  Test-Stand, Page 29 of 53  Not logged in ELOG logo
Entry  Tuesday, December 13, 2022, 16:12, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Test - 2 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx

Thermocouples installed (X):

O - O

O - Anode

O - X

O - X

O - O

Megger check ok. Thermocouples checked with a heat gun ok.

Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL on the center block. Edge fins exposed.

Tuesday, December 13, 2022, 16:10: Roughing.

Tuesday, December 13, 2022, 16:40: TP1 B on.

Tuesday, December 13, 2022, 16:49: TP1 A on.

Tuesday, December 13, 2022, 16:58: IG1 on Vacuum @ 7.00e-05T & dropping.


Wednesday, December 14, 2022, 06:49: Waterline FS#5 opened. Vacuum @ 2.42e-06T.

Wednesday, December 14, 2022, 06:53: Power / Sources / Optics on.

Wednesday, December 14, 2022, 06:54: BIAS / EE / EZL / Anode to 1 / 0.5 1 / 0.1 kV.

Wednesday, December 14, 2022, 06:59: TGHT / TBHT / Coil @ 10 A.

Wednesday, December 14, 2022, 07:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, December 14, 2022, 07:21: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. 

Wednesday, December 14, 2022, 07:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Wednesday, December 14, 2022, 07:47: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.

Wednesday, December 14, 2022, 07:49: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min

Wednesday, December 14, 2022, 07:52: IV4 open.

Wednesday, December 14, 2022, 08:01: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:05: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:49 : Auto-ramping TGHT & TBHT to 200 A & 100 A @ 2A er min

Wednesday, December 14, 2022, 10:49 :Auto-ramping TGHT & TBHT to 220 A & 120 A @ 2A er min

Wednesday, December 14, 2022, 11:05 :Auto-ramping TGHT & TBHT to 240 A & 140 A @ 2A er min

Wednesday, December 14, 2022, 11:19 :Auto-ramping TGHT & TBHT to 260 A & 160 A @ 2A er min

Wednesday, December 14, 2022, 11:33 :Auto-ramping TGHT & TBHT to 280 A & 180 A @ 2A er min

Wednesday, December 14, 2022, 11:48 :Auto-ramping TGHT & TBHT to 300 A & 200 A @ 2A er min

Wednesday, December 14, 2022, 12:05 :Auto-ramping TGHT & TBHT to 320 A & 220 A @ 2A er min

Wednesday, December 14, 2022, 12:29: Auto-ramping TGHT & TBHT to 340 A & 240 A @ 2A er min

Wednesday, December 14, 2022, 13:08 : Auto-ramping TGHT & TBHT to 360 A & 260 A @ 2A er min

Wednesday, December 14, 2022, 13:14 : Pyrometer reading shows up after adjustment in focussing

Wednesday, December 14, 2022, 13:22 : Auto-ramping TGHT & TBHT to 380 A & 270 A @ 2A er min

Wednesday, December 14, 2022, 13:35 : Auto-ramping TGHT to 400 A @ 2A per min

Wednesday, December 14, 2022, 13:49: Auto-ramping TGHT to 420 A @ 2 A per min.

Wednesday, December 14, 2022, 14:01: Auto-ramping TGHT to 440 A @ 2 A per min.

Wednesday, December 14, 2022, 14:16: Auto-ramping TGHT to 460 A @ 2 A per min.

Wednesday, December 14, 2022, 14:31: Auto-ramping TGHT to 480 A @ 2 A per min.

Wednesday, December 14, 2022, 14:44: Auto-ramping TGHT to 500 A @ 2 A per min.

Wednesday, December 14, 2022, 14:56: Auto-ramping TGHT to 520 A @ 2 A per min.

Wednesday, December 14, 2022, 15:08: Auto-ramping TGHT to 540 A @ 2 A per min.

Wednesday, December 14, 2022, 15:21: Auto-ramping TGHT to 560 A @ 2 A per min.

Wednesday, December 14, 2022, 15:35 : Auto-ramping TGHT & TBHT to 580 A & 290 A @ 2A er min

Wednesday, December 14, 2022, 16:08 : Auto-ramping TGHT to 600 A @ 2 A per min.

Thursday, December 15, 2022, 10:00 : Auto-ramping TBHT to 300 A @ 2 A per min.

Thursday, December 15, 2022, 13:19 : Auto-ramping TBHT to 330 A @ 2 A per min.

Thursday, December 15, 2022, 14:25 : Increased anode voltage to 400 V.

Thursday, December 15, 2022, 14:50: Reducing TGHT & TBHT to 0 A @ 2 A per min.

Thursday, December 15, 2022, 14:59 : Ramped down anode voltage to 0 V & coil current to 0 A.


Friday, December 16, 2022, 06:59: IV4 & power off. 

Friday, December 16, 2022, 07:01: IG1 off. Turbo pumps off.

Friday, December 16, 2022, 08:15: Venting.

 

 

Entry  Friday, December 16, 2022, 10:32, Aaron Schmidt, , HP-FEBIAD-CTL, , , 43104-2, 45235-12, In progress, New anode routed FEBIAD Test - 3 

Thermocouples installed (X):

O - O

O - Anode

O - X

O - X

O - O

Same set up as test 2 other than a proper gas line connection was made.

Friday, December 16, 2022, 10:29: Roughing.

Friday, December 16, 2022, 14:46: TP1B on. 

Friday, December 16, 2022, 14:52: TP1A on.

Friday, December 16, 2022, 14:59: IG1 on. Vacuum @ 2.58e-05T & dropping.

 

 

Entry  Thursday, January 12, 2023, 09:04, Aaron Schmidt, , LP-SIS, , , 44691-14, 44378-20, In progress,  

Test for Aurelia L. Empty LP-SIS w/ end caps in. Right side expanded.

