  695   Thursday, November 08, 2018, 10:54 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps

Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.

Thursday, November 08, 2018, 10:52: Roughing

Thursday, November 08, 2018, 10:53: Doors sealed.

Thursday, November 08, 2018, 14:10: Turbo pumps started.

Thursday, November 08, 2018, 14:15: Ion gauge on.

Thursday, November 08, 2018, 14:23: RGA on.


Friday, November 09, 2018, 07:38: Waterlines opened. No response on RGA. Vacuum ok @ 5.18e-07T

Friday, November 09, 2018, 07:44 : Slowly start opening gas lines. Opened / closed SV5 initially, no response. Note* Opened SV3 with SV5 closed. Massive spike seen in vacuum.

Friday, November 09, 2018, 07:55 : SV3 opened / closed in conjunction with SV5 until stable vacuum reached. Begin opening SV4 w/ SV5 closed.

Friday, November 09, 2018, 08:09 : SV3 & SV4 opened with SV5, Stable vacuum reached. Begin opening SV2/SV1 w/ SV5 closed.

Friday, November 09, 2018, 08:15: All gas lines opened. Sources on.

Friday, November 09, 2018, 08:22: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. Optics switched on.

Friday, November 09, 2018, 08:40: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min. Loop to max values, increase of 0A until vacuum gets below 1.0e-06T. Vacuum 1.12e-06T.

Friday, November 09, 2018, 10:45: The vacuum wouldn't drop below 1.12e-06T. Ramping halted and gas lines closed. Vacuum dropped to 7.48e-07T. Gas lines opened again. Vacuum stable around 1.12e-06T. Significant Argon noted on RGA.

Friday, November 09, 2018, 10:52: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2A per min. Vacuum increment limit increased to 2.0e-06T


Tuesday, November 13, 2018, 08:32: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Tuesday, November 13, 2018, 11:08: Mass scans ok. Auto-ramping TBHT to 330 A @ 2A per min.

FM

Tuesday, November 13, 2018, 16:44: The anode drain current has increased 17mA since 11:23 am, however FC0 is still decreasing. I will keep monitoring to see if the behaviour of the anode drain current continues once FC0 has stabilized. If the anode drain current keeps increasing maybe we will observe the same failure from the previous FEBIAD.


FM

Wednesday, November 14, 2018, 11:02 FC0 is stable but the anode drain current is still increasing and now is at 85 mA. It started at ~52mA. From the strip tool it seems to be a 2-hour period where the anode drain current is stable.

Wednesday, November 14, 2018, 16:14 : Magnet tune for 40Ar. TMS:MB1=101.56126 A

Coil=50 A. FC6=19.37 nA

Wednesday, November 14, 2018, 16:16 : Closing Neon valve.

Wednesday, November 14, 2018, 16:26 : FC6=13.77 nA.

Wednesday, November 14, 2018, 16:27: Closing Argon valve 

Wednesday, November 14, 2018, 17:10: 0.119 nA.

Wednesday, November 14, 2018, 17:15 Assuming the 720 nA from Brad (I will recompute this value based on the new bottles). Efficiency with both gasses open= 2.67375% . Efficiecy with Argon bottle only=1.84%. Anode drain current~87.5mA

 Wednesday, November 14, 2018, 17:53: When opening the Neon valve, the vacuum reached ~1e-5 T and the test stand tripped. Ion source off, high voltage and some of the optics as well. Leaving the test stand as is. 

Wednesday, November 14, 2018, 17:58: Note to myself: How am i gonna take an efficiency measurement if every time I turned the gas valves the vacuum will increase to 1e-5 T. 


Thursday, November 15, 2018, 08:33: Sources at zero. Bring values to 0 before restarting. Reset optics.

Thursday, November 15, 2018, 08:45: Power to sources off. Open the back & double check gas bottles. All are tight.

Thursday, November 15, 2018, 09:35: All gas bottles opened.

Thursday, November 15, 2018, 09:58: Power/sources reset/on.

Thursday, November 15, 2018, 10:04: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. 

