Monday, June 07, 2021, 13:45, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Ta#62 Conditioning
|
Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B on. (Tripped shortly after?)
Monday, June 07, 2021, 14:32: Unstable. Venting.
Monday, June 07, 2021, 15:05: Changed gaskets. Left side suspect. Roughing.
Monday, June 07, 2021, 15:35: TP1B on.
Monday, June 07, 2021, 15:42: TP1B up to speed.
Monday, June 07, 2021, 15:45: TP1A on.
Monday, June 07, 2021, 16:01: IG1 on.
Monday, June 07, 2021, 16:02: FS#5 opened. No response on backing lines. TSG:IG1 ok.
Tuesday, June 08, 2021, 08:01: Power / sources on.
Tuesday, June 08, 2021, 08:07: Reset / CFG optics & steering.
Tuesday, June 08, 2021, 08:08: TGHT / TBHT @ 10 A ok. BIAS / EE / EZL @ 5 / -0.5 / 1 kV. Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.9 |
4.02 |
TBHT |
22.4 |
3.15
|
COIL + EE |
21.9 |
4.99 |
TGHT |
22.0 |
5.58 |
Tuesday, June 08, 2021, 08:13: Auto ramping TGHT / TBHT to 350 / 150 @ 2 A per min.
Tuesday, June 08, 2021, 08:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Small spark near 30 kV while bringing up the HV.
Tuesday, June 08, 2021, 08:25: IV4 open. Optics set minus TPS:CB2. Shows as green 'on', set to 500V, however read back shows as 0 V.
Tuesday, June 08, 2021, 12:44: Auto ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Tuesday, June 08, 2021, 15:53: Beam on FC0 ok. Optics set minus TPS:CB2, however FC6 is disconnected. auto-cooling @ 3 A per min.
Tuesday, June 08, 2021, 18:32: Auto-cooling halted. TGHT @ 104.3 A.
Wednesday, June 09, 2021, 07:13: Auto-cooling continued @ 2 A per min.
Wednesday, June 09, 2021, 08:37: HV off. Attempts made to restart TPS:CB2 unsuccessful. Controls notified.
Wednesday, June 09, 2021, 10:33: Power / sources off. FS#5 purged. IV4 closed. IG1 & IG6 off. All turbo pumps off.
Wednesday, June 09, 2021, 11:52: Venting VV1 & VV6.
|
Wednesday, June 09, 2021, 14:31, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, In progress, Install MB1 window & 9 pin for V test.
|
Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6
https://elog.triumf.ca/TIS/Test-Stand/721
ST 9-pin HV rack
Pin to L TGHT - 1 - Black / COM / 5
Pin to R TGHT - 6 - Red / 9
Pin to L TBHT - 4 - Black / COM / 2
Pin to R TBHT - 5 - Red / 1
Wednesday, June 09, 2021, 14:29: Window installed. Roughing - Beam line side.
Wednesday, June 09, 2021, 14:41: TP6 on.
Wednesday, June 09, 2021, 14:45: TP2 on.
Wednesday, June 09, 2021, 14:55: Roughing.
Wednesday, June 09, 2021, 16:09: TP1 on.
Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\
TGHT reading ok , TBHT odd? Internal connection.
Thursday, June 10, 2021, 14:45: Turbo pumps off.
Thursday, June 10, 2021, 15:25: Venting.
Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.
Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.
Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.
Thursday, June 10, 2021, 16:43: TP1B on.
Thursday, June 10, 2021, 16:48: TP1A on.
Thursday, June 10, 2021, 16:55: IG1 on
Tests Complete as per Aurelia.
Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.
Monday, June 21, 2021, 09:40: Venting both ends. |
Monday, June 21, 2021, 11:53, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44139-10, 44378-4, Failed, Ta#62 Conditioning - 2
|
Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.
Monday, June 21, 2021, 12:02: TP1B on.
Monday, June 21, 2021, 12:13: TP1A on.
Monday, June 21, 2021, 12:21: IG1 on.
Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5
Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.
Monday, June 21, 2021, 14:42: Power / Sources on.
Monday, June 21, 2021, 14:43; IV4 opened & Optics on
Tuesday, June 22, 2021, 07:40: Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.7 |
4.02 |
TBHT |
24.2 |
3.18
|
COIL + EE |
23.6 |
5.11 |
TGHT |
23.8 |
5.64 |
Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.
Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.
Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.
Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.
Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.
Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.
Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.
Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.
Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off.
Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged. |
Friday, June 25, 2021, 11:18, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, 44378-4, Done, Ta#62 Conditioning - New
|
Replacement Ta target for the previous one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing.
Friday, June 25, 2021, 11:55: TP1B started.
Friday, June 25, 2021, 12:00: TP1B on. TP1 A started.
Friday, June 25, 2021, 12:08: IG1 on.
Friday, June 25, 2021, 12:23: Vacuum @ 1.06E-05T. Open waterline FS#5.