Thermocouples installed (R - L):

X & Y For the (V) checks.

Y - Y

X - O

X - R

L - R

L - O

Datalogger:  R= T1 & L=T2

X = TGHT

Y = TBHT

O = Not in use.

Thursday, January 12, 2023, 09:06: Beamline side roughed down & TP on sometime last night. Vacuum @ 2.77e-06T.

Connect volt meters to 4,5 (TBHT) & 6,7 (TGHT)

Thursday, January 12, 2023, 09:43: IG1 Bypass made. TGHT / TBHT at 10 A. Volt meter check. Both display in negatives.

Thursday, January 12, 2023, 09:54: Swapped wires around for both TGHT / TBHT volt meters. OK. Breaker / PS off. Bypass removed.

Thursday, January 12, 2023, 10:14: Roughing.

Thursday, January 12, 2023, 10:16: BV1A open.


Monday, January 16, 2023, 10:25: Sources off. IV4 closed. Turbo pumps off.

Entry  Monday, January 16, 2023, 16:02, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , In progress, HP-FEBIAD tests 

Extra wraps of foil around the center block (6) + 3 full wraps around the shield.

Monday, January 16, 2023, 15:40: Roughing.

Monday, January 16, 2023, 16:10: TP1B on.

Monday, January 16, 2023, 16:17: TP1A on.

Monday, January 16, 2023, 16:32: Bypass on BV1A/BV1B used to undo TP1A trip. IG1 on & TP up to speed now.


Tuesday, January 17, 2023, 09:35: TMS:RP2 is failing. Beamline side roughing pump.

Tuesday, January 17, 2023, 09:35: Waterline FS#5 is open. Chamber side vacuum @ 1.14e-06T.

Tuesday, January 17, 2023, 09:46: TMS:TP6 & TMS TP2 off. PV2 shut. TMS RP2 off.

Tuesday, January 17, 2023, 12:46: Manually tapped up TGHT / TBHT to 10 A. 100 V on Anode. ok.

Tuesday, January 17, 2023, 12:47: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min.

Tuesday, January 17, 2023, 13:00: Auto-ramping TGHT / TBHT to 100 / 100 A @ 2 A per min.

Tuesday, January 17, 2023, 13:47 : Ramping TGHT/TBHT to 0 / 0 A @ 4A per min as the datalogger is not showing up reading.

Tuesday, January 17, 2023, 14:24: Previous data logger was off. But could be turned back on. Dataloggers swapped just in case. Reading T2 @ 68.8 C. - AS

Tuesday, January 17, 2023, 15:49: Auto-ramping TGHT / TBHT to 100 / 100 A @ 2 A per min.

Tuesday, January 17, 2023, 17:10: Auto-ramping TGHT / TBHT to 200 / 200 A @ 2 A per min.

Tuesday, January 17, 2023, 19:56: Auto-ramping TGHT / TBHT to 250 / 250 A @ 2 A per min.

Tuesday, January 17, 2023, 20:28: Auto-ramping TGHT  to 300 A @ 2 A per min.

Wednesday, January 18, 2023, 10:17: Auto-ramping TGHT to 400 A @ 2 A per min. 

Wednesday, January 18, 2023, 11:35 : Auto-ramping TGHT to 500 A @ 2 A per min.

Wednesday, January 18, 2023, 13:51 :Auto-ramping TGHT / TBHT to 600 / 300 A @ 2 A per min.

Wednesday, January 18, 2023, 16:06 : Auto-ramping down TGHT / TBHT to 580 / 270 A @ 2 A per min to stay overnight.


Thursday, January 19, 2023, 10:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, January 19, 2023, 10:53: Anode @ 500 V.

Thursday, January 19, 2023, 10:54: Coil @ 50 A. Vacuum @ 1.36e-06T.

Thursday, January 19, 2023, 11:00: Auto-ramping TBHT to 290 A @ 2 A per minute.

Thursday, January 19, 2023, 11:14: Anode current @ 1.221 mA. Vacuum @ 1.52e-06T. TGHT /  TBHT @ 580 / 290 A.

Thursday, January 19, 2023, 11:24: Auto-cooling @ 2 A per min.

Thursday, January 19, 2023, 17:04: Anode voltage ramped down to 0 V.

Thursday, January 19, 2023, 17:04: Auto ramping down TGHT/TBHT to 0/ 0 A @ 2A per min.


Monday, January 30, 2023, 08:49: IG1 off. Turbo pumps off.

Entry  Tuesday, January 31, 2023, 10:42, Aaron Schmidt, , LP-SIS, , , 44062-1-SK, 45235-7, In progress, Conditioning UC#x assembly 

SK Series of LP-SIS targets are for conditioning only.

Tuesday, January 31, 2023, 10:39: Roughing. (Took quite a bit of effort to get the doors to shut. It's colder than usual in here. The seals were stiff)

Tuesday, January 31, 2023, 11:10: TP1B on.

Tuesday, January 31, 2023, 11:16: TP1B up to speed. TP1A on.

Tuesday, January 31, 2023, 11:24: TP1A timeout trip. Restarted @ 32 KRPM

Tuesday, January 31, 2023, 11:25: TP1A up to speed. IG1 n. Vacuum @ 1.51e-05T & dropping.

Tuesday, January 31, 2023, 13:34: Vacuum @ 2.08e-06T.

Tuesday, January 31, 2023, 13:36: FS#5 opened. PS on.

Tuesday, January 31, 2023, 13:46: Auto-ramping TGHT / TBHT to 10 A / 10 A @ 2 A per min.

Tuesday, January 31, 2023, 15:35: Auto-ramp TGHT / TBHT to 100 A / 50 A @ 2 A per min.