Thursday, November 15, 2018, 10:05: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Thursday, November 15, 2018, 10:07: Optics reset.

FM

 Thursday, November 15, 2018, 18:46: Coil to 50 A. 


Friday, November 16, 2018, 08:40: Emittance Rig reset & calibrated.

 FM

Friday, November 16, 2018, 11:30 : Auto-ramping  TBHT to 310 A @ 1A per min.

Friday, November 16, 2018, 16:28 Friday, November 16, 2018, 16:28 : Gain in FC0 seems off. Reading on FC0 was 2.8e-8A but reading on FC6 was 4.5e-8A. In the last mass scan, I add up the highest peaks above 1e-9A  and the values was roughly 7e-8A. Switching the gain to 94uA in FCO shows 8.32e-8 A. This seems a better reading than before.

Friday, November 16, 2018, 16:30 Changing gacin on FC0 from 1 uA to 94 uA.


FM

Monday, November 19, 2018, 09:34 : Scanning from 0-450 V and recording Anode drain current.

IG1 reading is 3.01e-6 T.

Monday, November 19, 2018, 10:01 : When Moving away FC0, the optics goes yellow. Not sure which interlock is activated.

AS

Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.

Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times. 

Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart. 

Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.

Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.

Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted.

  700   Wednesday, December 12, 2018, 13:22 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressAnode leak current check.

Wednesday, December 12, 2018, 13:15: Power / Sources on.

Wednesday, December 12, 2018, 13:20: RGA on / set.

Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.

Wednesday, December 12, 2018, 13:30: Auto-ramping TGHT / TBHT to 10A @ 2A per min.

Wednesday, December 12, 2018, 13:36: IV4 open.

Wednesday, December 12, 2018, 13:37: Begin Anode check

Anode: 10 V. Current: 0.000 mA

Anode: 25 V. Current: 0.000 mA

Anode: 50 V. Current: 0.000 mA

Anode: 75 V. Current: 0.000 mA

Anode: 100 V. Current: 0.000 mA

Anode: 125 V. Current: 0.000 mA

Anode: 150 V. Current: 0.000 mA

Anode: 200 V. Current: 0.000 mA

Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:42: Coil to 10A. Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:43: Coil to 25A. Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:56: Auto-ramping TGHT / TBHT to 150A @ 2A per min.

Wednesday, December 12, 2018, 14:09: Auto-ramping halted @ 35A. Anode to 0 V. Monitor activity on FC0. 5 minutes.

Wednesday, December 12, 2018, 14:13: No changes observed on FC0. Anode back to 250 V.

Wednesday, December 12, 2018, 14:14: Auto-ramping TGHT / TBHT to 150A @ 2A per min.

Wednesday, December 12, 2018, 14:31: Optics all reset. 


Thursday, December 13, 2018, 07:31: Auto-ramping TGHT / TBHT to 200A @ 2A per min.

Thursday, December 13, 2018, 10:04: Auto-ramping TGHT / TBHT to 250A @ 2A per min.

FM Thursday, December 13, 2018, 10:40 : Auto-ramping TGHT / TBHT to 270A @ 2A per min.

FM Thursday, December 13, 2018, 12:44: Auto-ramping TGHT / TBHT to 290A @ 2A per min. 

FM Thursday, December 13, 2018, 12:56: FC0 gain set to 33nA

FM Thursday, December 13, 2018, 16:54: Anode drain current register at 310. Value was 1 mA. The resistor calculates is 30kOhm. Which is close to what was measured on the resistor on top 34kOhm.

With this new information. I will let the TBHT@290A and the TGHT@300A overnight.

Note to Aaron: Could you please heat up the target to 580A with the current settings we have.


Friday, December 14, 2018, 07:04:  Auto-ramping TGHT 580A @ 2A per min. TBHT remains @ 290 A. FC0 back in.

Friday, December 14, 2018, 14:15: Anode @ 250 V & 12.201 mA.

Friday, December 14, 2018, 14:22: BIAS /  EZL / EE to 0 V. Anode remains unchanged.

FM Friday, December 14, 2018, 18:04: TBHT down to 50. Anode drain current is still 12.21mA.

FM Friday, December 14, 2018, 18:05 Auto-cooling. i will keep monitoring the strip tools remotely.

  703   Tuesday, January 08, 2019, 08:11 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS restart

Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.

Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on

TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted

TMS:IG6 - Filament switched on controller.

TSG:IG1 - Filament switched over. Cable to ion gauge is burnt. Black wire inside the housing had melted along with the edges of the plastic. Replaced the entire cable & reconnected the ion gauge to the controller.

Tuesday, January 08, 2019, 08:48: IG6 & IG1 operation resumed. Vacuum pump down continued.

Tuesday, January 08, 2019, 08:55: FS5 waterline tightened for leak check. All lines closed.

Tuesday, January 08, 2019, 09:03: RGA restarted/on.

Tuesday, January 08, 2019, 09:05: Opening waterlines. vacuum at 2.66e-06T. Control room notified.

Tuesday, January 08, 2019, 09:10: Waterlines opened. Vacuum @ 2.57e-06T. No response on RGA.

Tuesday, January 08, 2019, 09:14: No leak noted on the FS#5 paddle wheel. Fixed with tightening.

Tuesday, January 08, 2019, 09:20: Control room noted 7.6L fill (1/4" drop approx) in DI water on this line. (Note this next year)

  716   Friday, April 05, 2019, 07:02 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS operation test - LP FEBIAD

Due to previous issues, a full run / test should be performed on the ISAC Test Stand.

Friday, April 05, 2019, 07:00: RGA on.

Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable.

Friday, April 05, 2019, 07:14: Gas lines open.

Friday, April 05, 2019, 07:16: Power / sources on. Vacuum down to 1.25e-06T

Friday, April 05, 2019, 07:18: Optics on & Set.

Friday, April 05, 2019, 07:19: IV4 Opened.

Friday, April 05, 2019, 07:21: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min

Friday, April 05, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200 V.

Friday, April 05, 2019, 09:40: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min 

Friday, April 05, 2019, 14:01: Beam on FC0 & wire scans. Mass scan provides no reading. (Max current after CONST2 has changed). Inquire why.

No sparks have occurred on this run. Operationally, appears the PS switches were effective.

Friday, April 05, 2019, 14:05: Begin auto-cooling @ 2A per min.

Friday, April 05, 2019, 14:56 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.


Monday, April 08, 2019, 06:57: RGA off. Gas lines closed. IV4 Closed.

Monday, April 08, 2019, 07:01: Power / Sources off.

Monday, April 08, 2019, 07:01: IG1 off. Turbo pumps off.

Monday, April 08, 2019, 08:11: Venting.

Attachment 1: TS_-_New_BIAS__EZL_Testing_-_2019.docx
Attachment 2: TS-2019-04-05-07-00.rga
  719   Friday, April 26, 2019, 13:45 Aaron SchmidtTa#58LP-SISITETM243044-442972-7In progressConditioning Ta#58 HS

Friday, April 26, 2019, 13:43: Roughing.

Friday, April 26, 2019, 14:12: Turbo pumps on.

Friday, April 26, 2019, 14:58: RGA on.


Monday, May 06, 2019, 07:05: RGA restarted.

Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.

Monday, May 06, 2019, 07:16: Power / sources on.

Monday, May 06, 2019, 07:20: Optics set.

Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.

Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.

Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.8 5.52
 TBHT 25.7

7.93

 COIL + EE 25.6 1.92
 TGHT  25.70 6.29

 Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.

Monday, May 06, 2019, 09:47: RGA restarted. Updates?

RGA timed out around 10:30.

Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.

Monday, May 06, 2019, 11:27: RGA restarted.

Monday, May 06, 2019, 13:10: EZL to 14.3 kV

Monday, May 06, 2019, 14:48 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.4 7.78
 TBHT 27.0

10.30

 COIL + EE 26.8 3.01
 TGHT  27.1 7.09

 


Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.

