  Test-Stand, Page 29 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2Thermocouples installed (X):
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx 
  951   Friday, December 16, 2022, 10:32 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 3Thermocouples installed (X):
O - O
O - Anode
  
  955   Thursday, January 12, 2023, 09:04 Aaron Schmidt LP-SIS  44691-1444378-20In progress Test for Aurelia L. Empty LP-SIS w/ end
caps in. Right side expanded.
Thermocouples installed (R - L):
  
  956   Monday, January 16, 2023, 16:02 Aaron Schmidt HP-FEBIAD-CTL    In progressHP-FEBIAD testsExtra wraps of foil around the center block
(6) + 3 full wraps around the shield.
Monday, January 16, 2023, 15:40:
  
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  959   Thursday, February 02, 2023, 12:44 Aaron Schmidt LP-SIS  44062-1-SK 45235-1In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41:
  
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  
  962   Monday, April 17, 2023, 14:08 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Monday, April 17, 2023, 14:03: Roughing.
Monday, April 17, 2023, 14:08: BV1A
open.
  
  964   Monday, May 01, 2023, 14:31 Aaron SchmidtTiC#5LP-FEBIADITETM444692-545235-20In progressConditioning TiC#5New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B
 TiC#5_-_44692-5_Anode_&_Coil_checks.docxTiC#5_-_44692-5_Conditioning.docx 
  965   Friday, May 05, 2023, 06:49 Aaron SchmidtTiC#6HP-FEBIADITWTM244692-1045235-12In progressConditioning TiC#6Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B
 TiC#6_Anode_&_Coil_checks.docx 
  966   Tuesday, May 09, 2023, 10:40 Aaron SchmidtSiC#45HP-SISITETM444692-345235-8In progressConditioning SiC#45Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B
on. 
 SiC#45_Conditioning..docx 
  967   Tuesday, May 16, 2023, 14:00 Aaron SchmidtTa#65LP-SISITETM445220-745235-2In progressConditioning Ta#65Calibrated window installed on the beam
line.
Tuesday, May 16, 2023, 13:45: Roughing
 Ta#65_conditioning_-_Mass_&_wire_scans.docx 
  969   Wednesday, May 31, 2023, 15:19 Aaron SchmidtSiC#46HP-SIS  44692-245235-6In progressConditioning SiC#2023A (Spare, renamed SiC-23B) - No salts(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.

Thursday, June 01, 2023,
 SiC#2023A_-_No_Salts.docx 
  971   Thursday, July 06, 2023, 16:55 Aaron SchmidtNb#10LP-IG-LISITWTM245447-742132-2In progressConditioning Nb#10Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on.
 Nb#10_Conditioning.docx 
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  975   Wednesday, August 09, 2023, 14:29 Aaron Schmidt LP-SIS  45220-645235-3In progressGraphite target test 1 (C2023A)Graphite
experiment 2: ID Gr-230601, WO#45220-6 (
 Graphite_target_45220-6.docxGraphitetesting_Aug102023.xlsx 
  978   Friday, August 25, 2023, 17:21 Aaron SchmidtNb#11LP-IG-LISITWTM245447-942132-4In progressConditioning Nb#11Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum
 Nb#11_Conditioning.docx 
  982   Tuesday, October 10, 2023, 15:46 Aaron SchmidtTa#68 (Spare)LP-SIS  45220-345235-11In progressConditioning Ta#68 (Spare)Tuesday, October 10, 2023, 15:18: Roughing.
Tuesday, October 10, 2023, 15:46:
TP1B on.
 Ta#68-Spare_Conditioning.docx 
  983   Wednesday, October 18, 2023, 15:43 Aaron Schmidt LP-SIS  45447-1245235-17In progressConditioning UC#43 (empty) w/ gas lineThermocouples attached on end plate
Indium salt @ 10 µl
3 wraps of Ta HS on oven. Gas line
 UC#43_Conditioning_empty_with_Gas_mod.docxUC#43_HS_with_gas_line_mod_-_Test_2.docxUC#43_HS_with_gas_line_mod_-_HV_Test.docx 
  984   Monday, October 30, 2023, 16:01 Aaron Schmidt LP-SIS  45220-245235-13In progressHV power surge test plus mass scans Monday, October 30, 2023, 16:00 
Roughing

Tuesday, October 31, 2023,
  