Friday, June 25, 2021, 12:26: Vacuum @ 9.97E-06T. OK.
Friday, June 25, 2021, 12:30: Power / sources PS on.
Friday, June 25, 2021, 12:34: Full check for remote use. IV4 open (OK)
Vacuum @ 6.70e-06T
TGHT / TBHT @ 10 / 10 A
BIAS / EE / EZL @ 1 / -0.1 / 0.5 kV.
Ready for operation.
Friday, June 25, 2021, 12:39: All back to 0 Kv / 0 A. Wait for vacuum stabilization.
Sunday, June 27, 2021, 03:55: Auto-ramping TGHT / TBHT to 500 / 150 A @ 2 A per min.
Sunday, June 27, 2021, 04:04: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Sunday, June 27, 2021, 09:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Sunday, June 27, 2021, 10:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Sunday, June 27, 2021, 10:16: TGHT / TBHT @ 580 / 230 A. Vacuum @ 1.25e-06T.
Sunday, June 27, 2021, 11:20: Mass & wire scans complete. Vacuum @ 1.14e-06T. Auto-cooling @ 2 A per min.
Sunday, June 27, 2021, 15:07: BIAS / EE / EZL @ 0 kV. TGHT still cooling.
Monday, June 28, 2021, 06:17: IV4 closed (Needs reset). Sources, IG1, turbo pumps, off
Monday, June 28, 2021, 08:22: Power off. IV4 reset. Venting. |
Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
|
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on.
Tuesday, September 14, 2021, 17:55: IG1 on.
Wednesday, September 15, 2021, 06:51: Waterlines opened. Vacuum Stable @ 4.46e-06T.
Wednesday, September 15, 2021, 07:01: Power/sources/optics on - Set.
Wednesday, September 15, 2021, 07:02: IV4 opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.8 |
3.99 |
TBHT |
24.6 |
3.23
|
COIL + EE |
23.6 |
5.02 |
TGHT |
23.8 |
5.66 |
Wednesday, September 15, 2021, 07:05: Quick system check. TGHT / TBHT @ 10 / 10 A. OK.
Wednesday, September 15, 2021, 07:06: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Not ok. BIAS short!!!* set to 1kV, zero read back. 0V & 0.230 mA.
Wednesday, September 15, 2021, 08:01: Hook was still in the cage. Removed*
Wednesday, September 15, 2021, 08:05: Quick system check. TGHT / TBHT @ 10 / 10 A. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. All ok. Vacuum @ 4.02e-06T. Allow to stabilize.
Thursday, September 16, 2021, 04:38: Vacuum @ 2.13e-06T. Auto-ramping TGHT / TBHT to 350 A / 150 A @ 2 A per min.
Thursday, September 16, 2021, 04:44: BIAS / EE / EZL @ 20 / -1.0 / 10 kV.
Thursday, September 16, 2021, 08:58: Auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 13:20: Auto-ramp halted. Vacuum @ 3.12 e-06T. TGHT / TBHT @ 410 / 210. Adjusted good vacuum / increment limit t0 5.0e-06T & 7e-06T (Back off limit). Continue auto-ramping TGHT / TBHT to 580 A / 230 A @ 2 A per min.
Thursday, September 16, 2021, 16:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. TGHT / TBHT @ 543+/ 230 A. TGHT still ramping on vac limit. Good wire scans so far.
Thursday, September 16, 2021, 16:36: Mass & wires scans proceeding.
Thursday, September 16, 2021, 17:16: Scans ok. TGHT @ 550 A. Vacuum @ 5.12e-06T.
Friday, September 17, 2021, 10:41: Mass & wire scans ok. BIAS / EE / EZL to 0 kV.
Sunday, September 19, 2021, 20:33: Auto-cooling @ 1 A per min.
Monday, September 20, 2021, 06:10: Power/sources off. IV4 off. Lock-out.
Monday, September 20, 2021, 06:13: IG1 off. Turbo pumps off.
Thursday, September 23, 2021, 05:04: Venting. |
Thursday, October 14, 2021, 10:13, Aaron Schmidt, , LP-SIS, ITW, TM2, , 44378-22, In progress, Conditioning UC#36 HS
|
Tube / TGHT only.
Thursday, October 14, 2021, 10:11: Roughing.
Thursday, October 14, 2021, 12:05: TP1B on.
Thursday, October 14, 2021, 12:10: TP1A on.
Thursday, October 14, 2021, 13:27: IG1 on.
Thursday, October 14, 2021, 16:08: Vacuum @ 3.73e-06T
Thursday, October 14, 2021, 16:10: FS#5 open. Vacuum Stable.
Thursday, October 14, 2021, 16:13: PS on. Sources on. TGHT manually tapped up to 10 A. OK. Allow vacuum to stabilize further.
Friday, October 15, 2021, 06:38: Auto-ramping TGHT to 580 A @ 2 A per min.