Element Mass Mass/q Beam Current
Lithium 6.941 7.508 1.04401e-10
Sodium 22.9897 27.556 9.85687e-10
Mass 27 (Al) 26.9815 32.2943 2.97834e-08
Potassium 39.0983 46.3293 7.49146e-10
  (peak 2) 47.6191 1.568e-10
Rubidium 85.4678 100.355 2.79327e-10
  (peak 2) 102.904 1.04431e-10
Cesium 132.9055 156.6 8.6103e-10
  (peak 2) 162.532 2.4408e-10

The discrepancy appears to get larger the further we move along the masses.

Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.

Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.

Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.

Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.

Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.

Tuesday, May 07, 2019, 12:54: Turbo pumps off.

Tuesday, May 07, 2019, 14:00: Venting.

Attachment 1: Ta#58.docx
Attachment 2: TS-2019-04-26-14-56.rga
Attachment 3: TS-2019-05-03-11-21.rga
Attachment 4: TS-2019-05-06-07-05.rga
Attachment 5: TS-2019-05-06-09-47.rga
Attachment 6: TS-2019-05-06-10-57.rga
Attachment 7: ITE-TM2-Ta#58-LP-SIS_Test_Stand.docx
  720   Friday, May 03, 2019, 08:30 Anders Mjos      In progressTraining

Training: Venting and pump down

Friday, May 03, 2019, 08:30: Turbo pumps stopped.

  721   Tuesday, May 07, 2019, 13:16 Aaron SchmidtTa#58LP-SISITETM243044-4 In progress9-pin connection configuration (Using Ta#58)

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

Pins connected source tray side: 1, 4, 5, 6

ST 9-pin                       HV rack

Pin to L TGHT - 1 - Black / COM / 5

Pin to R TGHT - 6 - Red / 9

Pin to L TBHT - 4 - Black / COM / 2

Pin to R TBHT - 5 - Red / 1

Tuesday, May 07, 2019, 15:20: Roughing.

Turbo pumps switched on w/ Ion gauge around 4pm.


Wednesday, May 08, 2019, 08:05: Multi-meters tested & connected.

Wednesday, May 08, 2019, 08:09: Power / sources on.

Wednesday, May 08, 2019, 08:13: RGA on

Wednesday, May 08, 2019, 08:14: Auto-ramping TGHT / TBHT to 575 (580) / 230 A @ 2A per min.

Wednesday, May 08, 2019, 08:30: Voltage reading off on TBHT? Connection to source tray side is wrong.

Wednesday, May 08, 2019, 08:40: Halt auto ramping. Manually tap down TBHT / TGHT

Wednesday, May 08, 2019, 08:42: Sources /  RGA off.

Wednesday, May 08, 2019, 08:43: Turbo pumps off.

Wednesday, May 08, 2019, 10:40: Roughing.

Wednesday, May 08, 2019, 11:01: Turbo pumps on.

Wednesday, May 08, 2019, 13:10: Power / sources on. Vacuum @ 4.37e-06T

Wednesday, May 08, 2019, 13:19: Auto-ramping TGHT to 575 (580) A @ 2A per min. However, the vacuum is not quite ready. Increment value set to 3.000e-06T to ramp. Once the vacuum is reached, the heaters will start to ramp automatically.

Wednesday, May 08, 2019, 14:23: Auto-ramping ongoing successfully. TGHT @ 32A +. Vacuum @ 2.66e-06T


Thursday, May 09, 2019, 07:05: Auto-ramping TGHT to 575 (580) A @ 2A per min from 400 A.


Monday, May 13, 2019, 08:00: TSG:TP1A appears to have tripped over the weekend. (Around 7pm Saturday)

Closed IV4 / reset. Reset TP1A. Reset BV1A.  Turn on TP1A.

Monday, May 13, 2019, 08:32: TBHT & TGHT switched back on.

Ramped down around 10 PM.


Tuesday, May 14, 2019, 07:10: Power / RGA off.

