Thursday, July 25, 2024, 14:26, Dave Neilson, Ta#67 Thin foil , LP-SIS, ITE, TM3, 45447-14, 45235-10, , Conditioning Ta#67 Thin foil
|
Thursday, July 25, 2024, 14:25 - competing electrical checks prior to test stand installation
Thursday, July 25, 2024, 17:07 - after target installation test stand roughed down, turbo pumps then turned on. vacuuming overnight
Friday, July 26, 2024, 09:01 - water cooling turned on, while monitoring vacuum level (~1.5e-6T). No affect on vacuum.
Friday, July 26, 2024, 09:32 - began increasing TGHT TBHT. increased to 230A/230A at 1A/30s
Friday, July 26, 2024, 10:22 - closed cage and increased BIAS to 30kV to ensure a lack of sparks - additional risk of sparking due to the multipin wires connected to TGHT and TBHT at the target terminals.
Friday, July 26, 2024, 11:04 - decreased BIAS to 0V. Then opening cage to allow access to reading voltage across TG and TB at target
Friday, July 26, 2024, 11:29 - reached 230/230 A. TG TB measurements taken at this point.
Friday, July 26, 2024, 12:05 - increasing TGHT at 1A/30s to 250A
Friday, July 26, 2024, 12:13 - TGHT at 250A for measurement
Friday, July 26, 2024, 12:29 - increasing TGHT to 300A at 1A/30s
Friday, July 26, 2024, 12:55 - TGHT at 300A for measurement
Friday, July 26, 2024, 13:08 - TGHT increasing at 1A/30s to 350A
Friday, July 26, 2024, 13:36 TGHT at 350 A for measurement
Friday, July 26, 2024, 13:43 TGHT increasing at 1A/30s to 400A
Friday, July 26, 2024, 14:10 TGHT at 400A for measurement
Friday, July 26, 2024, 14:17 TGHT increasing at 1A/30s
Friday, July 26, 2024, 14:43 TGHT at 450A for measurement
Friday, July 26, 2024, 14:53 TGHT increasing at 1A/30s
Friday, July 26, 2024, 15:20 TGHT at 500A for measurement
Friday, July 26, 2024, 15:28 TGHT increasing at 1A/30s
Friday, July 26, 2024, 19:14 FBP: we couldn't get a great mass scan with the provided tune from Dave, we might be doing something wrong. Mass scan saved and plotted here.
Friday, July 26, 2024, 19:16 FBP: Target will be cooled down today before the weekend.
Monday, July 29, 2024, 09:50 TGHT/TBHT ramping up to 580/230 A 1A/30s
Monday, July 29, 2024, 15:30: ramping up, relatively frequent sparking beginning at 24kV. Ramped down. (also noticed that internal test wires were shaking due to high voltage bias)
Monday, July 29, 2024, 15:49 HV at 20kV waiting for stabilization
Monday, July 29, 2024, 15:58 after a five minute period of stability, beginning to increase bias in 100V increments.
Monday, July 29, 2024, 17:35 sparking is too frequent (decided at 24kV) to warrant attempting to condition HV up to 30kV. must determine the cause of this sparking. thus cooling target overnight. will remove internal wires and reheat.
Tuesday, July 30, 2024, 08:32 after cooling, test stand was vented, wires removed, and subsequently pumped down.
now beginning TGHT TBHT ramp to 580 230 at 1A/30s
Tuesday, July 30, 2024, 10:02 during TGHT TBHT ramp, HV was slowly increased to 35kV to assess high voltage stability. Throughout, and at 35kV, there were no sparks seen at all.
Tuesday, July 30, 2024, 13:50 target at 580 230. increasing bias.
Tuesday, July 30, 2024, 14:45 at ~24kV, the bias is sparking approximately every 4 minutes.
Tuesday, July 30, 2024, 17:28 When sparks slowed, bias was increased, but ultimately the sparking behaviour persisted. The bias was then dropped down to 0 and TGHT TBHT cooled at -1A/30s to 0A for target removal tomorrow.
|
Monday, September 25, 2023, 16:31, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, 45235-9, Done, Conditioning Ta#66 & HV Tests.
|
Thermocouples installed on the left end plate x 2.
Monday, September 25, 2023, 16:23: Roughing.
Monday, September 25, 2023, 16:51: TP1B on.
Monday, September 25, 2023, 16:56: Waterline FS#5 open. Vacuum ok.
Monday, September 25, 2023, 16:58: Power on. TP1A on.
Tuesday, September 26, 2023, 09:44: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:11: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:12: IV4 opened.
Tuesday, September 26, 2023, 16:45: Optics on/set. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TC @ 47 / 51 C
Tuesday, September 26, 2023, 21:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Spark @ 28 kV.
Tuesday, September 26, 2023, 21:41: Mass & wire scans taken. Masses from 110 to 160? Curious.
Wednesday, September 27, 2023, 08:24: TC @ 71 / 79 C.
Wednesday, September 27, 2023, 11:57: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, September 27, 2023, 12:06: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Spark right after.
Wednesday, September 27, 2023, 12:23: Recovered computer & epics controls from previous spark.
Wednesday, September 27, 2023, 12:36: BIAS / EE / EZL @ 45 / -2.3 / 19 kV. Spark @ 44.5 kV.
Wednesday, September 27, 2023, 13:17: Large spark *
Wednesday, September 27, 2023, 13:21: Closed IV4. Reset TSG:TP1B. TMS:TP6 Spinning up? Did not reset right away. Reset optics. Epics & Firefox on the TS computer are down.
Wednesday, September 27, 2023, 13:26: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Plus 1 spark while tapping the HV down. TMS:TP6 has recovered.
Wednesday, September 27, 2023, 14:01: HV to 0 kV. TS computer is disconnected from the network but epics is still running.
Wednesday, September 27, 2023, 14:05: TC @ 69.8 / 81 C
Thursday, September 28, 2023, 09:23: TS computer is running again. Continue HV tests.
Thursday, September 28, 2023, 09:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 28, 2023, 09:47: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, September 28, 2023, 10:43: No sparks thus far.
Thursday, September 28, 2023, 10:46: BIAS / EE / EZL @ 45 / -2.3 / 19 kV.
Thursday, September 28, 2023, 10:50: Gauge for FEBIAD gases is "buzzing".
Thursday, September 28, 2023, 10:52: BIAS / EE / EZL @ 47.5 / -2.5 / 20 kV.
Thursday, September 28, 2023, 11:35: No sparks occurred. BIAS / EE / EZL @ 0 kV.
Thursday, September 28, 2023, 11:41: PS off. IV4 closed.
Thursday, September 28, 2023, 11:42: IG1 off. Turbo pumps off.
Thursday, September 28, 2023, 12:35: Venting.
|
Tuesday, May 16, 2023, 14:00, Aaron Schmidt, Ta#65, LP-SIS, ITE, TM4, 45220-7, 45235-2, In progress, Conditioning Ta#65
|
Calibrated window installed on the beam line.
Tuesday, May 16, 2023, 13:45: Roughing both the chamber & beam line.
Tuesday, May 16, 2023, 14:00: TMS:TP6 on.
Tuesday, May 16, 2023, 14:04: TMS:TP2 on.
Tuesday, May 16, 2023, 14:13: IG6 on.
Tuesday, May 16, 2023, 14:17: TSG:TP1B on.
Tuesday, May 16, 2023, 14:23: TSG:TP1A on.
Tuesday, May 16, 2023, 14:33: IG1 on.
Tuesday, May 23, 2023, 07:30: Waterline FS#5 open. Vacuum stable @ 2.78e-07T
Tuesday, May 23, 2023, 07:32: Power / Sources on.
Tuesday, May 23, 2023, 07:35: Auto-ramping TGHT / TBHT to 230 A / 230 A @ 2 A per min. IV4 open.
Tuesday, May 23, 2023, 07:38: Optics are set.
Tuesday, May 23, 2023, 11:38: Auto-ramping TGHT to 300 A @ 2 A per minute.
Tuesday, May 23, 2023, 12:32: Auto-ramping TGHT to 350 A @ 2 A per minute.
Tuesday, May 23, 2023, 13:13: Auto-ramping TGHT to 400 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:00: Auto-ramping TGHT to 450 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:50: Auto-ramping TGHT to 500 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:07: Auto-ramping TGHT to 550 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:51: Auto-ramping TGHT to 580 A @ 2 A per minute.
Tuesday, May 23, 2023, 17:35: TGHT at 580A with TBHT at 230A.
Tuesday, May 23, 2023, 21:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Begin wire & mass scans.
Tuesday, May 23, 2023, 22:03: Mass & wire scans complete.
Tuesday, May 23, 2023, 22:09: BIAS / EE / EZL @ 0 kV.
Wednesday, May 24, 2023, 13:48: Auto-ramping TGHT to 550 A and TBHT to 200A @ 2 A per minute.
Currently at TGHT to 500 A and TBHT to 150A. 15:44 pm
Wednesday, May 24, 2023, 15:44: Auto-ramping TGHT to 450 A and TBHT to 100A @ 2 A per minute.
Wednesday, May 24, 2023, 17:22: Auto-ramping TGHT to 400 A and TBHT to 50A @ 2 A per minute.
Thursday, May 25, 2023, 07:49: TGHT / TBHT @ 0A (Reached before midnight - But not logged). IV4 closed.
Thursday, May 25, 2023, 09:04: Power / Sources off.
Thursday, May 25, 2023, 09:06: IG1 off. TP1B & TP1A off.
|
Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
|
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on.
Wednesday, June 08, 2022, 10:13: TP1B up to speed. TP1A on.
Wednesday, June 08, 2022, 10:21: TP1A up to speed. IG1 on.
Wednesday, June 08, 2022, 13:06: Waterline FS#5 Open. Vacuum @ 3.32-e06T.
Wednesday, June 08, 2022, 13:22: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Wednesday, June 08, 2022, 13:26: One spark*.
Wednesday, June 08, 2022, 13:32: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, June 08, 2022, 13:33: Spark*
Wednesday, June 08, 2022, 13:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Wednesday, June 08, 2022, 13:42: Spark*. Outside the cage (EE) Feedthrough (K) Between a hex edge & one of the resistors on a plastic plate.
Wednesday, June 08, 2022, 13:50: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Wednesday, June 08, 2022, 14:18: We are back. Spark tripped the computer & shut it off while tapping up the HV. BIAS / EE / EZL @ 48.3 / 2.4 / 20 kV.
Wednesday, June 08, 2022, 14:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV.
Wednesday, June 08, 2022, 14:45: Spark* In the cage.
Wednesday, June 08, 2022, 14:57: Spark* In the cage.
Wednesday, June 08, 2022, 15:19: No sparks have occurred off the thermocouples. Begin tapping down the HV.
Wednesday, June 08, 2022, 15:29: HV off. TGHT / TBHT Check @ 5 / 5 A OK.
Wednesday, June 08, 2022, 15:31: IV4 open.
Thursday, June 09, 2022, 05:14: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, June 09, 2022, 08:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Thursday, June 09, 2022, 08:22: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min
Thursday, June 09, 2022, 08:29: Optics set. Standard tune.
Thursday, June 09, 2022, 10:22: Beginning wire & mass scans.