Tuesday, January 31, 2023, 19:02: Vacuum @ 7.92e-07T. Auto-ramping TGHT / TBHT to 350 A & 150 A @ 2 A per min. 


Wednesday, February 01, 2023, 06:16: Vacuum @ 5.75e-07T. Auto-ramping TGHT / TBHT to 580 A & 230 A @ 2 A per min.

Wednesday, February 01, 2023, 19:44: Vacuum @ 1.08e-06T. Auto-cooling TGHT / TBHT @ 2 A per min. 


Thursday, February 02, 2023, 07:34: Sources off. Turbo pumps off.

 

Entry  Thursday, February 02, 2023, 12:44, Aaron Schmidt, , LP-SIS, , , 44062-1-SK , 45235-1, In progress, Conditioning UC#x assembly 

SK Series of LP-SIS targets are for conditioning only.

Thursday, February 02, 2023, 12:41: Roughing.

Thursday, February 02, 2023, 12:43: BV1A open.

Thursday, February 02, 2023, 13:30: TP1B on.

Thursday, February 02, 2023, 13:34: TP1B at speed. TP1A on.

Thursday, February 02, 2023, 13:43: TP1A at speed. IG1 on.

Thursday, February 02, 2023, 14:53: Waterlines opened. Vacuum Ok @ 5.38e-06T.

Thursday, February 02, 2023, 14:55: PS / Sources on. Manually tap up TGHT / TBHT to 5 A. OK.


Friday, February 03, 2023, 06:32: Vacuum @ 6.56e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 


Monday, February 06, 2023, 07:39: Vacuum @ 8.36e-07T. Auto-cooling @ 2 A per min.


Tuesday, March 28, 2023, 13:45: Power / sources off.

Tuesday, March 28, 2023, 13:47: IG1 off. TP1A & TP1B off.


Wednesday, March 29, 2023, 07:53: Venting. 

Entry  Thursday, April 13, 2023, 11:07, Aaron Schmidt, , , , , , , In progress, Installation of new IDP-15 TMS:TP2 

IDP15 Scroll Pump, Std w/ inlet.

TMS:RP2

PN: X3815-64010

Serial: MY2301SA17

Thursday, April 13, 2023, 11:04: Roughing RP2

Thursday, April 13, 2023, 11:05: Open BV6 & BV2

Thursday, April 13, 2023, 11:15: TMS:TP2 & TMS:TP6 on.

Thursday, April 13, 2023, 11:19: IG6 on.

Thursday, April 13, 2023, 12:05: Vacuum @ 1.43e-05T.

Entry  Monday, April 17, 2023, 14:08, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6 

Monday, April 17, 2023, 14:03: Roughing.

Monday, April 17, 2023, 14:08: BV1A open.

Monday, April 17, 2023, 14:32: TP1B on.

Monday, April 17, 2023, 14:38: TP1A on.

Monday, April 17, 2023, 14:47: TP1A Timed out. Restarted it within 30 seconds & it's up to speed. IG1 on.


Tuesday, April 18, 2023, 11:49: Vacuum @ 3.68e-07T. Waterline FS#5 opened. Vacuum stable.

Tuesday, April 18, 2023, 11:52: Power / Sources on.


Tuesday, April 25, 2023, 12:20: Power / Sources off

Tuesday, April 25, 2023, 12:26: IG1 Off. TP1B & TP1A off.

Entry  Monday, May 01, 2023, 14:31, Aaron Schmidt, TiC#5, LP-FEBIAD, ITE, TM4, 44692-5, 45235-20, In progress, Conditioning TiC#5 TiC#5_-_44692-5_Anode_&_Coil_checks.docxTiC#5_-_44692-5_Conditioning.docx

New TiC LP-FEBIAD Target installed.

Monday, May 01, 2023, 14:23: Roughing.

Monday, May 01, 2023, 21:42: TP1B on 

Monday, May 01, 2023, 21:49: TP1A on. 

Monday, May 01, 2023, 21:57: IG1 on. 


Tuesday, May 02, 2023, 08:39: Vacuum @ 1.16e-06T. Waterline FS#5 opened.

Tuesday, May 02, 2023, 08:48: Power / sources on. Source gas set. SV5 remains open.

Tuesday, May 02, 2023, 09:00: Optics set.

Tuesday, May 02, 2023, 09:13: System ready check - OK. Manually set.

TGHT / TBHT @ 5 / 5 A

BIAS / EE / EZL @ 1 / -0.5 / 1 kV

Anode @ 100 V - 10.989 mA

Coil @ 10 A.

Tuesday, May 02, 2023, 10:12: Coil @ 70 A. Tapped up manually @ 7 A per minute.  

Tuesday, May 02, 2023, 12:20:

Tap up Anode in steps @ 20 v per 20 seconds.

Anode @ 100 V = 10.989 mA

Anode @ 200 V = 12.210 mA

Anode @ 300 V = 12.210 mA

Anode @ 400 V = 13.431 mA 

Tuesday, May 02, 2023, 12:36: Anode @ 20 V. 

Tuesday, May 02, 2023, 12:53: BIAS / EE / EZL @ 10 / -0.5 / 5 kV


Wednesday, May 03, 2023, 04:30: Auto-ramping TGHT / TBHT to 550 / 280 A @ 1 A per minute. 

Wednesday, May 03, 2023, 10:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

TGHT / TBHT @ 360 / 280 A. Ramping ongoing. 

Wednesday, May 03, 2023, 14:04: TGHT / TBHT @ 550 / 280 A

Wednesday, May 03, 2023, 14:10: Anode tapped up to 100 V @ 20 V per 20 seconds.

Wednesday, May 03, 2023, 14:25: Large spark*. Reset Optics.  

Wednesday, May 03, 2023, 14:46: Mass & wire scans complete. 