Friday, October 15, 2021, 21:32: Auto-Cooling @ 1 A per min.
Monday, October 18, 2021, 07:50: Sources, IG1, & turbo pumps off. |
Friday, November 12, 2021, 13:01, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, 44378-12, In progress, Conditioning Ta#63
|
Friday, November 12, 2021, 13:01: BV1B open. Roughing.
Friday, November 12, 2021, 13:05: BV1A open.
Friday, November 12, 2021, 13:34: TP1B on.
Friday, November 12, 2021, 13:42: TP1A on.
Friday, November 12, 2021, 13:50 : IG1 on. TMS:TP2 trip. Fast reset. OK. Vacuum @ 3.54e-05T. Waterline FS#5 open.
Friday, November 12, 2021, 13:53: Vacuum @ 2.12e-05T. Ok
Friday, November 12, 2021, 13:54: Power / sources on.
Monday, November 15, 2021, 09:00: Auto-ramping TGHT / TBHT to 350 / 150 @ 3 A per min. IV4 open. TMS:VCB1 not functioning. Controls group notified.
Monday, November 15, 2021, 09:40: Optics set minus TMS:VCB1
Monday, November 15, 2021, 11:16: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min.
Monday, November 15, 2021, 11:34: TMS:VCB1 fixed. Optics set ok.
Monday, November 15, 2021, 11:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 15, 2021, 15:44: Mass & wire scans complete. OK. HV to 0 kV. IV4 closed.
Tuesday, November 16, 2021, 06:16: Auto-cooling TGHT / TBHT @ 2A per min.
Tuesday, November 16, 2021, 11:13: Power / sources off.
Tuesday, November 16, 2021, 11:14: IG1. Turbo pumps off.
Tuesday, November 16, 2021, 12:12: Venting. |
Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown
|
LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.
Thermocouples are installed.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Twisted pairs |
TP1 |
TP1 |
- |
TP2 |
TP2 |
TP3 |
TP3 |
TP4 |
TP4 |
Tuesday, December 21, 2021, 13:55: Roughing.
Tuesday, December 21, 2021, 13:57: BV1A open.
Thursday, December 23, 2021, 07:42: TP2 & TP6 off.
Thursday, December 23, 2021, 09:00: PV1 & PV2 off. RP1 & RP2 off.
Clean up?? What happened here? (Water mess?)
Tuesday, January 04, 2022, 11:13: RP1 & RP2 on.
Tuesday, January 04, 2022, 11:14: Roughing.
Tuesday, January 04, 2022, 11:17: TP2 & TP6 on.
Tuesday, January 04, 2022, 11:21: IG6 on.
Tuesday, January 04, 2022, 13:00: TP1B on.
Carla:
Swapped top and bottom connector on target side multipin to match up with wires. Added kapton tape where things were touching. TC#3 (ROI) maybe won't work, was very twisted. Not sure if I got all the twists.
Data logger |
Location |
Source tray position |
HV rack position |
TC#1 |
MMO |
1 pos |
5 pos
|
|
|
6 neg |
9 neg |
TC#2 |
MMI |
4 pos |
2 pos |
|
|
5 neg |
1 neg |
TC#3 |
ROI |
8 pos |
7 pos |
|
|
9 neg |
6 neg |
Monday, January 10, 2022, 09:53: Roughing.
Monday, January 10, 2022, 15:55: TP1B on
Monday, January 10, 2022, 16:04: TP1A on.
Monday, January 10, 2022, 16:14: TP2 Tripped. Back on within 30 seconds.
Monday, January 10, 2022, 16:14: IG1 on.
Wednesday, January 12, 2022, 09:56 : Cage has been closed up and HS water lines are open. |
Monday, February 28, 2022, 08:08, Aaron Schmidt, , LP-SIS, , , , , , Mass marker / Coil-Tube target Test #2
|
Installed & roughing Friday.
Monday, February 28, 2022, 08:07: Turbopump TP1B on.
Monday, February 28, 2022, 09:21: TP1A on.
New thermocouple setup:
|
Rack position |
Multipin position |
Target position |
TC1 |
5,9
|
- |
- |
TC2 |
1,2 |
4,5 |
Right side of Ta oven |
TC3 |
6,7 |
8,9 |
Left side of Ta oven |
Monday, February 28, 2022, 18:57 : Data logging started. Forgot to set interval, not sure what it is at....
PLAN:
Ramp up coil to 50A, record temperatures
Ramp coil down then ramp target and tube to same values as before, record temperatures.
Ramp coil as before.
Tuesday, March 01, 2022, 14:52: Vacuum @ 1.60e-06T. Waterlines opened - AS
Tuesday, March 01, 2022, 14:54: Vacuum ok.
Turbos stopped Wednesday night. Ready to be uninstalled after venting and water purging. |
Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
|
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on.