Thursday, June 09, 2022, 10:30: Adjust TSG:CB1 (ok)
Thursday, June 09, 2022, 11:40: Mass & wire scans complete. Tune set to standard. HV tests begin. BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, June 09, 2022, 11:45: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, June 09, 2022, 13:01: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Thursday, June 09, 2022, 13:13: Small spark* Outside the chamber, but in the cage.
Thursday, June 09, 2022, 13:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. (One spark during the tap up. In the cage)
Thursday, June 09, 2022, 14:03: Small spark, barely audible.
Thursday, June 09, 2022, 14:11: Large spark in the cage* Computer was shut off. Got it back around 14:16
Thursday, June 09, 2022, 14:20: Reset steering, optics, IG6.
Thursday, June 09, 2022, 14:28: Begin tapping down HV
Thursday, June 09, 2022, 14:34: HV to 0.
Thursday, June 09, 2022, 14:36: Closed IV4. (Reset w/ screwdriver)
Friday, June 10, 2022, 09:58: Auto-Cooling @ 2 A per min.
Monday, June 13, 2022, 10:16: IG1 off. Turbo pumps off. |
Friday, November 12, 2021, 13:01, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, 44378-12, In progress, Conditioning Ta#63
|
Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on.
Friday, November 12, 2021, 13:42: TP1A on.
Friday, November 12, 2021, 13:50 : IG1 on. TMS:TP2 trip. Fast reset. OK. Vacuum @ 3.54e-05T. Waterline FS#5 open.
Friday, November 12, 2021, 13:53: Vacuum @ 2.12e-05T. Ok
Friday, November 12, 2021, 13:54: Power / sources on.
Monday, November 15, 2021, 09:00: Auto-ramping TGHT / TBHT to 350 / 150 @ 3 A per min. IV4 open. TMS:VCB1 not functioning. Controls group notified.
Monday, November 15, 2021, 09:40: Optics set minus TMS:VCB1
Monday, November 15, 2021, 11:16: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Monday, November 15, 2021, 11:34: TMS:VCB1 fixed. Optics set ok.
Monday, November 15, 2021, 11:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 15, 2021, 15:44: Mass & wire scans complete. OK. HV to 0 kV. IV4 closed.
Tuesday, November 16, 2021, 06:16: Auto-cooling TGHT / TBHT @ 2A per min.
Tuesday, November 16, 2021, 11:13: Power / sources off.
Tuesday, November 16, 2021, 11:14: IG1. Turbo pumps off.
Tuesday, November 16, 2021, 12:12: Venting. |
Friday, October 16, 2020, 11:33, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, 43515-1, In progress, Conditioning Ta#61
|
Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39: TP1B on.
Friday, October 16, 2020, 12:29: TP1A on.
Monday, October 19, 2020, 07:59: Waterlines opened. Vacuum ok @ 6.20e-07T
Monday, October 19, 2020, 08:01: Power / Sources on.
Monday, October 19, 2020, 08:02: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Monday, October 19, 2020, 08:03: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.43 |
5.86 |
TBHT |
23.34 |
8.52
|
COIL + EE |
23.36 |
2.65 |
TGHT |
23.27 |
6.45 |
Monday, October 19, 2020, 08:09: Optics on / set.
Monday, October 19, 2020, 08:16: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, October 19, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, October 19, 2020, 15:50: Initial wire scans were good. MB1 requires a polarity reversal
Monday, October 19, 2020, 16:00: Auto-cooling TGHT / TBHT to 300 / 10 A @ 1 A per min. Stop manually.
Monday, October 19, 2020, 18:11: TBHT @ 100 A halt. Auto-cooling TGHT to 300 @ 1 A per min. Stop manually.
Monday, October 19, 2020, 19:16: TGHT @ 300 A halt.
Tuesday, October 20, 2020, 06:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, October 20, 2020, 09:30: HV off. IV4 closed. Switching MB1 polarity.
Tuesday, October 20, 2020, 13:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. MB1 on
Tuesday, October 20, 2020, 14:10: Mass scans working
Tuesday, October 20, 2020, 14:17:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.64 |
5.87 |
TBHT |
24.29 |
8.76
|
COIL + EE |
24.07 |
2.71 |
TGHT |
24.25 |
6.54 |
Tuesday, October 20, 2020, 15:15: IV4 opened.
Thursday, October 22, 2020, 11:35: HV to 0 kV.
Thursday, October 22, 2020, 11:36: Auto-cooling @ 1 A per min.
Monday, October 26, 2020, 11:40: IV4 closed / reset
Monday, October 26, 2020, 11:41: PS off.
Monday, October 26, 2020, 11:42: IG1 / Turbo pumps off. Purging waterlines.
Monday, October 26, 2020, 13:00: Venting. |
Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60
|
Tuesday, June 16, 2020, 11:01: Turbo pumps on.
Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.
Wednesday, June 17, 2020, 07:51: Power / Sources on.
Wednesday, June 17, 2020, 07:52: Opened IV4.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.89 |
6.17 |
TBHT |
27.73 |
8.71
|
COIL + EE |
27.66 |
2.82 |
TGHT |
27.74 |
6.68 |
Wednesday, June 17, 2020, 07:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 4 A per min. Optics on.
Wednesday, June 17, 2020, 08:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, June 17, 2020, 09:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
12:50 Approx TRIP*. Vacuum spike?
Wednesday, June 17, 2020, 13:10: Sources back on. Auto-ramping TGHT / TBHT to 450 / 150 A @ 4 A per min. Optics switched back on.
Wednesday, June 17, 2020, 13:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, June 17, 2020, 15:25: Auto-ramping TGHT / TBHT to 500 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 15:48: Auto-ramping TGHT / TBHT to 525 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 16:14: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.
Wednesday, June 17, 2020, 17:03: Scans complete
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.28 |
8.11 |
TBHT |
27.92 |
10.78
|
COIL + EE |
27.75 |
3.76 |
TGHT |
27.92 |
7.57 |
Wednesday, June 17, 2020, 17:09: TGHT brought down to 550 A. BIAS / EE / EZL @ 0 kV.
Wednesday, June 17, 2020, 17:10: IV4 closed
Wednesday, June 17, 2020, 17:13: TBHT to 200 A.
Wednesday, June 17, 2020, 22:25: TSG:CG1A & TSG:CG1B leveling off. Reducing ~ On the strip tool.
Thursday, June 18, 2020, 05:32: From 550 A / 200 A. Vacuum @ 5.63e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min. Max loop reached (5.500e-06T). Allow to out gas.
Sunday, June 21, 2020, 11:07: Auto-cooling @ 0.5 A per min. vacuum @ 4.29e-06T.
Monday, June 22, 2020, 04:51: Auto-cooling @ 4 A per min. vacuum @ 1.49e-06T.
Monday, June 22, 2020, 05:10: Sources / power off.
Monday, June 22, 2020, 05:13: Ion gauge & Turbo pumps off.
Monday, June 22, 2020, 06:46: Venting. HS waterline purged. |
Monday, September 23, 2019, 13:30, Aaron Schmidt, Ta#59, LP-SIS, ITE, TM2, 44062-5, 42752-10, In progress, Conditioning Ta#59 Assy 9x
|
Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.
Monday, September 23, 2019, 14:20: Turbo pumps started.
Monday, September 23, 2019, 14:27: Ion gauge on.
Tuesday, September 24, 2019, 08:04: RGA on.
Tuesday, September 24, 2019, 08:07: Waterlines opened. No response on RGA. Vacuum ok @ 1.52e-06T.
Tuesday, September 24, 2019, 08:12: Power / sources on.
Tuesday, September 24, 2019, 08:16: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Tuesday, September 24, 2019, 08:19: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Tuesday, September 24, 2019, 08:20: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.33 |
5.00 |
TBHT |
28.19 |
7.75
|
COIL + EE |
28.08 |
2.13 |
TGHT |
28.18 |
6.15 |
Tuesday, September 24, 2019, 08:28: BIAS / EE / EZL @ 27 / -1.5 / 13 kV. Spark*
Tuesday, September 24, 2019, 08:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 09:07: Optics set.
Tuesday, September 24, 2019, 10:45: Clusters of sparks noted. Especially around 10:20.
Tuesday, September 24, 2019, 10:58: RGA reset.
Tuesday, September 24, 2019, 11:05 Sparks ongoing. spaced from 1 minutes apart to 15 minutes apart. The TBHT insulator is glowing blue on the left right side again.
Tuesday, September 24, 2019, 11:06: Abort Target heating.
Tuesday, September 24, 2019, 11:12: BIAS to 23 KV. Blue glow less pronounced / almost gone.
Tuesday, September 24, 2019, 11:15: BIAS to 30 KV. Blue glow remains.
Tuesday, September 24, 2019, 11:31: Continue auto-ramping @ 2A per min.
Tuesday, September 24, 2019, 11:39. HV off.
Tuesday, September 24, 2019, 11:49: Halt ramp. Auto-cooling @ 4 A per min.
Remove loose wiring / connection from 9-pin area in the back. Ground other loose connections.
Tuesday, September 24, 2019, 13:28: Auto-ramping TGHT / TBHT to 250 / 200 A @ 4A per min.
Tuesday, September 24, 2019, 13:31: HV sources on. Optics on.
Tuesday, September 24, 2019, 13:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 24, 2019, 14:32: Auto-ramping TGHT to 280 A @ 4A per min.
Tuesday, September 24, 2019, 14:40: TGHT / TBHT @ 280 / 200 A.
EPICS issues* ? Won't open at the ISAC TS computer.
Wednesday, September 25, 2019, 07:30: Auto-ramping TGHT to 350 A @ 2 A per min.
Wednesday, September 25, 2019, 07:44: EPICS Error at my desk as well. Able to restart it and continue ramping.
Wednesday, September 25, 2019, 07:56: EPICS Issue ongoing. Halted ramping @ 290 A on TGHT.
Wednesday, September 25, 2019, 10:44: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 25, 2019, 11:57: FM: Sparks have been occurring for the past 20 min with a rate approx of 0.5/min. The TBHT insulator is again showing a glowing blue. I managed to saw one spark flashing up the TBHT insulator.
Wednesday, September 25, 2019, 12:59: RGA restarted.
Wednesday, September 25, 2019, 13:36: Spark* knocked out TSG:CB1 during RPM6A wire scan. Controls notified.
Wednesday, September 25, 2019, 14:45: After investigation with controls, replacement of the control board to TSG:CB1 likely req'd.
Thursday, September 26, 2019, 06:30: HV off. Prep to remove control board for TSG:CB1.
Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced. https://elog.triumf.ca/TIS/Test-Stand/759
Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.
Thursday, September 26, 2019, 11:36: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 26, 2019, 12:31: Mass, wire, & emittance scans successful
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.23 |
7.59 |
TBHT |
26.86 |
10.02
|
COIL + EE |
26.65 |
3.27 |
TGHT |
26.89 |
7.29 |
Thursday, September 26, 2019, 12:33: Auto-cooling to TGHT / TBHT to 530 / 180 @ 4A per min.
Thursday, September 26, 2019, 12:45: TGHT / TBHT @ 530 / 180A. Hold*
Thursday, September 26, 2019, 13:17: No Sparks*. Auto-cooling to TGHT / to 500 @ 4A per min.