Wednesday, May 03, 2023, 17:05: Anode & coil checks complete. Auto-cooling of TGHT / TBHT @ 1 / 2 A per minute.

Wednesday, May 03, 2023, 22:51: IV4 closed. 


Thursday, May 04, 2023, 07:35: SV5 closed. Sources / Power off.

Thursday, May 04, 2023, 07:37: IG1 off. TP off.

Thursday, May 04, 2023, 09:17: Venting.

Entry  Friday, May 05, 2023, 06:49, Aaron Schmidt, TiC#6, HP-FEBIAD, ITW, TM2, 44692-10, 45235-12, In progress, Conditioning TiC#6 TiC#6_Anode_&_Coil_checks.docx

Ceramic elbow installed on the anode.

Friday, May 05, 2023, 06:47: Roughing.

Friday, May 05, 2023, 07:24: TP1B on.

Friday, May 05, 2023, 07:34: TP1A on.

Friday, May 05, 2023, 07:43: IG1 on.

Friday, May 05, 2023, 12:12: Vacuum @ 6.91e-06T. FS#5 opened. Vacuum stable.

Friday, May 05, 2023, 12:16: Power/sources on. Gases set

Friday, May 05, 2023, 12:19: Optics on / set.

Friday, May 05, 2023, 12:21: Quick System ready check - OK. Manually set. 

TGHT / TBHT @ 5 / 5 A

BIAS / EE / EZL @ 1 / -0.5 / 1 kV

Anode @ 100 V - 7.326mA

Coil @ 10 A.

Friday, May 05, 2023, 12:23: Ready for operation. All sources back to 0 A / 0 V. Optics remain. Vacuum continues down @ 6.70e-06T.


Monday, May 08, 2023, 08:21: IV4 open.

Monday, May 08, 2023, 08:25: Tap up Anode in steps @ 20 v per 20 seconds.

Anode @ 100 V = 4.884 mA

Anode @ 200 V = 6.105 mA

Anode @ 300 V = 7.326 mA

Anode @ 400 V = 7.326 mA  

Monday, May 08, 2023, 08:42: Anode tapped down to 20 V. 

Monday, May 08, 2023, 08:52: Coil tapped up to 70 A @ 7 A per minute. 

Monday, May 08, 2023, 09:12: Coil tapped back down to 0 A @ 7 A per minute.  

Monday, May 08, 2023, 09:15: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 / 1 A per min.  

Monday, May 08, 2023, 09:20: BIAS / EE / EZL set to 10 / -1.0 / 5 kV. 

Monday, May 08, 2023, 14:37: TGHT / TBHT @ 580 / 290 A. BIAS / EE / EZL set to 30 / -1.5 / 13 kV. 

Monday, May 08, 2023, 14:38: Anode tapped up to 100 V @ 20 V per 20 seconds. Begin mass & wire scans.  

Monday, May 08, 2023, 15:01: Mass & wire scans complete. 

Monday, May 08, 2023, 18:59: Tap up Anode in steps @ 20 v per 20 seconds from 100 V.

Anode @ 100 V = 9.768 mA

Anode @ 200 V = 12.210 mA

Anode @ 300 V = 14.652 mA

Monday, May 08, 2023, 19:05: Anode @ 400 V = 17.094 mA

Monday, May 08, 2023, 19:18: Anode tapped down to 20 V. 

Monday, May 08, 2023, 19:24: BIAS / EE / EZL @ 1 / -0.5 / 1 kV 

Monday, May 08, 2023, 19:35: Coil tapped up to 70 A @ 7 A per minute. 

Monday, May 08, 2023, 19:49: Coil tapped back down to 0 A @ 7 A per minute. Vacuum rose to 6.20e-06T @ 70A. Stabilized back down around 2.24e-06T.

Monday, May 08, 2023, 19:53: Auto-cooling @ 1 A per minute. 


Tuesday, May 09, 2023, 06:59: Anode, & HV sources to 0 V. IV4 closed.

Tuesday, May 09, 2023, 07:35: SV5 closed. Power / sources off.

Tuesday, May 09, 2023, 07:38: IG1 off. TP1B & TP1A off.

Tuesday, May 09, 2023, 08:49: Venting.

Entry  Tuesday, May 09, 2023, 10:40, Aaron Schmidt, SiC#45, HP-SIS, ITE, TM4, 44692-3, 45235-8, In progress, Conditioning SiC#45 SiC#45_Conditioning..docx

Tuesday, May 09, 2023, 10:28: Roughing.

Tuesday, May 09, 2023, 11:25: TP1B on. 

Tuesday, May 09, 2023, 12:38: TP1A on.

Tuesday, May 09, 2023, 12:49: IG1 on. 


Wednesday, May 10, 2023, 10:41: Waterline FS#5 opened. Vacuum @6.36e-07T

Wednesday, May 10, 2023, 10:56: IV4 open. Power / sources / optics on. 

Wednesday, May 10, 2023, 10:59: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 / 1 A per minute. 

Wednesday, May 10, 2023, 11:09: BIAS / EE / EZL @ 10 / -1.0 / 5 kV. 

Wednesday, May 10, 2023, 11:54: Vacuum climbing quickly @ 4.10e-06T. Halt ramping to stabilize. TGHT / TBHT @ 100 / 50 A.

Wednesday, May 10, 2023, 11:59: Vacuum @ 7.69e-06T & still climbing. 

Wednesday, May 10, 2023, 12:05: Levelled off @ 8.91e-06T. 

Wednesday, May 10, 2023, 13:16: Vacuum @ 2.04e-06T. Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 / 1 A per minute.

Wednesday, May 10, 2023, 13:34: Abort ramping. 

Wednesday, May 10, 2023, 13:52: Vacuum @ 4.35e-06T. Restart auto-ramping TGHT / TBHT to 200 / 100 A @ 1 A per minute.