Wednesday, June 08, 2022, 10:13: TP1B up to speed. TP1A on.
Wednesday, June 08, 2022, 10:21: TP1A up to speed. IG1 on.
Wednesday, June 08, 2022, 13:06: Waterline FS#5 Open. Vacuum @ 3.32-e06T.
Wednesday, June 08, 2022, 13:22: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Wednesday, June 08, 2022, 13:26: One spark*.
Wednesday, June 08, 2022, 13:32: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, June 08, 2022, 13:33: Spark*
Wednesday, June 08, 2022, 13:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Wednesday, June 08, 2022, 13:42: Spark*. Outside the cage (EE) Feedthrough (K) Between a hex edge & one of the resistors on a plastic plate.
Wednesday, June 08, 2022, 13:50: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Wednesday, June 08, 2022, 14:18: We are back. Spark tripped the computer & shut it off while tapping up the HV. BIAS / EE / EZL @ 48.3 / 2.4 / 20 kV.
Wednesday, June 08, 2022, 14:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV.
Wednesday, June 08, 2022, 14:45: Spark* In the cage.
Wednesday, June 08, 2022, 14:57: Spark* In the cage.
Wednesday, June 08, 2022, 15:19: No sparks have occurred off the thermocouples. Begin tapping down the HV.
Wednesday, June 08, 2022, 15:29: HV off. TGHT / TBHT Check @ 5 / 5 A OK.
Wednesday, June 08, 2022, 15:31: IV4 open.
Thursday, June 09, 2022, 05:14: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, June 09, 2022, 08:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Thursday, June 09, 2022, 08:22: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min
Thursday, June 09, 2022, 08:29: Optics set. Standard tune.
Thursday, June 09, 2022, 10:22: Beginning wire & mass scans.
Thursday, June 09, 2022, 10:30: Adjust TSG:CB1 (ok)
Thursday, June 09, 2022, 11:40: Mass & wire scans complete. Tune set to standard. HV tests begin. BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, June 09, 2022, 11:45: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, June 09, 2022, 13:01: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Thursday, June 09, 2022, 13:13: Small spark* Outside the chamber, but in the cage.
Thursday, June 09, 2022, 13:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. (One spark during the tap up. In the cage)
Thursday, June 09, 2022, 14:03: Small spark, barely audible.
Thursday, June 09, 2022, 14:11: Large spark in the cage* Computer was shut off. Got it back around 14:16
Thursday, June 09, 2022, 14:20: Reset steering, optics, IG6.
Thursday, June 09, 2022, 14:28: Begin tapping down HV
Thursday, June 09, 2022, 14:34: HV to 0.
Thursday, June 09, 2022, 14:36: Closed IV4. (Reset w/ screwdriver)
Friday, June 10, 2022, 09:58: Auto-Cooling @ 2 A per min.
Monday, June 13, 2022, 10:16: IG1 off. Turbo pumps off. |
Tuesday, September 27, 2022, 07:55, Aaron Schmidt, C#4, LP-SIS, ITE, TM4, 44691-3, 44378-23, In progress, Conditioning C#4 w/ thermocouples
|
Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM
Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T
Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
Tuesday, October 18, 2022, 13:25, Aaron Schmidt, C#5, LP-SIS, , , 45235-5, 44691-13, In progress, Conditioning C#5
|
Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on.
Wednesday, October 19, 2022, 12:18: TP1A on.
Wednesday, October 19, 2022, 12:26: IG1 on.
Wednesday, October 19, 2022, 12:34: IV4 open & Closed. Vacuum @ 4.13e-06T.
Wednesday, October 19, 2022, 12:39: FS#5 Water line opened.
Wednesday, October 19, 2022, 12:40: PS on.
Wednesday, October 19, 2022, 12:43: Optics PS on. Unlocked.
Wednesday, October 19, 2022, 12:44: Sources on. Vacuum @ 3.21e-06T.
Wednesday, October 19, 2022, 12:46: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 19, 2022, 12:47: TGHT / TBHT @ 10 / 10 A manually.
Wednesday, October 19, 2022, 12:48: IV4 Open.
Wednesday, October 19, 2022, 12:53: Optics set.
Controls updated
Monday, November 07, 2022, 12:40: Optics set
Monday, November 07, 2022, 13:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. Spark*
Monday, November 07, 2022, 13:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Monday, November 07, 2022, 13:41: BIAS / EE / EZL @ 45 / -2.3 / 20 kV with multiple sparks near the 44-45kV end of the tap up.
Monday, November 07, 2022, 14:09: Spark. Audible outside the cage, however vacuum was also affected.
Monday, November 07, 2022, 14:49: No further sparks. HV check ok.
Monday, November 07, 2022, 14:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. |
Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly
|
LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open.