Thursday, September 26, 2019, 13:25: No Sparks*. FC0 'in'.
Thursday, September 26, 2019, 13:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Thursday, September 26, 2019, 14:28: Auto-cooling @ 2A per min.
Friday, September 27, 2019, 07:17: HV off.
Friday, September 27, 2019, 07:19: RGA off
Friday, September 27, 2019, 07:21: Close & reset IV4.
Friday, September 27, 2019, 07:23: Power / Sources off. Ion gauge & Turbo pumps off.
Friday, September 27, 2019, 10:29: Venting. Waterlines purged. |
Friday, April 26, 2019, 13:45, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, In progress, Conditioning Ta#58 HS 7x
|
Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo pumps on.
Friday, April 26, 2019, 14:58: RGA on.
Monday, May 06, 2019, 07:05: RGA restarted.
Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.
Monday, May 06, 2019, 07:16: Power / sources on.
Monday, May 06, 2019, 07:20: Optics set.
Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.
Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.
Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.8 |
5.52 |
TBHT |
25.7 |
7.93
|
COIL + EE |
25.6 |
1.92 |
TGHT |
25.70 |
6.29 |
Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.
Monday, May 06, 2019, 09:47: RGA restarted. Updates?
RGA timed out around 10:30.
Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.
Monday, May 06, 2019, 11:27: RGA restarted.
Monday, May 06, 2019, 13:10: EZL to 14.3 kV
Monday, May 06, 2019, 14:48 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.4 |
7.78 |
TBHT |
27.0 |
10.30
|
COIL + EE |
26.8 |
3.01 |
TGHT |
27.1 |
7.09 |
Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.
Element |
Mass |
Mass/q |
Beam Current |
Lithium |
6.941 |
7.508 |
1.04401e-10 |
Sodium |
22.9897 |
27.556 |
9.85687e-10 |
Mass 27 (Al) |
26.9815 |
32.2943 |
2.97834e-08 |
Potassium |
39.0983 |
46.3293 |
7.49146e-10 |
|
(peak 2) |
47.6191 |
1.568e-10 |
Rubidium |
85.4678 |
100.355 |
2.79327e-10 |
|
(peak 2) |
102.904 |
1.04431e-10 |
Cesium |
132.9055 |
156.6 |
8.6103e-10 |
|
(peak 2) |
162.532 |
2.4408e-10 |
The discrepancy appears to get larger the further we move along the masses.
Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.
Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.
Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.
Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.
Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.
Tuesday, May 07, 2019, 12:54: Turbo pumps off.
Tuesday, May 07, 2019, 14:00: Venting. |
Wednesday, September 12, 2018, 11:19, Aaron Schmidt, Ta#57, LP-SIS, ITE, TM4, 41177-3, 42752-6, In progress, Conditioning Ta#57 9x
|
Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.
Wednesday, September 12, 2018, 11:52: Turbo pumps started.
Wednesday, September 12, 2018, 12:40: Ion gauge on.
Thursday, September 13, 2018, 07:30: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T
Thursday, September 13, 2018, 07:33: Power/sources on.
Thursday, September 13, 2018, 07:37: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min
Thursday, September 13, 2018, 07:42: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Thursday, September 13, 2018, 07:43: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
4.02 |
TBHT |
24.4 |
3.10 |
COIL + EE |
24.4 |
5.13 |
TGHT |
24.6 |
5.77 |
Thursday, September 13, 2018, 07:44: Optics set.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Thursday, September 13, 2018, 13:56: Vacuum @ 9.97e-07T.
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
24.6 |
3.13 |
COIL + EE |
24.4 |
5.16 |
TGHT |
26.5 |
5.82 |
Friday, September 14, 2018, 09:55:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.99 |
TBHT |
24.6 |
3.11 |
COIL + EE |
24.6 |
5.12 |
TGHT |
26.5 |
5.83 |
Friday, September 14, 2018, 14:41: Auto-cooling @ 2 A per min.
Monday, September 17, 2018, 09:15: HV to 0. RGA off, IV4 closed & reset
Monday, September 17, 2018, 09:20: Sources off. Turbo pumps & Ion gauge off. Power off.
Monday, September 17, 2018, 09:23: Waterlines purged.
|
Tuesday, July 03, 2018, 12:46, Aaron Schmidt, Ta#56, HP-SIS, ITE, TM4, 42218-9, 42752-3, In progress, Conditioning Ta#56 8x
|
Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo pumps started.
Tuesday, July 03, 2018, 13:38: Ion gauge on.
Wednesday, July 04, 2018, 06:57: Waterlines opened. Vacuum ok @ 1.08e-06T. No response on RGA.
Wednesday, July 04, 2018, 06:59: Power/sources on
Wednesday, July 04, 2018, 07:00: Vacuum not yet low enough to begin ramping.
Wednesday, July 04, 2018, 07:10: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, July 05, 2018, 06:29: Note* TMS:IG6 has higher than usual vacuum @ 9.22e-07T. Typically below 6.0e-07T.
Thursday, July 05, 2018, 06:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, July 05, 2018, 06:31: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.5 |
3.90 |
TBHT |
24.7 |
3.06 |
COIL + EE |
24.7 |
4.97 |
TGHT |
24.9 |
5.61 |
Thursday, July 05, 2018, 06:35: Optics set.
Thursday, July 05, 2018, 11:23: Auto ramping TBHT to 230 A @ 2A per min.
Thursday, July 05, 2018, 11:34: Auto ramp aborted on TBHT @ 221 A. Read back is at 230.3 A.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
32.9 |
3.82 |
TBHT |
28.0 |
3.13 |
COIL + EE |
24.7 |
4.97 |
TGHT |
24.9 |
5.61 |
Thursday, July 05, 2018, 14:32: RGA froze. Restart
Friday, July 06, 2018, 08:24: Spark noted. RGA restarted.
