx#15 Target Description
|
Friday, March 04, 2016, 14:56
Attached please find the UCx#15 target description.
Note: This is the second UCx target using the new LP-SIS small center block design. |
Friday, March 11, 2016, 10:18, Laura Lambert, Ta # 47, , ITE, TM4, , , Spent, Ta # 47 target desscription
|
Friday, March 11, 2016, 10:13
Ta#47 LP-SIS [new small center block] target description:
Total Ta foils = 470 |
Tuesday, April 19, 2016, 11:33, Laura Lambert, Ta # 48, HP-SIS, , , 41369-5, , Ready, Ta # 48 target description
|
Tuesday, April 19, 2016, 11:24
Ta#48 HP-SIS target description:
Total Ta foils = 505 |
Wednesday, June 08, 2016, 15:55, Laura Lambert, UCx#16, LP-IG-LIS, , , 40860-2, , Ready, UCx#16 Target Description
|
Wednesday, June 08, 2016, 15:52
Attached please find the UCx#16 target description.
|
Wednesday, June 29, 2016, 11:49, Laura Lambert, SiC # 33, HP-SIS, , , 41369-4, , Ready, SiC#33 target description
|
Wednesday, June 29, 2016, 11:47
See attachment for target description.
|
Tuesday, August 02, 2016, 15:28, Laura Lambert, UCx#17, LP-SIS, , , 41790-3, , Ready, UCx#17 Target Description
|
Tuesday, August 02, 2016, 15:27
Attached please find the UCx#17 target description.
|
Tuesday, August 02, 2016, 15:42, Laura Lambert, Ta # 49, HP-SIS, , , 41369-6, , Ready, Ta#49 target description
|
Tuesday, August 02, 2016, 15:30
Ta#49 HP-SIS target description:
Total Ta foils = 500 [6x20 packs + 380 single discs] |
Friday, September 02, 2016, 14:45, John Wong, SiC#34, LP-IG-LIS, , , 39814-V2-1, , Ready, SiC#34 Target Description
|
Friday, September 02, 2016, 14:43
See attachment for target description
|
Friday, October 07, 2016, 16:27, John Wong, SiC#35, HP-FEBIAD, , , 39530-9, , Ready, SiC35 Target description
|
Friday, October 07, 2016, 16:28
See attachment for the target description
|
Tuesday, October 18, 2016, 12:06, Laura Lambert, Ta#50, LP-SIS, , , 41790-5, , Ready, Ta#50 target description
|
Tuesday, October 18, 2016, 10:12
Ta#50 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Friday, October 21, 2016, 13:47, Laura Lambert, UCx#18, LP-SIS, , , 41790-6, , Ready, UCx#18 Target Description
|
Friday, October 21, 2016, 13:46
Attached please find the UCx#18 target description.
|
Tuesday, March 07, 2017, 10:00, Laura Lambert, UCx#19, LP-SIS, , TM4, 42218-12, , Ready, UCx#19 Target Description
|
Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.
|
Wednesday, March 08, 2017, 15:42, Laura Lambert, Ta#51, LP-SIS, , TM2, 41790-4, , In progress, Ta#51 target description
|
Wednesday, March 08, 2017, 15:40
Ta#51 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description
|
Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.
|
Tuesday, May 30, 2017, 15:15, Laura Lambert, SiC#36, HP-FEBIAD-CTL, , TM2, 41369-10, , Ready, SiC#36 target description
|
Tuesday, May 30, 2017, 15:12
See attachment for target description.
|
Wednesday, May 31, 2017, 09:53, Laura Lambert, Ta# 52, LP-SIS, , TM4, 42218-14, , In progress, Ta#52 target description
|
Wednesday, May 31, 2017, 09:51
Ta#52 LP-SIS target description:
Total Ta foils = 400 [4x20 packs + 320 single discs] |
Monday, June 26, 2017, 13:36, Laura Lambert, Ta #53, HP-SIS, , TM2, 42218-6, , Ready, Ta#53 target description
|
Monday, June 26, 2017, 13:32
Ta#53 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Thursday, July 06, 2017, 15:36, Anders Mjos, Ta#55, LP-SIS, , , 42218-11, , Ready, Ta#55 target description
|
Target loaded by Matt yesterday
320 foils = 33.7832 g
4 x 20 packs = 9.1170 g |
Monday, August 21, 2017, 11:13, Laura Lambert, UCx#21, LP-SIS, , , 42218-15, , Ready, UCx#21 Target Description
|
Monday, August 21, 2017, 11:09
Attached please find the UCx#21 target description.