Tuesday, November 15, 2022, 12:40: TP1B on
Tuesday, November 15, 2022, 12:47: TP1A on
Tuesday, November 15, 2022, 12:49: T1A Currently spinning up. Distinct & loud hum noted. Contacting vacuum group.
Tuesday, November 15, 2022, 12:50: TP's off.
Tuesday, November 15, 2022, 12:55: TP1B restart. ok
Tuesday, November 15, 2022, 12:56: TP1A restart. Failed
Tuesday, November 15, 2022, 13:04: TP1A restart. Failed.
Tuesday, November 15, 2022, 13:05: Controller reset TP1A restarted. Failed. Visually confirmed that it has seized.
See elog# 946
Wednesday, November 16, 2022, 14:53: TP1B on
Wednesday, November 16, 2022, 14:56: TP1B at speed.
Wednesday, November 16, 2022, 14:58: TP1A on.
Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on
Thursday, November 17, 2022, 07:14: Waterline FS#5 open. Vacuum stable @ 9.59e-07T
Thursday, November 17, 2022, 07:15: IV4 open.
Thursday, November 17, 2022, 07:18: PS & Sources on.
Thursday, November 17, 2022, 07:20: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, November 17, 2022, 07:23: Optics set
Thursday, November 17, 2022, 07:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 07:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, November 17, 2022, 07:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, November 17, 2022, 07:40: BIAS / EE / EZL @ 45 / -2.3 / 20 kV
Thursday, November 17, 2022, 08:40: No sparks over 1 hr.
Thursday, November 17, 2022, 08:43: HV reduced. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 10:06: Minor instability & sparks noted.
Thursday, November 17, 2022, 10:18: Consistent sparking. Visually confirmed on the TBHT insulator.
Thursday, November 17, 2022, 10:21: BIAS & EZL reduced to 20 / 10 kV.
Thursday, November 17, 2022, 10:51: HV stable for the last 15 minutes. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, November 17, 2022, 14:02: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Stable
Thursday, November 17, 2022, 14:25: Mass & wire scans complete Empty LP-SIS No salts added.
Masses showed around mass:
-130-140
-39-40
-23-28
Thursday, November 17, 2022, 14:27: Outgassing continues.
Friday, November 18, 2022, 07:39: Mass & wire scans continued.
Traces masses:
-39-40
-23
Friday, November 18, 2022, 07:48: Auto-cooling @ 2 A per min.
Friday, November 18, 2022, 08:01: HV off.
Monday, November 21, 2022, 06:44: Sources off & IV4 closed.
Monday, November 21, 2022, 06:45: IG1 off. Turbo pumps off. |
Thursday, January 12, 2023, 09:04, Aaron Schmidt, , LP-SIS, , , 44691-14, 44378-20, In progress,
|
Test for Aurelia L. Empty LP-SIS w/ end caps in. Right side expanded.
Thermocouples installed (R - L):
X & Y For the (V) checks.
Y - Y
X - O
X - R
L - R
L - O
Datalogger: R= T1 & L=T2
X = TGHT
Y = TBHT
O = Not in use.
Thursday, January 12, 2023, 09:06: Beamline side roughed down & TP on sometime last night. Vacuum @ 2.77e-06T.
Connect volt meters to 4,5 (TBHT) & 6,7 (TGHT)
Thursday, January 12, 2023, 09:43: IG1 Bypass made. TGHT / TBHT at 10 A. Volt meter check. Both display in negatives.
Thursday, January 12, 2023, 09:54: Swapped wires around for both TGHT / TBHT volt meters. OK. Breaker / PS off. Bypass removed.
Thursday, January 12, 2023, 10:14: Roughing.
Thursday, January 12, 2023, 10:16: BV1A open.
Monday, January 16, 2023, 10:25: Sources off. IV4 closed. Turbo pumps off. |
Tuesday, January 31, 2023, 10:42, Aaron Schmidt, , LP-SIS, , , 44062-1-SK, 45235-7, In progress, Conditioning UC#x assembly
|
SK Series of LP-SIS targets are for conditioning only.
Tuesday, January 31, 2023, 10:39: Roughing. (Took quite a bit of effort to get the doors to shut. It's colder than usual in here. The seals were stiff)
Tuesday, January 31, 2023, 11:10: TP1B on.
Tuesday, January 31, 2023, 11:16: TP1B up to speed. TP1A on.
Tuesday, January 31, 2023, 11:24: TP1A timeout trip. Restarted @ 32 KRPM
Tuesday, January 31, 2023, 11:25: TP1A up to speed. IG1 n. Vacuum @ 1.51e-05T & dropping.
Tuesday, January 31, 2023, 13:34: Vacuum @ 2.08e-06T.
Tuesday, January 31, 2023, 13:36: FS#5 opened. PS on.
Tuesday, January 31, 2023, 13:46: Auto-ramping TGHT / TBHT to 10 A / 10 A @ 2 A per min.
