879
|
Wednesday, June 09, 2021, 14:31 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Install MB1 window & 9 pin for V test. | Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing. |
|
|
880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing |
|
|
881
|
Wednesday, June 23, 2021, 12:24 |
Aaron Schmidt | SiC#40 | HP-SIS | ITE | TM4 | 42218-8 | 43515-8 | In progress | SiC#40 Conditioning-2 | Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on. |
|
|
882
|
Friday, June 25, 2021, 11:18 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44691-4 | 44378-4 | Done | Ta#62 Conditioning - New | Replacement Ta target for the previous
one (44139-10) https://elog.triumf.ca/TIS/Test-Stand/880
Friday, June 25, 2021, 11:16: Roughing. |
|
|
901
|
Monday, October 04, 2021, 15:38 |
Aaron Schmidt | | LP-IG-LIS | ITE | TM4 | | 42132-7 | In progress | Conditioning UC#35 IG-LIS HS | Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08:
TP1B on. |
|
|
906
|
Friday, November 12, 2021, 13:01 |
Aaron Schmidt | Ta#63 | LP-SIS | ITE | TM4 | 44691-11 | 44378-12 | In progress | Conditioning Ta#63 | Friday, November 12, 2021, 13:01: BV1B
open. Roughing.
Friday, November 12, 2021, 13:05: |
|
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
|
926
|
Wednesday, May 11, 2022, 10:05 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | | P2N assembly conditioning - 3 | Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on |
|
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
|
931
|
Wednesday, June 08, 2022, 10:01 |
Aaron Schmidt | Ta#64 | LP-SIS | ITE | TM4 | 44691-12 | 44378-13 | In progress | Conditioning Ta#64 & HV Test. | Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing. |
7x |
|
934
|
Thursday, June 23, 2022, 11:00 |
Aaron Schmidt | SiC#44 | HP-FEBIAD | ITE | TM4 | 37978-1 | 44378-24 | In progress | Conditioning SiC#44 | Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open. |
|
|
940
|
Tuesday, September 27, 2022, 07:55 |
Aaron Schmidt | C#4 | LP-SIS | ITE | TM4 | 44691-3 | 44378-23 | In progress | Conditioning C#4 w/ thermocouples | Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X |
|
|
944
|
Tuesday, November 15, 2022, 11:24 |
Aaron Schmidt | UC#41 assembly | LP-SIS | ITE | TM4 | 45220-8 | 45235-4 | In progress | Conditioning UC#41 assembly | LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00: |
|
|
960
|
Wednesday, March 29, 2023, 12:22 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-7 | 45235-20 | Failed | Conditioning TiC#5 | Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on. |
|
|
963
|
Wednesday, April 26, 2023, 08:46 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-6 | 45235-20 | | Testing TiC#5 assembly w/ an empty target | Anode remade with a ceramic "elbow-cube".
Empty target oven in use for testing.
Wednesday, April 26, 2023, 08:44: |
|
|
964
|
Monday, May 01, 2023, 14:31 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-5 | 45235-20 | In progress | Conditioning TiC#5 | New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B |
|
|
966
|
Tuesday, May 09, 2023, 10:40 |
Aaron Schmidt | SiC#45 | HP-SIS | ITE | TM4 | 44692-3 | 45235-8 | In progress | Conditioning SiC#45 | Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. |
|
|
967
|
Tuesday, May 16, 2023, 14:00 |
Aaron Schmidt | Ta#65 | LP-SIS | ITE | TM4 | 45220-7 | 45235-2 | In progress | Conditioning Ta#65 | Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing |
|
|
1002
|
Tuesday, April 09, 2024, 16:01 |
Aaron Schmidt | Empty (Online) | LP-FEBIAD | ITW | TM4 | 45447-24 | 42972-8 | In progress | Conditioning empty FEBIAD for online use | Tuesday, April 09, 2024, 15:25: Roughing.
Wednesday, April 10, 2024,
05:41: TP1B on. |
|
|