|
Tuesday, September 26, 2017, 12:07, Laura Lambert, Ta#54, HP-SIS, ITW, TM2, 42218-10, , Ready, Ta#54 target description
|
Tuesday, September 26, 2017, 09:31
Ta#54 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description
|
Wednesday, September 27, 2017, 09:13
See attachment for target description.
|
Monday, April 16, 2018, 09:55, Laura Lambert, UCx#22, LP-SIS, , , 42218-13, , Ready, UCx#22 Target Description
|
Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target description.
|
Thursday, June 21, 2018, 11:34, Aaron Schmidt, Ta#56, HP-SIS, , , 42218-9, , Ready, Ta#56 target description
|
Thursday, June 21, 2018, 11:33:
Ta#56 HP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description
|
Friday, July 13, 2018, 14:40
Target is ready for installation.
See attachment for description |
Monday, August 27, 2018, 17:11, John Wong, UCx#24, LP-SIS, , , , , Ready, UCx#24 Target Description
|
Monday, August 27, 2018, 17:09
See attachment for UCx#24 target description
|
Monday, September 17, 2018, 11:39, John Wong, np-SiC#1, LP-SIS, , , 43044-1, , Ready, nano-SiC#1 Target description
|
Monday, September 17, 2018, 11:32
See attachment for the target description.
Some notes about the target conditioning in Evap#2 (see elog ID#414): |
Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description
|
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.
|
Monday, October 15, 2018, 07:36, Aaron Schmidt, Ta#57, , ITE, TM4, 41177-3, , , Ta#57 Target Description.
|
(Laura Lambert: Evap 2 Elog ID: 404) Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides] |
Thursday, November 29, 2018, 14:23, Marla Cervantes, UCx#26, LP-IG-LIS, , , 42281-3, , Ready, UCx#26 Target description
|
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description.
|
Monday, July 22, 2019, 16:33, Marla Cervantes, UCx#27, LP-SIS, , , 49044-9, , Ready, UCx#27 Target Description
|
Monday, July 22, 2019, 16:31
Attached please find the UCx#27 target description. |
Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description
|
Tuesday, July 30, 2019, 15:50
See attachment for details |
Tuesday, September 17, 2019, 08:47, Aaron Schmidt, Ta#59, LP-SIS, , TM2, 44062-5, , In progress, Ta#59 Target description
|
Tuesday, September 17, 2019, 08:44:
Ta#59 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Wednesday, October 02, 2019, 11:18, Marla Cervantes, UCx#28, LP-SIS, , , 44062-4, , Ready, UCx #28 Target description
|
Wednesday, October 02, 2019, 11:17
Attached please find the UCx#28 target description. |
Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description
|
Friday, October 11, 2019, 09:25
See attached picture for description.
|
Monday, October 21, 2019, 12:38, Darwin Ortiz Rosales, UCx#29, LP-SIS, , , 44062-6 , , Ready, UCx29-target_description
|
|
Tuesday, November 19, 2019, 12:20, Darwin Ortiz Rosales, UCx#30, LP-SIS, , , 44062-3 , , Ready, UCx30-target_description
|
|
Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description
|
Friday, December 06, 2019, 15:34
Added SEM images (see attachment#2) - JW
|
Thursday, February 20, 2020, 08:11, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, , Ready, Ta#60 Target Description
|
Thursday, February 20, 2020, 08:07:
Ta#60 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Wednesday, April 15, 2020, 08:10, Darwin Ortiz Rosales, SiC#40, HP-SIS, , , 42218-8, , Ready, Target SiC#40 Description
|
Wednesday, April 15, 2020, 07:51
See attached picture for description |
Thursday, June 04, 2020, 15:00, Marla Cervantes, C#1, LP-SIS, , , 43044-8, , In progress, Target C#1 Description
|
Thursday, June 04, 2020, 15:00
See attached picture for description |
Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description
|
Tuesday, September 29, 2020, 11:49
See attached picture for description |
Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description
|
Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description
|
Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Thursday, April 08, 2021, 09:54, Aaron Schmidt, Ta#62, LP-SIS, , , 44139-10, , Ready, Ta#62 target description
|
Ta#62 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Wednesday, June 09, 2021, 11:45, Darwin Ortiz Rosales, UCx#33, LP-SIS, , , 44139-12, , Ready, UCx#33-Target_description
|
Cartridge with discs was further heated in EVAP1 (eLog 271 Evaporator 1). |
Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2)
|
Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Monday, September 13, 2021, 14:53, Darwin Ortiz Rosales, SiC#41, HP-SIS, , , 42218-7, , Ready, Target SiC#41 Description
|
Monday, September 13, 2021, 14:52
|
Tuesday, September 21, 2021, 21:08, Darwin Ortiz Rosales, C#3, LP-SIS, , , 44691-7, , Ready, Target C #3 Description
|
Tuesday, September 21, 2021, 21:09
See attached file for target description. |
Wednesday, September 29, 2021, 10:37, Darwin Ortiz Rosales, UCx#35, LP-IG-LIS, , , 42218-5, , Ready, UCx#35-Target_description
|
|
Monday, November 08, 2021, 11:30, Darwin Ortiz Rosales, UCx#36, LP-SIS, , , 44691-1, , Ready, UCx#36_Target_Description
|
|
Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63
|
Ta#63 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm |
Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description
|
Wednesday, May 25, 2022, 10:15
|
Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description
|
Thursday, June 02, 2022, 16:54:
Ta#64 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Monday, June 20, 2022, 10:35, Darwin Ortiz Rosales, SiC#43, HP-FEBIAD, , , 42464-1, , Ready, Target SiC#43 Description
|
Monday, June 20, 2022, 10:33
|
Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues
|
While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from
the module.