Wednesday, May 10, 2023, 15:43: Vacuum @ 1.05e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per minute.  

Wednesday, May 10, 2023, 16:36: Vacuum @ 8.23e-07T. TGHT  / TBHT @ 250 A / 150 A. Auto-ramping TGHT / TBHT to 450 / 250 A @ 2 / 1 A per minute.  

Wednesday, May 10, 2023, 20:52: Vacuum @ 5.01e-06T. TGHT / TBHT Slowly ramping due to vacuum limit being reached. 


Thursday, May 11, 2023, 05:42: TBHT reduced @ 230 A. Auto-ramping TGHT to 580 A @ 2 A per min 

Thursday, May 11, 2023, 05:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, May 11, 2023, 09:30: Mass & wire scans complete.


Friday, May 12, 2023, 07:21: Auto-cooling @ 1 A per min.

Friday, May 12, 2023, 11:54: HV to 0 kV. 


Tuesday, May 16, 2023, 11:03: IV4 closed. Power / Sources off. Locked out.

Tuesday, May 16, 2023, 11:04: IG1 & IG6 off. All turbo pumps off.

Tuesday, May 16, 2023, 12:19: Venting.

 

Entry  Tuesday, May 16, 2023, 14:00, Aaron Schmidt, Ta#65, LP-SIS, ITE, TM4, 45220-7, 45235-2, In progress, Conditioning Ta#65 Ta#65_conditioning_-_Mass_&_wire_scans.docx

Calibrated window installed on the beam line.

Tuesday, May 16, 2023, 13:45: Roughing both the chamber & beam line.

Tuesday, May 16, 2023, 14:00: TMS:TP6 on.

Tuesday, May 16, 2023, 14:04: TMS:TP2 on.

Tuesday, May 16, 2023, 14:13: IG6 on.

Tuesday, May 16, 2023, 14:17: TSG:TP1B on.

Tuesday, May 16, 2023, 14:23: TSG:TP1A on.

Tuesday, May 16, 2023, 14:33: IG1 on.


Tuesday, May 23, 2023, 07:30: Waterline FS#5 open. Vacuum stable @ 2.78e-07T

Tuesday, May 23, 2023, 07:32: Power / Sources on.

Tuesday, May 23, 2023, 07:35: Auto-ramping TGHT / TBHT to 230 A / 230 A @ 2 A per min. IV4 open.

Tuesday, May 23, 2023, 07:38: Optics are set.

Tuesday, May 23, 2023, 11:38: Auto-ramping TGHT to 300 A @ 2 A per minute.  

Tuesday, May 23, 2023, 12:32: Auto-ramping TGHT to 350 A @ 2 A per minute. 

Tuesday, May 23, 2023, 13:13: Auto-ramping TGHT to 400 A @ 2 A per minute. 

Tuesday, May 23, 2023, 14:00: Auto-ramping TGHT to 450 A @ 2 A per minute.

Tuesday, May 23, 2023, 14:50: Auto-ramping TGHT to 500 A @ 2 A per minute.

Tuesday, May 23, 2023, 16:07: Auto-ramping TGHT to 550 A @ 2 A per minute.

Tuesday, May 23, 2023, 16:51: Auto-ramping TGHT to 580 A @ 2 A per minute.

Tuesday, May 23, 2023, 17:35: TGHT at 580A with TBHT at 230A.

Tuesday, May 23, 2023, 21:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Begin wire & mass scans.

Tuesday, May 23, 2023, 22:03: Mass & wire scans complete. 

Tuesday, May 23, 2023, 22:09: BIAS / EE / EZL @ 0 kV.  


Wednesday, May 24, 2023, 13:48: Auto-ramping TGHT to 550 A and TBHT to 200A @ 2 A per minute.

Currently at TGHT to 500 A and  TBHT to 150A. 15:44 pm

Wednesday, May 24, 2023, 15:44: Auto-ramping TGHT to 450 A and TBHT to 100A @ 2 A per minute.

Wednesday, May 24, 2023, 17:22: Auto-ramping TGHT to 400 A and TBHT to 50A @ 2 A per minute.


Thursday, May 25, 2023, 07:49: TGHT / TBHT @ 0A (Reached before midnight - But not logged). IV4 closed. 

Thursday, May 25, 2023, 09:04: Power / Sources off.

Thursday, May 25, 2023, 09:06: IG1 off. TP1B & TP1A off.

 

Entry  Wednesday, May 31, 2023, 15:19, Aaron Schmidt, SiC#46, HP-SIS, , , 44692-2, 45235-6, In progress, Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts SiC#2023A_-_No_Salts.docx

(Spare HP-SIS SiC SiC-23B)

Wednesday, May 31, 2023, 15:18: Roughing.


Thursday, June 01, 2023, 07:30: TP1B on.  

Thursday, June 01, 2023, 07:31: TMS:TP6 & TMS:TP2 on. 

Thursday, June 01, 2023, 07:38: IG6 on. TSG:TP1A on.

Thursday, June 01, 2023, 07:48: IG1 on.

Thursday, June 01, 2023, 08:26: Waterline FS#5 on. Vacuum @ 1.40e-06T. Power on.

Thursday, June 01, 2023, 08:28: Sources on. IV4 open.

Thursday, June 01, 2023, 08:31: Optics set.

Thursday, June 01, 2023, 08:33: Quick check: Manually tap up TGHT / TBHT to 5 / 5 A

BIAS / EE / EZL @ 1 / -0.5 / 1 kV.

Thursday, June 01, 2023, 08:51: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min.

Thursday, June 01, 2023, 09:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min.

Thursday, June 01, 2023, 11:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Thursday, June 01, 2023, 13:56: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Thursday, June 01, 2023, 14:20: Mass & wire scans.