Friday, July 06, 2018, 14:05: Auto-cooling @ 2A/min
Monday, July 09, 2018, 07:50: Power/sources brought to 0. Turned off.
Monday, July 09, 2018, 07:52: RGA off. IV4 closed (reset).
Monday, July 09, 2018, 07:56: Ion gauge, Turbo pumps off.
Monday, July 09, 2018, 07:58: Waterlines purged.
Monday, July 09, 2018, 09:19: Venting. |
Wednesday, September 20, 2017, 14:11, Aaron Schmidt, Ta#54, HP-SIS, ITW, TM2, 42218-10, , In progress, Conditioning Ta#54 6x
|
Wednesday, September 20, 2017, 14:08: Roughing.
Wednesday, September 20, 2017, 14:28: Turbos on.
Wednesday, September 20, 2017, 14:33: Ion gauge on.
Wednesday, September 20, 2017, 14:39: RGA on.
Thursday, September 21, 2017, 08:43: Waterlines opened. No response on RGA. Vacuum ok @ 1.7e-07T
Thursday, September 21, 2017, 08:49: Power/sources on.
Thursday, September 21, 2017, 09:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Thursday, September 21, 2017, 09:04: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.1 |
3.85 |
TBHT |
25.4 |
3.04 |
COIL + EE |
24.9 |
4.94 |
TGHT |
25.1 |
5.59 |
Thursday, September 21, 2017, 09:08: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, September 22, 2017, 13:42: Bias / EZL increased to 40 / 17.3 kV. Tune accordingly.
Mass scan ok
Friday, September 22, 2017, 14:33: Bias / EZL decreased to 30 / 13 kV. Tune accordingly.
Friday, September 22, 2017, 14:39: Auto-cooling @ 2A / min
Monday, September 25, 2017, 10:20: BIAS / EZL / EE @ 0 V.
Monday, September 25, 2017, 10:21:Power/sources off.
Monday, September 25, 2017, 10:32: RGA off. IV4 closed
Monday, September 25, 2017, 10:33: Ion gauge, turbos off.
Monday, September 25, 2017, 10:37: Waterlines purged.
Monday, September 25, 2017, 13:19: Venting. |
Friday, June 30, 2017, 13:31, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53
|
Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo pumps on.
Friday, June 30, 2017, 14:31: Ion gauge on.
Tuesday, July 04, 2017, 07:47: Waterlines opened. No response on RGA. Vacuum @1.35e-07T.
Tuesday, July 04, 2017, 07:51: Power/sources on.
Tuesday, July 04, 2017, 08:01: BIAS / EZL / EE @ 20 / 13 / 1.5 kV .
Tuesday, July 04, 2017, 08:02: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.2 |
3.78 |
TBHT |
26.1 |
2.99 |
COIL + EE |
25.8 |
4.87 |
TGHT |
26.0 |
5.48 |
***Halted to bring in spare target for Ta#52.***
Thursday, July 06, 2017, 09:20: Power/sources off
Thursday, July 06, 2017, 09:24: IV4 closed. Timeout error. Fixed. RGA off
Thursday, July 06, 2017, 09:27: Waterlines purged.
Thursday, July 06, 2017, 09:29: Ion gauge off. Turbos off.
Thursday, July 06, 2017, 13:14: Venting.
***Halted to bring in spare target for Ta#52.*** |
Monday, July 10, 2017, 13:27, Aaron Schmidt, Ta#53, HP-SIS, ITW, TM2, 42218-6, 41751-6, In progress, Conditioning Ta#53 7x
|
Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo pumps started.
Monday, July 10, 2017, 14:33: Ion gauge on.
Monday, July 10, 2017, 14:36: RGA on.
Tuesday, July 11, 2017, 06:52: Waterlines opened. No response on RGA. Vacuum ok @ 2.18e-07T
Tuesday, July 11, 2017, 06:56: Power/sources on.
Tuesday, July 11, 2017, 07:03: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, July 11, 2017, 07:04: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.1 |
3.78 |
TBHT |
27.0 |
2.95 |
COIL + EE |
26.9 |
4.87 |
TGHT |
27.1 |
5.48 |
Tuesday, July 11, 2017, 07:10: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, July 11, 2017, 10:10: RGA error (Spark?). Restarted.
Tuesday, July 11, 2017, 15:08: Anode brought up to 5, 10 15, and 50 V using FEBIAD controls. No Current detected.
Wednesday, July 12, 2017, 08:23:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.2 |
3.85 |
TBHT |
27.5 |
2.98 |
COIL + EE |
27.2 |
4.87 |
TGHT |
29.5 |
5.48 |
Wednesday, July 12, 2017, 14:42: Auto-cooling.
Friday, July 14, 2017, 12:13: Sources off. IV4 Closed (Reset)
Monday, July 17, 2017, 07:55: Power off.
Monday, July 17, 2017, 07:57: Waterlines purged.
Monday, July 17, 2017, 07:59: RGA off. Ion gauge & Turbos off.
Monday, July 17, 2017, 09:43: Venting. |
Friday, June 09, 2017, 13:28, Aaron Schmidt, Ta#52, LP-SIS, ITE, TM4, 42218-14, 41751-8, In progress, Conditioning Ta#52 8x
|
Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo pumps on.
Friday, June 09, 2017, 14:16: Ion gauge on.
Monday, June 12, 2017, 07:20: Waterlines opened. No response on RGA. Vacuum @1.52e-07T.
Monday, June 12, 2017, 07:23: Power/Sources on.