Tuesday, January 31, 2023, 15:35: Auto-ramp TGHT / TBHT to 100 A / 50 A @ 2 A per min.
Tuesday, January 31, 2023, 19:02: Vacuum @ 7.92e-07T. Auto-ramping TGHT / TBHT to 350 A & 150 A @ 2 A per min.
Wednesday, February 01, 2023, 06:16: Vacuum @ 5.75e-07T. Auto-ramping TGHT / TBHT to 580 A & 230 A @ 2 A per min.
Wednesday, February 01, 2023, 19:44: Vacuum @ 1.08e-06T. Auto-cooling TGHT / TBHT @ 2 A per min.
Thursday, February 02, 2023, 07:34: Sources off. Turbo pumps off.
|
Thursday, February 02, 2023, 12:44, Aaron Schmidt, , LP-SIS, , , 44062-1-SK , 45235-1, In progress, Conditioning UC#x assembly
|
SK Series of LP-SIS targets are for conditioning only.
Thursday, February 02, 2023, 12:41: Roughing.
Thursday, February 02, 2023, 12:43: BV1A open.
Thursday, February 02, 2023, 13:30: TP1B on.
Thursday, February 02, 2023, 13:34: TP1B at speed. TP1A on.
Thursday, February 02, 2023, 13:43: TP1A at speed. IG1 on.
Thursday, February 02, 2023, 14:53: Waterlines opened. Vacuum Ok @ 5.38e-06T.
Thursday, February 02, 2023, 14:55: PS / Sources on. Manually tap up TGHT / TBHT to 5 A. OK.
Friday, February 03, 2023, 06:32: Vacuum @ 6.56e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Monday, February 06, 2023, 07:39: Vacuum @ 8.36e-07T. Auto-cooling @ 2 A per min.
Tuesday, March 28, 2023, 13:45: Power / sources off.
Tuesday, March 28, 2023, 13:47: IG1 off. TP1A & TP1B off.
Wednesday, March 29, 2023, 07:53: Venting. |
Tuesday, May 16, 2023, 14:00, Aaron Schmidt, Ta#65, LP-SIS, ITE, TM4, 45220-7, 45235-2, In progress, Conditioning Ta#65
|
Calibrated window installed on the beam line.
Tuesday, May 16, 2023, 13:45: Roughing both the chamber & beam line.
Tuesday, May 16, 2023, 14:00: TMS:TP6 on.
Tuesday, May 16, 2023, 14:04: TMS:TP2 on.
Tuesday, May 16, 2023, 14:13: IG6 on.
Tuesday, May 16, 2023, 14:17: TSG:TP1B on.
Tuesday, May 16, 2023, 14:23: TSG:TP1A on.
Tuesday, May 16, 2023, 14:33: IG1 on.
Tuesday, May 23, 2023, 07:30: Waterline FS#5 open. Vacuum stable @ 2.78e-07T
Tuesday, May 23, 2023, 07:32: Power / Sources on.
Tuesday, May 23, 2023, 07:35: Auto-ramping TGHT / TBHT to 230 A / 230 A @ 2 A per min. IV4 open.
Tuesday, May 23, 2023, 07:38: Optics are set.
Tuesday, May 23, 2023, 11:38: Auto-ramping TGHT to 300 A @ 2 A per minute.
Tuesday, May 23, 2023, 12:32: Auto-ramping TGHT to 350 A @ 2 A per minute.
Tuesday, May 23, 2023, 13:13: Auto-ramping TGHT to 400 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:00: Auto-ramping TGHT to 450 A @ 2 A per minute.
Tuesday, May 23, 2023, 14:50: Auto-ramping TGHT to 500 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:07: Auto-ramping TGHT to 550 A @ 2 A per minute.
Tuesday, May 23, 2023, 16:51: Auto-ramping TGHT to 580 A @ 2 A per minute.
Tuesday, May 23, 2023, 17:35: TGHT at 580A with TBHT at 230A.
Tuesday, May 23, 2023, 21:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Begin wire & mass scans.
Tuesday, May 23, 2023, 22:03: Mass & wire scans complete.
Tuesday, May 23, 2023, 22:09: BIAS / EE / EZL @ 0 kV.
Wednesday, May 24, 2023, 13:48: Auto-ramping TGHT to 550 A and TBHT to 200A @ 2 A per minute.
Currently at TGHT to 500 A and TBHT to 150A. 15:44 pm
Wednesday, May 24, 2023, 15:44: Auto-ramping TGHT to 450 A and TBHT to 100A @ 2 A per minute.
Wednesday, May 24, 2023, 17:22: Auto-ramping TGHT to 400 A and TBHT to 50A @ 2 A per minute.
Thursday, May 25, 2023, 07:49: TGHT / TBHT @ 0A (Reached before midnight - But not logged). IV4 closed.
Thursday, May 25, 2023, 09:04: Power / Sources off.
