Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 7 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  394   Friday, July 18, 2014, 11:30 Anders MjosUC#10LP-SISITETM440282-540316-1DoneUC#10 Heat Shield ConditioningFriday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos
  
  402   Friday, August 29, 2014, 14:52 Anders MjosTa#44HP-SISITETM438817-940316-11DoneConditioning Ta#44Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting
turbos.
  
  431   Monday, March 16, 2015, 18:53 Anders MjosTa#45HP-SISITETM438817-5 In progressConditioning Ta#45 Monday, March 16, 2015, 18:53: Started
turbos
Monday, March 16, 2015, 19:00: Turbos
 Ta#45_Test_Stand.docxTa#45_2015-03-17_Mar_17_2015_09-05-31_AM.ana 
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioningEE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing
 Ta#46.docx 
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  510   Wednesday, June 01, 2016, 10:02 Aaron SchmidtUC#16LP-IG-LISITETM439814-V2-1  Conditioning Heat shield for UC#16Wednesday, June 01, 2016, 10:02: Begin
roughing.
Wednesday, June 01, 2016, 10:44:
 OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlpTS-2016-06-02_UC#16.rgaTS-2016-06-02-13-46_UC#16.rgaUC#16.docx 
  537   Friday, September 02, 2016, 15:47 Aaron SchmidtSiC#34LP-IG-LISITETM439814-V2-141751-9 Conditioning SiC# 34Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM
 ER-580-270-m40.txtITE-TM4-SiC#34-LP-IG-LIS_Test_Stand.docxSiC#34.docxTS-2016-09-06-08-12.rga 
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  607   Friday, October 06, 2017, 12:14 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12:
 9x 
  610   Friday, October 13, 2017, 15:53 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37 (ii)Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49:
 10x 
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  671   Tuesday, July 03, 2018, 12:46 Aaron SchmidtTa#56HP-SISITETM442218-942752-3In progressConditioning Ta#56Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo
pumps started.
 8x 
  675   Monday, July 23, 2018, 14:25 Aaron SchmidtUC#23LP-FEBIAD-CTLITETM2  In progressConditioning Heat Shield for UC#23Monday, July 23, 2018, 14:20: Roughing.
Monday, July 23, 2018, 14:54: Turbo
pumps on. 
 UC#23_emit.dat_error.docxTS-2018-07-2-08-07.rgaTS-2018-07-24-07-20.rgaUC#23.docx 
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  
  684   Wednesday, September 12, 2018, 11:19 Aaron SchmidtTa#57LP-SISITETM441177-342752-6In progressConditioning Ta#57Wednesday, September 12, 2018, 11:06: Roughing.
Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52:
 9x 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  719   Friday, April 26, 2019, 13:45 Aaron SchmidtTa#58LP-SISITETM243044-442972-7In progressConditioning Ta#58 HSFriday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo
pumps on.
 7x 
  721   Tuesday, May 07, 2019, 13:16 Aaron SchmidtTa#58LP-SISITETM243044-4 In progress9-pin connection configuration (Using Ta#58)Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin
 HV_Tests_2019_-_AL_-_1.docxTS-2019-05-08-08-12.rgaTS-2019-05-08-14-20.rga 
  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HSTuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on.
 ZrC#8.docxTS-2019-05-14-11-05.rgaTS-2019-05-16-07-30.rgaTS-2019-05-21-07-10.rgaITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx 
ELOG V2.9.2-2455