Monday, June 12, 2017, 08:15: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, June 12, 2017, 08:16: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.0 |
3.78 |
TBHT |
27.3 |
3.03 |
COIL + EE |
25.8 |
4.91 |
TGHT |
26.0 |
5.46 |
Monday, June 12, 2017, 08:18: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Monday, June 12, 2017, 11:33: Spark around 10:30 tripped RGA. Restarting RGA.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.9 |
3.78 |
TBHT |
26.6 |
2.95 |
COIL + EE |
26.1 |
4.89 |
TGHT |
28.4 |
5.46 |
Tuesday, June 13, 2017, 14:50: Auto-cooling @ 2A per min
Wednesday, June 14, 2017, 07:41: Sources/power off. IV4 closed
Friday, June 16, 2017, 07:16: RGA off
Friday, June 16, 2017, 07:18: Ion gauge & turbo pumps off.
Friday, June 16, 2017, 07:20: Water lines purged.
Monday, June 19, 2017, 13:35: While writing report, it was noticed a step was skipped on the mass correlations. The MassCorr data was not saved. - AS |
Friday, March 24, 2017, 14:43, Aaron Schmidt, Ta#51, LP-SIS, ITW, TM2, 41790-4, 41751-5, In progress, Conditioning Ta#51 9x
|
Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo pumps on.
Friday, March 24, 2017, 16:04: Ion gauge on.
Friday, March 24, 2017, 16:07: RGA on. Turbo pumps @ speed.
Monday, March 27, 2017, 09:07: Water lines opened. No response on RGA. Vacuum @ 1.81e-07T
Monday, March 27, 2017, 09:10: Power on.
Monday, March 27, 2017, 09:50: Troubleshooting: Sources/Optics non-responsive. Controls group notified.
Monday, March 27, 2017, 11:16: Optics all green minus the magnet TMS : MB1. PLC issue reported.
Monday, March 27, 2017, 11:30: PLC reboot. Brief whiteout on screens. Screen function returned. TMS : MB1 still interlocked.
Monday, March 27, 2017, 14:30: TMS : MB1 no longer interlocked. Optics non-responsive to 'P/S On'. Voltages can be adjust while optics are 'in black'
Tuesday, March 28, 2017, 09:30: Optics still have error but can be run.
Tuesday, March 28, 2017, 09:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV . Spark noted while bring up BIAS.
Tuesday, March 28, 2017, 09:45: IV4 opened.
Tuesday, March 28, 2017, 11:13: RGA Fatal error. Restarted 11:15.
Tuesday, March 28, 2017, 12:57: Optics ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.89 |
TBHT |
27.3 |
3.00 |
COIL + EE |
27.1 |
4.94 |
TGHT |
27.1 |
5.59 |
Tuesday, March 28, 2017, 13:01: Auto ramping TGHT / TBHT to 300 / 100 A @ 2A per min.
Tuesday, March 28, 2017, 15:52: TGHT / TBHT @ 300 / 100. Vacuum @ 2.16e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.5 |
3.85 |
TBHT |
26.7 |
3.12 |
COIL + EE |
25.8 |
4.92 |
TGHT |
26.5 |
5.59 |
Wednesday, March 29, 2017, 08:25: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, March 29, 2017, 11:23: TMS : MB1 set from 'Reverse' to 'Normal' manually. Interlock Reset. (Mass Scan ok).
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
36.9 |
3.82 |
TBHT |
27.2 |
3.07 |
COIL + EE |
27.4 |
4.97 |
TGHT |
29.4 |
5.58 |
Wednesday, March 29, 2017, 13:09: Auto ramping TBHT to 220 A @ 2A per min.
Wednesday, March 29, 2017, 13:20: Source page @ 218.9A - Read back on power supply @ 219A. Fatal Error on RGA.
Wednesday, March 29, 2017, 13:27: Manually ramp TBHT to 230 A @ 2A per min (approx).
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.
Wednesday, March 29, 2017, 15:28: Auto cooling TBHT to 220 A @ 2A per min.
Thursday, March 30, 2017, 08:42: Auto-cooling @ 2A per min.
Friday, March 31, 2017, 08:35: IV4 closed.
Friday, March 31, 2017, 08:44: Power/sources off.
Friday, March 31, 2017, 08:46: Ion gauge, Turbos off. Waterlines purged.
Thursday, April 06, 2017, 10:40: Venting |
Tuesday, October 18, 2016, 13:29, Aaron Schmidt, Ta#50, LP-SIS, ITE, TM4, 41790-5, 41751-1, In progress, Conditioning Ta#50 9x
|
Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46: Turbo pumps started.
Tuesday, October 18, 2016, 13:52: Ion gauge on.
Tuesday, October 18, 2016, 13:54: Both turbo pumps at speed.
Tuesday, October 18, 2016, 15:05: RGA on.
Wednesday, October 19, 2016, 08:46: Power/Sources on
Wednesday, October 19, 2016, 08:49: Waterline opened. No response on RGA. Vacuum stable @4.40E-7T
Wednesday, October 19, 2016, 08:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Wednesday, October 19, 2016, 08:58 : IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.9 |
3.90 |
TBHT |
27.7 |
3.06 |
COIL + EE |
27.6 |
5.08 |
TGHT |
27.7 |
5.70 |
Wednesday, October 19, 2016, 09:01: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, October 19, 2016, 11:50: TMS:FC0 moved out & TMS:RPM0B began scanning continuously on their own. Monitor.
Wednesday, October 19, 2016, 14:45: RGA Restarted.