Thursday, May 25, 2023, 09:06: IG1 off. TP1B & TP1A off.
|
Thursday, July 13, 2023, 18:29, Aurelia Laxdal, , LP-SIS, , , , , In progress, Spectrometer tests
|
Pumping down: TS loaded with a LP-SIS container for spectrometer test.
Started heating up the target container: up to 300A.
Last week: the LP container was heated up to TGHT 580A and TBHT 230A, and cooled down before the weekend.
Pumping again (LP container in) for one more check. Last check was completed on July 26: up to 400A.
Vented the chamber today (July 27).
Did another test over the weekend. Currently the PSs are off and the chamber under vacuum. |
Wednesday, August 09, 2023, 14:29, Aaron Schmidt, , LP-SIS, , , 45220-6, 45235-3, In progress, Graphite target test 1 (C2023A)
|
Graphite experiment 2: ID Gr-230601, WO#45220-6 ( https://elog.triumf.ca/TIS/Evaporator_2/598 )
Original disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.
Wednesday, August 09, 2023, 14:00: Roughing.
Wednesday, August 09, 2023, 14:10: TP6 & TP2 beamline side. On.
Wednesday, August 09, 2023, 14:15: IG6 on.
Wednesday, August 09, 2023, 14:29: TP1B on.
Wednesday, August 09, 2023, 14:38: TP1A on.
Wednesday, August 09, 2023, 14:46: No trips. IG1 on. Vacuum @ 6.08e-05T & dropping.
Wednesday, August 09, 2023, 14:48: Waterline FS#5 open. Vacuum @ 4.45e-05T & dropping.
Wednesday, August 09, 2023, 16:10: HV rack grounded.
Wednesday, August 09, 2023, 16:16: BIAS / EE / EZL @ 1 / -0.5 / 0.5 kV. ok
TGHT / TBHT tapped up to 5 / 5 A. ok
Wednesday, August 09, 2023, 16:17: TGHT / TBHT Tapped back to 0 A. IV4 open. Vacuum @ 7.03e-06T.
Thursday, August 10, 2023, 05:16: Auto-ramping TGHT / TBHT to 150 / 150 A @ 1 A per minute.
Thursday, August 10, 2023, 05:24: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, August 10, 2023, 05:26: FC0 out. MB1 set to -2508 to -2510 G. FC6 Auto range & Log10 green.
Thursday, August 10, 2023, 09:08: Pyrometer set on end cap. Slope set to 1.000. Temperature not yet displayed.
Thursday, August 10, 2023, 09:13: Auto-ramping TGHT / TBHT to 200 / 200 A @ 1 / 2 A per minute. (TBHT rate change confirmed)
Thursday, August 10, 2023, 10:17: Auto-ramping TGHT / TBHT to 230 / 230 A @ 1 / 2 A per minute.
Thursday, August 10, 2023, 10:48: Slope set to 0.99. Temperature @ 1109.8C. TGHT / TBHT @ 230 / 230 A.
Thursday, August 10, 2023, 10:58: Auto-ramping TGHT to 250 @ 1 A per minute.
Thursday, August 10, 2023, 11:20: TGHT @ 250 A. Mass scan taken to check for Na. Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225"
Thursday, August 10, 2023, 11:25: Auto-ramping TGHT to 250 @ 1 A per minute. Slope set to 0.98. Temperature @ 1215.5C.
Thursday, August 10, 2023, 12:00: Slope set to 0.97. Temperature @ 1339.7C.
Thursday, August 10, 2023, 12:12: Slope set to 1.00. Temperature @ 1340.1C.
Thursday, August 10, 2023, 12:15: Swept masses 30-19. Peak on 20-22. Magnet set to peak @ -2465 to -2467 G. Mass "22.225 - 22.235" again.
Thursday, August 10, 2023, 12:24: Auto-ramping TGHT to 350 @ 1 A per minute.
Thursday, August 10, 2023, 13:50: Slope set to 0.93 from 1. Temperature @ 1576.0 C. (Note: Was at 1466 C while at 1)
Thursday, August 10, 2023, 13:52: Auto-ramping TGHT to 400 @ 1 A per minute.
Thursday, August 10, 2023, 14:23: Steerers TSG:CBC dropped to 0V. Reset to 500 V.
Thursday, August 10, 2023, 14:52: Masscorr - Link to all:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/
Link to this test:
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-14-51%20Graphite%2045220-6
Thursday, August 10, 2023, 14:57: Auto-ramping TGHT to 450 A @ 1 A per min.
Thursday, August 10, 2023, 16:12: TGHT @ 450A. Mass scan taken. Swept mass 45 to 4.
http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-21%20Graphite%2045220-6 - dn
Thursday, August 10, 2023, 16:43: graphitetesting.stp data dump to http://isacwserv.triumf.ca/onlylocal/isactdata/isactdata/2023-08-10-16-38-Graphite-25220-6 -dn
Mass scan taken. swept mass from 150 to 4. http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-10-16-45%20Graphite%2045220-6 -dn
Thursday, August 10, 2023, 16:58: moved magnet back to Na at -2441.4G. - dn
Thursday, August 10, 2023, 17:08: ramping TBHT and TGHT down at 1A/min
Monday, August 14, 2023, 08:15: HV off.