The multipin shoulder bolts were removed and then the multipin was able to be pried off. |
Friday, July 15, 2022, 10:47, Darwin Ortiz Rosales, UCx#38, LP-SIS, , , 44508-3, , Ready, UCx#38_Target_Description
|
The bulk density was corrected. Use attachment number 2.
Darwin |
Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description
|
|
Tuesday, August 16, 2022, 09:48, Darwin Ortiz Rosales, SiC#44, HP-FEBIAD, , , 37978-1, , Ready, Target SiC#44 Description
|
Tuesday, August 16, 2022, 09:47
|
Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description
|
Thursday, September 22, 2022, 13:17 |
Tuesday, October 25, 2022, 13:10, Darwin Ortiz Rosales, UCx#40, LP-SIS, , , 45550-2, , Ready, UCx#40 Target Description
|
Tuesday, October 25, 2022, 13:10
Target in Glovebox |
Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,
|
|
Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description
|
Graphite target |
Monday, February 06, 2023, 10:02, Darwin Ortiz Rosales, C#6, , , , 45220-6, , Ready, Target C#6 Description
|
|
Monday, March 06, 2023, 13:38, Aaron Schmidt, Ta#65, LP-SIS, , , 45220-7, , Ready, Ta#65 Target Description.
|
Monday, March 06, 2023, 13:38:
Ta#65 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Friday, March 10, 2023, 07:21, Aaron Schmidt, , , , , , , Ready, Target Material Batch - Ta
|
Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013" |
Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description
|
|
Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description
|
|
Friday, May 26, 2023, 11:53, Darwin Ortiz Rosales, SiC#45, HP-SIS, , , 44692-3, , Ready,
|
|
Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description.
|
Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001") |
Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description
|
|
Wednesday, July 26, 2023, 12:03, Darwin Ortiz Rosales, UCx#43, LP-SIS, , , 45447-11, , Ready, UCx#43_Description
|
|
Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description
|
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001") |
Wednesday, September 20, 2023, 14:25, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, , In progress, Ta#66 Target description.
|
Ta#66 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. |
Thursday, October 05, 2023, 12:48, Aaron Schmidt, , LP-SIS, , , 45220-3, , , Ta#( ) Target description. (Spare)
|
Ta# LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.033mm (0.0013") avg Measured. |
Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description
|
Three Ta heatshields left installed on container. |
Tuesday, March 05, 2024, 10:15, Aaron Schmidt, Ta, LP-SIS, , , 45447-15, , Ready, Ta# (March stock) Target Description.
|
Tuesday, March 05, 2024, 10:12: Ta#
(Stock - Loaded today) LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs] |
Wednesday, May 22, 2024, 22:32, Darwin Ortiz Rosales, UCx#45, LP-SIS, , , 45220-9, , Ready, UCx#45_Description
|
|
Tuesday, September 03, 2024, 16:11, Darwin Ortiz Rosales, TiC#8, HP-FEBIAD, , , 45447-2, , Ready, TiC#8_Description
|
This was back-up target |
Tuesday, November 12, 2024, 12:49, Darwin Ortiz Rosales, UCx#46, LP-IG-LIS, , , 42218-2, , Ready, UCx#46_Description
|
|
Thursday, January 02, 2025, 12:54, Darwin Ortiz Rosales, UCx#47, LP-SIS, , , 45447-12, , Ready, UCx#47_Description
|
|
|