Wednesday, October 19, 2016, 15:25: RGA Restarted (Unable to save 14:45 Startup)
Friday, October 21, 2016, 13:27: Auto Cooling @ 2A per min
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
37.3 |
3.92 |
TBHT |
28.2 |
3.07 |
COIL + EE |
27.9 |
5.07 |
TGHT |
29.8 |
5.62 |
Friday, October 21, 2016, 15:39: IV4 Closed
Monday, October 24, 2016, 09:10:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.1 |
3.95 |
TBHT |
28.2 |
3.10 |
COIL + EE |
27.7 |
5.04 |
TGHT |
27.7 |
5.70 |
Monday, October 24, 2016, 09:10: Power/Sources off.
Monday, October 24, 2016, 09:20: Water lines purged.
Monday, October 24, 2016, 09:21: RGA off.
Monday, October 24, 2016, 09:23: Ion gauge & Turbo pumps off
Monday, October 24, 2016, 12:54: Venting. |
Wednesday, August 03, 2016, 13:47, Aaron Schmidt, Ta#49, HP-SIS, ITW, TM2, , 41751-10, , Conditioning Ta#49 7x
|
Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17: Turbo pumps started.
Wednesday, August 03, 2016, 14:22: Ion gauge on.
Thursday, August 04, 2016, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 2.96E-7T
Thursday, August 04, 2016, 08:20: Power/Sources on.
Thursday, August 04, 2016, 08:30: BIAS/EZL/EE @ 30/ 13/ 1.5 kV .
Thursday, August 04, 2016, 08:35: IV4 open. Auto ramping TGHT/TBHT to 580/200 A @ 2A/1A per min.
Thursday, August 04, 2016, 15:06:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.3 |
3.85 |
TBHT |
28.8 |
3.00 |
COIL + EE |
27.6 |
4.89 |
TGHT |
29.6 |
5.50 |
Friday, August 05, 2016, 10:12: RGA lost connection. Restarting.
Friday, August 05, 2016, 13:25: Graham Waters contacted. Constant voltage on emittance rig power supply. 10V? Spark from a while ago? Unable to scan.
Friday, August 05, 2016, 14:13: Auto cooling TGHT/TBHT @ 2A/1A per min.
Friday, August 05, 2016, 16:02: BIAS/ EZL/ EE @ 0/ 0/ 0 kV. Cooling continued.
Monday, August 08, 2016, 08:22 : RGA off. IV4 Closed.
Monday, August 08, 2016, 08:23: Turbo pumps off.
Monday, August 08, 2016, 08:26: Waterlines purged. Power off.
Monday, August 08, 2016, 09:27: Venting.
|
Thursday, April 21, 2016, 14:26, Aaron Schmidt, Ta#48, HP-SIS, ITW, TM2, 41369-5, 41120-5, In progress, Conditioning Ta#48
|
Thursday, April 21, 2016, 14:25: Begin pumping down.
Thursday, April 21, 2016, 15:02: Turbo pumps started.
Thursday, April 21, 2016, 15:34: Ion gauge on.
Thursday, April 21, 2016, 15:43: RGA on
Friday, April 22, 2016, 08:30: Opened water supply for heat shield. Vacuum stable at 2.4E-7 T. No response on RGA.
Friday, April 22, 2016, 08:44: Anode breaker switched on. While off, a charge was measured via TSH:ANODE:RDCUR.
Monday, April 25, 2016, 08:08: Noticed Turbo pump 1 shut down around roughly 4 pm Sunday afternoon. Will attempt restart.
Monday, April 25, 2016, 08:15: Interlocks bypassed for TP1, Pump Restarted.
Monday, April 25, 2016, 08:23: TP1 @ speed. Vacuum recovered to 1.9E-7 T
Monday, April 25, 2016, 08:41: IV4 opened. Auto ramping TGHT/TBHT to 400A/150A @ 2A/min.
Monday, April 25, 2016, 08:42: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV
Monday, April 25, 2016, 13:40: Mass scan (test)
Monday, April 25, 2016, 14:04: Ramp down TGHT to 350A @ 2A/min.
Tuesday, April 26, 2016, 08:10: Auto ramping TGHT/TBHT to 580A/220A @ 2A/min.
Tuesday, April 26, 2016, 14:10: Auto ramping TBHT to 230A @ 2A/min.
Tuesday, April 26, 2016, 14:10: Ramp Down TBHT to 220A @ 2A/min.
Wednesday, April 27, 2016, 07:55: Auto ramp down TGHT/TBHT @ 2A/min to 0A.
Wednesday, April 27, 2016, 12:56: Ramp down Complete. Sources and optics off. IV4 Closed
Thursday, April 28, 2016, 08:52
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.02 |
TBHT |
28.6 |
3.16 |
COIL + EE |
28.3 |
5.22 |
TGHT |
28.7 |
5.75 |
Monday, May 02, 2016, 13:32: Ion gauge off. Turbo pumps off.
Monday, May 02, 2016, 15:03: Water supply closed.
Monday, May 02, 2016, 15:11: Venting |
Wednesday, March 30, 2016, 16:32, Aaron Schmidt, Ta#47, LP-SIS, ITE, TM4, 41790-1, 41120-05, In progress, Conditioning Ta#47
|
Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34 : Turbos started -AM
Wednesday, March 30, 2016, 18:50: Turbos at speed. Vacuum at 1.8E-6 T -AM
Thursday, March 31, 2016, 08:39: Opened water supply for heat shield. Vacuum stable at 3.2E-7 T. No response on RGA.
Thursday, March 31, 2016, 08:48: Started heating Target. TGHT to 500A, TBHT to 170A @ 2/1 A/min.
Thursday, March 31, 2016, 09:07: Opened IV4. BIAS/EZL/EE to 30/13/1.5 kV
Friday, April 01, 2016, 17:53: Ramping down TGHT/TBHT -AM
Monday, April 04, 2016, 08:32: Source off. Closed IV4. Stopped the Turbo pumps.
Monday, April 04, 2016, 09:49: Venting. |
|