Monday, August 14, 2023, 08:46: Power / Sources off.
Monday, August 14, 2023, 08:47: IG1 & turbo pumps off.
Monday, August 14, 2023, 10:12: Venting. |
Monday, August 14, 2023, 12:11, Aaron Schmidt, , LP-SIS, , , 45220-11, 45235-3, , Graphite target test 2 (C2023B)
|
Graphite experiment insert 1: ID GR-230515, WO#45220-11. https://elog.triumf.ca/TIS/Evaporator_2/622
New disc form. End caps expanded, no Re foil installed. 4 heat shields wrapped around the oven.
Monday, August 14, 2023, 12:04: Roughing.
Monday, August 14, 2023, 13:09: TP1B on.
Monday, August 14, 2023, 13:16: TP1A on.
Monday, August 14, 2023, 13:24: IG1 on.
Monday, August 14, 2023, 13:31: Power / Sources on.
Monday, August 14, 2023, 13:33: Waterline FS#5 open. Vacuum @ 2.03e-05T & dropping. OK.
Monday, August 14, 2023, 14:58: IV4 open.
Monday, August 14, 2023, 14:59: Optics set.
Monday, August 14, 2023, 15:00: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. ok
TGHT / TBHT tapped up to 5 / 5 A. ok . Vacuum @ 4.53e-06T.
Tuesday, August 15, 2023, 05:29: Auto-ramping TGHT / TBHT to 150 / 150 A @ 1 / 2 A per min. Vacuum @ 7.33e-07T
Tuesday, August 15, 2023, 05:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, August 15, 2023, 05:39: FC0 out. Magnet set to@ -2465 to -2467 G. Mass "22.225 - 22.235".
Tuesday, August 15, 2023, 07:29: Slope set to 1.00 on the pyrometer. Sighted on end cap. No temperature noted as yet. Signal of 3.21e-09 A on FC6. TGHT / TBHT @ 114.0 / 151.1 A.
Tuesday, August 15, 2023, 07:46: Mass scan on masses range 30 - 17 to find optimal peak.
Tuesday, August 15, 2023, 07:53: Mass 35.2 @ 1.05e-08 A on FC6
Tuesday, August 15, 2023, 07:59: Magnet set to -2406.9 to -2409.1 G. Mass "21.194 - 21.224". FC6 @ 7.36e-09.
Tuesday, August 15, 2023, 08:23: TGHT / TBHT @ 150 / 150 A
Tuesday, August 15, 2023, 08:21: Magnet set to -2419.77 to -2420.64. Mass "21.411 - 21.4396". FC6 @ 3.56e-09 A.
Tuesday, August 15, 2023, 08:24: Auto-ramping TGHT / TBHT to 200 / 200 A @ 1 / 2 A per min. Vacuum @ 7.24e-07T.
Tuesday, August 15, 2023, 09:35: Auto-ramping TGHT / TBHT to 230 / 230 A @ 1 / 2 A per min.
Tuesday, August 15, 2023, 10:16: TGHT / TBHT @ 230 / 230 A. Take a full range mass scan. Mass 5 - 150.
Tuesday, August 15, 2023, 10:32: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-10-30%20Graphite%2045220-11%20at%20230%20A
Tuesday, August 15, 2023, 10:35: Magnet set to -2406.64 to -2409.1. Mass "21.187 - 21.219". FC6 @ 6.79e-11 A.
Tuesday, August 15, 2023, 10:39: Auto-ramping TGHT to 237 A @ 1 A per min. (monitor throughout)
Tuesday, August 15, 2023, 10:53: Auto-ramping TGHT to 250 A @ 1 A per min.
Tuesday, August 15, 2023, 11:14: Auto-ramping TGHT to 300 A @ 1 A per min.
Tuesday, August 15, 2023, 12:11: Auto-ramping TGHT to 350 A @ 1 A per min. Check FC0 periodically.
Tuesday, August 15, 2023, 13:13: Slope set to 0.93. Auto-ramping TGHT to 397 A @ 1 A per min.
Tuesday, August 15, 2023, 14:09: Auto-ramping TGHT to 400 A @ 1 A per min.
Tuesday, August 15, 2023, 14:18: Auto-ramping TGHT to 450 A @ 1 A per min.
Tuesday, August 15, 2023, 15:32: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-15-31%20Graphite%2045220-11%20at%20450%20A
Tuesday, August 15, 2023, 16:21: http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2023-08-15-16-19%20Graphite%2045220-11%20at%20450%20A
|
|