Friday, June 02, 2023, 07:10: Mass & wires scans complete. Auto-cooling @ 2 A per min 

Friday, June 02, 2023, 09:22: BIAS / EE / EZL @ 0 kV. 


Thursday, June 08, 2023, 07:51: IV4 closed. Power / Sources off.

Thursday, June 08, 2023, 07:53: IG1 & Turbo pumps off.

Thursday, June 08, 2023, 10:32: Venting.

Entry  Thursday, July 06, 2023, 16:55, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, 42132-2, In progress, Conditioning Nb#10 Nb#10_Conditioning.docx

Thursday, July 06, 2023, 16:13: Roughing.

Thursday, July 06, 2023, 16:41: TP1B on.

Thursday, July 06, 2023, 16:47: TP1A on.

Thursday, July 06, 2023, 16:55: TP1A Trip, reset.

Thursday, July 06, 2023, 16:56: IG1 on.

Thursday, July 06, 2023, 16:58: Vacuum @ 1.32e-05T. Waterline FS#5 open.

Thursday, July 06, 2023, 17:02: Power's on. HV Rack is open.


Friday, July 07, 2023, 06:52: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute. Vacuum at 5.02e-07T

Attempted to open IV4, however it timed out.

Friday, July 07, 2023, 08:25: IV4 reset & opened.

Friday, July 07, 2023, 09:02: HV on.

Friday, July 07, 2023, 09:40: BIAS / EE / BIAS @ 30 / -1.5 / 13 kV. 

Friday, July 07, 2023, 10:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per minute. Vacuum at 6.34e-07T

Friday, July 07, 2023, 10:28: Optics set. FC0 @ 3.36e-11, set from 1uA to 100 nA.

Friday, July 07, 2023, 10:59: Reduce BIAS to 20 kV due to sparking.  

Friday, July 07, 2023, 12:24: BIAS back to 30 kV. TGHT / TBHT @ 580 / 230 A. FC0 @ 2.52e-09. Vacuum @ 1.32e-06T. Beginning mass & wire scans.

Friday, July 07, 2023, 16:57:  BIAS / EE / BIAS @ 0 kV.

Friday, July 07, 2023, 16:59: Vacuum @1.14e-06T. Auto-cooling @ 2 A per min. 

Entry  Thursday, July 13, 2023, 18:29, Aurelia Laxdal, , LP-SIS, , , , , In progress, Spectrometer tests 

 Pumping down: TS loaded with a LP-SIS container for spectrometer test. 

Started heating up the target container: up to 300A.

Last week: the LP container was heated up to TGHT 580A and TBHT 230A, and cooled down before the weekend. 

Pumping again (LP container in) for one more check. Last check was completed on July 26: up to 400A. 

Vented the chamber today (July 27). 

Did another test over the weekend. Currently the PSs are off and the chamber under vacuum. 

Entry  Wednesday, August 09, 2023, 14:29, Aaron Schmidt, , LP-SIS, , , 45220-6, 45235-3, In progress, Graphite target test 1 (C2023A) Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx

Graphite experiment 2: ID Gr-230601, WO#45220-6 ( https://elog.triumf.ca/TIS/Evaporator_2/598 )

Original disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.

Wednesday, August 09, 2023, 14:00: Roughing.

Wednesday, August 09, 2023, 14:10: TP6 & TP2 beamline side. On.

Wednesday, August 09, 2023, 14:15: IG6 on.

Wednesday, August 09, 2023, 14:29: TP1B on.

Wednesday, August 09, 2023, 14:38: TP1A on.

Wednesday, August 09, 2023, 14:46: No trips. IG1 on. Vacuum @ 6.08e-05T & dropping.

Wednesday, August 09, 2023, 14:48: Waterline FS#5 open. Vacuum @ 4.45e-05T & dropping.

Wednesday, August 09, 2023, 16:10: HV rack grounded.

Wednesday, August 09, 2023, 16:16: BIAS / EE / EZL @ 1 / -0.5 / 0.5 kV. ok

TGHT / TBHT tapped up to 5 / 5 A. ok

Wednesday, August 09, 2023, 16:17: TGHT / TBHT Tapped back to 0 A. IV4 open. Vacuum @ 7.03e-06T.


Thursday, August 10, 2023, 05:16: Auto-ramping TGHT / TBHT to 150 / 150 A @ 1 A per minute. 

Thursday, August 10, 2023, 05:24: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.  

Thursday, August 10, 2023, 05:26: FC0 out. MB1 set to -2508 to -2510 G. FC6 Auto range & Log10 green.

Thursday, August 10, 2023, 09:08: Pyrometer set on end cap. Slope set to 1.000. Temperature not yet displayed.

Thursday, August 10, 2023, 09:13: Auto-ramping TGHT / TBHT to 200 / 200 A @ 1 / 2 A per minute. (TBHT rate change confirmed)

Thursday, August 10, 2023, 10:17: Auto-ramping TGHT / TBHT to 230 / 230 A @ 1 / 2 A per minute.

Thursday, August 10, 2023, 10:48: Slope set to 0.99. Temperature @ 1109.8C. TGHT / TBHT @ 230 / 230 A.

Thursday, August 10, 2023, 10:58: Auto-ramping TGHT to 250 @ 1 A per minute.

Thursday, August 10, 2023, 11:20: TGHT @ 250 A. Mass scan taken to check for Na. Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225"

Thursday, August 10, 2023, 11:25: Auto-ramping TGHT to 250 @ 1 A per minute. Slope set to 0.98. Temperature @ 1215.5C.

Thursday, August 10, 2023, 12:00: Slope set to 0.97. Temperature @ 1339.7C.

