ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  1000   Thursday, April 04, 2024, 10:38 Dave Neilson LP-SIS  44691-845235-26DoneMass marker testing Thursday, April 04, 2024, 09:49:
Target inserted yesterday, April 3. mass
marker tube connections carefully confirmed.
  
  1006   Wednesday, April 24, 2024, 16:21 Dave Neilson LP-SIS  44691-845235-26   Wednesday, April 24, 2024, 16:20: 
   Target assembly installed.
Wednesday, April 24, 2024, 16:20: 
  
  1008   Thursday, May 02, 2024, 13:45 Dave Neilson-LP-SIS  44691-845235-26In progressMass marker testing Wednesday, May 01, 2024, 12:44: 
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: 
  
  1012   Tuesday, July 23, 2024, 09:43 Dave Neilson LP-SIS  44691-845235-26Donemass marker - reservoir testingWednesday, July 22, 2024, 11:41  -
target installed
Wednesday, July 22, 2024, 13:31 -
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 
  899   Tuesday, September 14, 2021, 17:12 Aaron SchmidtC#3LP-SISITWTM244691-744378-11In progressC#3 ConditioningTuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37:
TP1B on.
 6x 
  882   Friday, June 25, 2021, 11:18 Aaron SchmidtTa#62LP-SISITETM444691-444378-4DoneTa#62 Conditioning - NewReplacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
 Ta#62_44691-4_Conditioning_-_R.docxTa#62_44691-4_Conditioning..docxITE-TM4-Ta#62-LP-SIS_Test_Stand.docx 
  940   Tuesday, September 27, 2022, 07:55 Aaron SchmidtC#4LP-SISITETM444691-344378-23In progressConditioning C#4 w/ thermocouplesThermocouples attached on 5 X 5 multi-pin:
O - O
O - X
 C#4_Conditioning_-_HV_test.docxER-580-230-30kV-m7.txtER-580-230-30kV-m39.txtER-580-230-30kV-m134.txt 
  955   Thursday, January 12, 2023, 09:04 Aaron Schmidt LP-SIS  44691-1444378-20In progress Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L):
  
  931   Wednesday, June 08, 2022, 10:01 Aaron SchmidtTa#64LP-SISITETM444691-1244378-13In progressConditioning Ta#64 & HV Test.Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing.
 7x 
  906   Friday, November 12, 2021, 13:01 Aaron SchmidtTa#63LP-SISITETM444691-1144378-12In progressConditioning Ta#63Friday, November 12, 2021, 13:01: BV1B
open. Roughing.
Friday, November 12, 2021, 13:05:
 Ta#63.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m131.txt 
  817   Tuesday, October 27, 2020, 08:54 Aaron SchmidtNb#9 LP-SISITWTM244508-243515-4In progressNb#9 ConditioningTuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on.
 Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt 
  819   Friday, November 06, 2020, 12:53 Aaron SchmidtNb#9LP-SISITWTM244508-243515-4In progressConditioning Nb#9 w/ P/S Target & BracketAttached end plate parasitic / symbiotic
target & PEEK assembly bracket.
Friday, November 06, 2020, 12:24:
 7x 
  816   Friday, October 16, 2020, 11:33 Aaron SchmidtTa#61LP-SISITETM444508-143515-1In progressConditioning Ta#61Friday, October 16, 2020, 11:11: Roughing.
Friday, October 16, 2020, 11:39:
TP1B on.
 Ta#61.docxITE-TM4-Ta#61-LP-SIS_Test_Stand.docxER-580-230-30kV-M133.txtER-580-230-30kV-M28.txt 
  801   Monday, July 20, 2020, 11:40 Aaron Schmidt(Empty-Test)   44160-143822-2In progressConditioning Test P2NSalts added: 
Cs - 15 uL
Li - 10 uL
 P2N_-_1_-_July-20-22-2020.docx 
  814   Wednesday, September 30, 2020, 06:23 Aaron SchmidtC#2LP-SISITWTM244139-943515-2In progressConditioning C#2Wednesday, September 30, 2020, 06:14: Power
/ sources on.
Wednesday, September 30, 2020, 06:17:
 C#2_-_Short_-_EZL.docxC#2_Conditioning.docxITW-TM2-C#2-LP-SIS_Test_Stand.docx 
  991   Thursday, January 18, 2024, 10:49 Aaron Schmidt LP-SIS  44139-245235-22In progressConditioning UCx HS Straight/closed TGHT tube oven installed.
SIS Assembly.
Thursday, January 18, 2024, 10:32:
  
  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing.
 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx 
  787   Monday, March 02, 2020, 14:42 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressFull TS testing w/ HV using Ta#60Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on.
  
  789   Wednesday, March 11, 2020, 13:31 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing - 2Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30:
 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx 