ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
980
|
Monday, September 25, 2023, 16:31 |
Aaron Schmidt | Ta#66 | LP-SIS | ITW | TM2 | 45220-5 | 45235-9 | Done | Conditioning Ta#66 & HV Tests. | Thermocouples installed on the left end
plate x 2.
Monday, September 25, 2023, 16:23: |
|
982
|
Tuesday, October 10, 2023, 15:46 |
Aaron Schmidt | Ta#68 (Spare) | LP-SIS | | | 45220-3 | 45235-11 | In progress | Conditioning Ta#68 (Spare) | Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on. |
|
983
|
Wednesday, October 18, 2023, 15:43 |
Aaron Schmidt | | LP-SIS | | | 45447-12 | 45235-17 | In progress | Conditioning UC#43 (empty) w/ gas line | Thermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line |
|
984
|
Monday, October 30, 2023, 16:01 |
Aaron Schmidt | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, October 30, 2023, 16:00
Roughing
Tuesday, October 31, 2023, |
|
985
|
Thursday, November 16, 2023, 09:43 |
Aaron Schmidt | | LP-SIS | | | | | In progress | Thermal tests | Aurelia has been testing on the ISAC TS
since last week. Thermocouples are installed
in the end cap, left side & the ionizer. |
|
986
|
Monday, November 27, 2023, 16:09 |
Ferran Boix Pamies | | LP-SIS | | | 45220-2 | 45235-13 | In progress | HV power surge test plus mass scans | Monday, November 27, 2023, 16:09
Roughing
Monday, November 27, 2023, 17:22 |
|
991
|
Thursday, January 18, 2024, 10:49 |
Aaron Schmidt | | LP-SIS | | | 44139-2 | 45235-22 | In progress | Conditioning UCx HS | Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32: |
|
992
|
Monday, January 22, 2024, 13:55 |
Aaron Schmidt | | LP-SIS | | | 45447-19 | 45235-22 | In progress | Conditioning UCx HS - 2 | Conditioning HS for UCx. LP-SIS oven /
end caps installed
Monday, January 22, 2024, 13:53: |
|
1000
|
Thursday, April 04, 2024, 10:38 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | Mass marker testing | Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed. |
|
1006
|
Wednesday, April 24, 2024, 16:21 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | | | Wednesday, April 24, 2024, 16:20:
Target assembly installed.
Wednesday, April 24, 2024, 16:20: |
|
1008
|
Thursday, May 02, 2024, 13:45 |
Dave Neilson | - | LP-SIS | | | 44691-8 | 45235-26 | In progress | Mass marker testing | Wednesday, May 01, 2024, 12:44:
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: |
|
1012
|
Tuesday, July 23, 2024, 09:43 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | mass marker - reservoir testing | Wednesday, July 22, 2024, 11:41 -
target installed
Wednesday, July 22, 2024, 13:31 - |
|
1014
|
Thursday, July 25, 2024, 14:26 |
Dave Neilson | Ta#67 Thin foil | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Conditioning Ta#67 Thin foil | Thursday, July 25, 2024, 14:25 -
competing electrical checks prior to test
stand installation |
|
1015
|
Monday, July 29, 2024, 23:02 |
Aurelia Laxdal | Ta#67 Thin foils | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Cooldown for removing the V wires | 22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. |
|
1018
|
Friday, August 09, 2024, 21:08 |
Ferran Boix Pamies | Ta#67 Thin foils | LP-SIS | ITE | TM4 | 45447-14 | 45235-10 | In progress | Ta#67 thin foil retesting | Friday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does |
|
1022
|
Friday, September 20, 2024, 14:22 |
Aaron Schmidt | Ta# | LP-SIS | ITE | TM2 | 45447-18 | 45235-13 | | Conditioning Ta# | https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: |
|
1029
|
Wednesday, November 13, 2024, 14:36 |
Aaron Schmidt | UC#(47) - Not included | LP-SIS | ITE | TM3 | 44691-8 | 45235-24 | In progress | Conditioning UC#47 (Assembly only) | Gas line is attached.
Wednesday, November 13, 2024, 14:18:
Roughing. |
|
510
|
Wednesday, June 01, 2016, 10:02 |
Aaron Schmidt | UC#16 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | | | Conditioning Heat shield for UC#16 | Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44: |
|
537
|
Friday, September 02, 2016, 15:47 |
Aaron Schmidt | SiC#34 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | 41751-9 | | Conditioning SiC# 34 | Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM |
|
581
|
Thursday, May 04, 2017, 13:49 |
Aaron Schmidt | UC#20 | LP-IG-LIS | | | | | | Conditioning Heat shield for UC#20 (1) | Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos
on. |
|
|