Thursday, August 10, 2023, 12:12: Slope set to 1.00. Temperature @ 1340.1C.

Thursday, August 10, 2023, 12:15: Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225 - 22.235" again.

Thursday, August 10, 2023, 12:24: Auto-ramping TGHT to 350 @ 1 A per minute.

Thursday, August 10, 2023, 13:50: Slope set to 0.93 from 1. Temperature @ 1576.0 C. (Note: Was at 1466 C while at 1)

Thursday, August 10, 2023, 13:52: Auto-ramping TGHT to 400 @ 1 A per minute.

Thursday, August 10, 2023, 14:23: Steerers TSG:CBC dropped to 0V. Reset to 500 V.

Thursday, August 10, 2023, 14:52: Masscorr - Link to all:

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/

Link to this test:

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-14-51%20Graphite%2045220-6

Thursday, August 10, 2023, 14:57: Auto-ramping TGHT to 450 A @ 1 A per min.

Thursday, August 10, 2023, 16:12: TGHT @ 450A.  Mass scan taken. Swept mass 45 to 4. 

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-21%20Graphite%2045220-6                 - dn

Thursday, August 10, 2023, 16:43: graphitetesting.stp data dump to http://isacwserv.triumf.ca/onlylocal/isactdata/isactdata/2023-08-10-16-38-Graphite-25220-6    -dn

  Mass scan taken. swept mass from 150 to 4.  http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-45%20Graphite%2045220-6     -dn

Thursday, August 10, 2023, 16:58: moved magnet back to Na at -2441.4G.  - dn

Thursday, August 10, 2023, 17:08: ramping TBHT and TGHT down at 1A/min


Monday, August 14, 2023, 08:15: HV off.

Monday, August 14, 2023, 08:46: Power / Sources off.

Monday, August 14, 2023, 08:47: IG1 & turbo pumps off.

Monday, August 14, 2023, 10:12: Venting. 

Entry  Friday, August 25, 2023, 17:21, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, 42132-4, In progress, Conditioning Nb#11 Nb#11_Conditioning.docx

Replacement for Nb#10

Friday, August 25, 2023, 17:15: Roughing.

Friday, August 25, 2023, 17:57: Vacuum taking a while to rough down. Vacuum @ 1.034T. Opened FS#5.

Friday, August 25, 2023, 17:59: Water leak noted. Venting.

Friday, August 25, 2023, 18:27: The left HS waterline was not tight. Chamber is cleaned out & wiped down.

Friday, August 25, 2023, 18:28: Roughing. Purge on RP1

Friday, August 25, 2023, 19:00: Open closed ballast repeatedly on RP1 to purge excess moisture.

Friday, August 25, 2023, 19:05: FS#5 open. No effect on vacuum. Vacuum @ 2.228T & dropping. Power / sources on.

Friday, August 25, 2023, 19:18: Quick bypass check with "IG1 on". Tapped up TGHT / TBHT to 5 A each, & down again. 500 V on & off the BIAS. ok. Bypass removed. Vacuum @ 1.222T. Will remote start TP later. Allow vacuum to stabilize. Otherwise ready for remote operation.

Friday, August 25, 2023, 23:14: Vacuum @ 0.135T. TP1B on. 

Friday, August 25, 2023, 23:20: TP1B at speed. CG1 @ 0.165 T - Allow to stabilize. 

Friday, August 25, 2023, 23:26: CG1 @ 0.091 T. TP1A on.

Friday, August 25, 2023, 23:36: TP1A Tripped. Reset & restart. TP1B off.


Saturday, August 26, 2023, 00:02: The  TSG:CG1A limit to open needs to be increased from 0.050T to 0.100T. Currently at 0.070T. Unable to restart the TP until it's below the limit. Will wait till morning... Later in the morning.

Saturday, August 26, 2023, 09:19: TP1B switched on. 

Saturday, August 26, 2023, 10:08: TP1A switched on.

Saturday, August 26, 2023, 10:16: TP1 A tripped. Reset right away - CG1A @ 0.048T. 

Saturday, August 26, 2023, 10:17: IG1 on. 

Saturday, August 26, 2023, 16:40: IV4 open.

Saturday, August 26, 2023, 16:41: Optics set. Vacuum @ 5.63e-06T 

Saturday, August 26, 2023, 23:43: Vacuum @ 4.46e-06T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute. Expecting outgassing however. 


Sunday, August 27, 2023, 09:11: Vacuum @ 5.10e-06T. TGHT / TBHT @ 350 / 150 A. Auto-ramping TGHT to 400 A. 

Sunday, August 27, 2023, 10:44: Abort TGHT @ 383 A. Auto-ramping TGHT / TBHT to 500 / 200 A.

Sunday, August 27, 2023, 19:13: Vacuum @ 5.08e-06T. TGHT / TBHT @ 422 / 189 A. Auto cool TGHT / TBHT to 250 / 100 A @ 4 A per minute.

Sunday, August 27, 2023, 20:06: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Sunday, August 27, 2023, 22:43: Halt auto-ramp @ 490 / 230 A. 

Sunday, August 27, 2023, 22:50: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Sunday, August 27, 2023, 22:52: Begin mass & wire scans. Manually tap up TGHT to 500 A. Vacuum @ 5.36e-06T 

Sunday, August 27, 2023, 23:04: Manually tap up TGHT to 505 A 

Sunday, August 27, 2023, 23:09: Manually tapped up TGHT to 520 A.

Sunday, August 27, 2023, 23:11: Increase TSH auto-ramp vacuum limit from 5.00e-06T to 6.00e-06T. Auto-ramping TGHT to 580 A @ 3A per min.

Sunday, August 27, 2023, 23:25: TGHT up to 554 A . Vacuum limit reached. Take mass & wire scans.

Sunday, August 27, 2023, 23:59: Peak on Mass 40. Otherwise mostly back round.  


Monday, August 28, 2023, 00:02: Reset TSH auto-ramp vacuum limit to 5.0e-06T. Auto-cooling @ 2A per minute.\

Monday, August 28, 2023, 00:09: HV tapped down to 0 V. 

Monday, August 28, 2023, 06:08: IV4 closed. Sources off. 

Monday, August 28, 2023, 06:09: IG1 & turbo pumps off.

Monday, August 28, 2023, 07:30: Power off. Venting. Purge FS#5.

Entry  Tuesday, October 10, 2023, 15:46, Aaron Schmidt, Ta#68 (Spare), LP-SIS, , , 45220-3, 45235-11, In progress, Conditioning Ta#68 (Spare) Ta#68-Spare_Conditioning.docx

Tuesday, October 10, 2023, 15:18: Roughing.

Tuesday, October 10, 2023, 15:46: TP1B on.

Tuesday, October 10, 2023, 15:52: TP1B at speed. CG1A @ 0.113T & dropping.

Tuesday, October 10, 2023, 15:53: TP1A on.

Tuesday, October 10, 2023, 16:01: TP1A tripped. Reset.

Tuesday, October 10, 2023, 16:03: TP1A on. IG1 on.


Wednesday, October 11, 2023, 09:14: FS#5 open. Vacuum @ 5.19e-07T.

Wednesday, October 11, 2023, 09:20: PS / Sources on.

Wednesday, October 11, 2023, 09:22: Auto-ramping TGHT / TBHT to 230 / 230 A @ 2 A per min.

Wednesday, October 11, 2023, 14:10: HV off.

Wednesday, October 11, 2023, 14:26: Grounded HV rack. HV on.

Wednesday, October 11, 2023, 14:27: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.

Wednesday, October 11, 2023, 22:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Wednesday, October 11, 2023, 23:24: 1st round of mass & wire scans complete.


Thursday, October 12, 2023, 09:37: HV off.


Wednesday, October 18, 2023, 08:12: IV4 closed. Sources off.

Wednesday, October 18, 2023, 08:14 : Power off. IG1 off. TP off.


Thursday, August 15, 2024, 08:15: Formerly Ta#67 until the thin foil target, - AS

Entry  Wednesday, October 18, 2023, 15:43, Aaron Schmidt, , LP-SIS, , , 45447-12, 45235-17, In progress, Conditioning UC#43 (empty) w/ gas line UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx

Thermocouples attached on end plate

Indium salt @ 10 µl

3 wraps of Ta HS on oven. Gas line on center block. Empty oven.

Wednesday, October 18, 2023, 15:13: Roughing

Wednesday, October 18, 2023, 15:35: Waterline FS#5 on.

Wednesday, October 18, 2023, 15:42: TP1B on.

Wednesday, October 18, 2023, 15:52: TP1A on.

Wednesday, October 18, 2023, 16:00: IG1 on.


Thursday, October 19, 2023, 07:34: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Thursday, October 19, 2023, 09:15: IV4 opened.

Thursday, October 19, 2023, 09:42: HV sources on.

Thursday, October 19, 2023, 09:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.

Thursday, October 19, 2023, 09:45: Optics are set. Standard tune.

Thursday, October 19, 2023, 10:40: HV to 0 kV. Cage open.

Thursday, October 19, 2023, 12:16: Cage closed. HV sources on. Optics set.

Thursday, October 19, 2023, 13:41: 1st set of mass scans complete. Optics set to 'Fernando's Tune',


Friday, October 20, 2023, 06:29: Mass & wire scans continue. 

Friday, October 20, 2023, 10:33: BIAS / EE / EZL @ 43 / -2.2 / 18.5 kV.

Friday, October 20, 2023, 11:00: Spark* Optics needed full reset. 

Friday, October 20, 2023, 12:48: HV to 0 kV. HV test done 


Tuesday, October 24, 2023, 09:39: PS / sources off. IV4 closed - Tripped - Reset.

Tuesday, October 24, 2023, 09:41: IG1 off. TP off.

Entry  Monday, October 30, 2023, 16:01, Aaron Schmidt, , LP-SIS, , , 45220-2, 45235-13, In progress, HV power surge test plus mass scans 

 Monday, October 30, 2023, 16:00  Roughing


Tuesday, October 31, 2023, 08:58 Turbos on the afternoon before, TP1A timed out which delayed for another 30min turning on both TP. Now 3e-6 Torr in IG1. - FBP

Tuesday, October 31, 2023, 09:38: FS#5 open. Vacuum Stable @ 2.96e-06T

Tuesday, October 31, 2023, 09:40: PS / sources on.

Tuesday, October 31, 2023, 10:32 Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Tuesday, October 31, 2023, 12:07 HV cage closed. TSG:BIAS and TSH:EE PS are on. Waiting for TGHT ramp up to finish.

Tuesday, October 31, 2023, 14:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, October 31, 2023, 14:39 IG1 5e-6Torr , TGHT ramp up on hold.

Tuesday, October 31, 2023, 14:40 Starting HV tests.

Tuesday, October 31, 2023, 15:10 HV tests went up to 53kV until gauge on Faraday cage started sparking. TP6 seems to have tripped after a few sparks from that gauge. The TC wire seems to be placed to conservatively.


Wednesday, November 01, 2023, 08:06: TP6 Was tripped. IV4 closed. TP6 Restarted. - AS

Wednesday, November 01, 2023, 08:10: Tp6 on. IV4 open.

Wednesday, November 01, 2023, 09:32: HV to 0 kV.

Wednesday, November 01, 2023, 09:33:  Auto-cooling @ 2 A per min.


Monday, November 06, 2023, 09:07: IV4 closed. PS off. IG1 & turbos off.