Tuesday, May 14, 2019, 07:12: IV4 closed, Ion gauge & turbo pumps off.

Tuesday, May 14, 2019, 08:35: Waterlines purged. Venting.

Attachment 1: HV_Tests_2019_-_AL_-_1.docx
Attachment 2: TS-2019-05-08-08-12.rga
Attachment 3: TS-2019-05-08-14-20.rga
  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HS

Tuesday, May 14, 2019, 10:21: Roughing

Tuesday, May 14, 2019, 10:51: Turbo pumps on.

Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.


Wednesday, May 15, 2019, 08:42: Waterlines opened. Vacuum Ok @ 6.45e-07T. No response on RGA.

Wednesday, May 15, 2019, 08:58: Power / sources on.

Wednesday, May 15, 2019, 09:00: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Wednesday, May 15, 2019, 09:02: Optics set. IV4 open.

Wednesday, May 15, 2019, 09:09: BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV.

Wednesday, May 15, 2019, 09:10:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.34 5.24
 TBHT 26.28

8.23

 COIL + EE 26.11 2.18
 TGHT  26.21 6.44

Wednesday, May 15, 2019, 10:39: Abort auto-ramp. Significant out gassing note. Vacuum @3.12e-06T

TGHT /  TBHT @ 77 A. Hold until stable again. Effect noted similar to ZrC#7 ( https://elog.triumf.ca/TIS/Test-Stand/450 ). Resume Auto ramp in 1 hour to TGHT / TBHT 350 / 150 A.

Wednesday, May 15, 2019, 11:54: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.

Wednesday, May 15, 2019, 14:47: TGHT / TBHT @ 146 / 146 A. Ramping to 350 / 150 A overnight. 


Thursday, May 16, 2019, 07:30: Restarted RGA.

Thursday, May 16, 2019, 07:54: Mass scan taken albeit still ramping. TGHT / TBHT @ 280 / 150 A.

Thursday, May 16, 2019, 09:10: Ramping aborted @ TGHT / TBHT @ 285 (287.6) / 150 A. Allow for further out gassing.

Thursday, May 16, 2019, 13:22: Vacuum limit increased to 2.0e-06T. Vacuum @ 7.86E-07T.

Thursday, May 16, 2019, 13:23: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.


Tuesday, May 21, 2019, 07:03: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Tuesday, May 21, 2019, 12:30: TGHT Stopped at 557.2A. Readout at 578. Moved readout to 557. Readback @ 557.2A.


Wednesday, May 22, 2019, 07:09: TGHT was at voltage limit. The limit was increased. Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Wednesday, May 22, 2019, 07:32: TGHT 579.9 A / 8.051 V. 

Wednesday, May 22, 2019, 13:45: Masscorr calibration confirmed.

Wednesday, May 22, 2019, 13:51: Auto-cooling @ 2A per min.


Thursday, May 23, 2019, 13:27: Sources / Power off. RGA off.

Thursday, May 23, 2019, 13:31: IV4 Closed. Turbo pumps off.

Attachment 1: ZrC#8.docx
Attachment 2: TS-2019-05-14-11-05.rga
Attachment 3: TS-2019-05-16-07-30.rga
Attachment 4: TS-2019-05-21-07-10.rga
Attachment 5: ITE-TM2-ZrC#8-LP-SIS_Test_Stand.docx
  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source Tray

Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals on the water blocks.

Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK.

Saturday, May 25, 2019, 12:46: Roughing.

Saturday, May 25, 2019, 14:30: Turbo pumps started.

Saturday, May 25, 2019, 14:34: Ion gauge on.


Monday, May 27, 2019, 07:09: RGA on.

He Leak TEST #1:

Vacuum Group Leak detector LD#4.

08:39: Vacuum @ 1.58e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.36e-006

He: -1.05e-009

LD:  3.4e-07 atm-cc/sec

Monday, May 27, 2019, 08:50: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:00: Vacuum @ 1.60e-06T . RGA status:

Water: 2.33e-006

He: -4.89e-010

LD: 3.4e-07 atm-cc/sec. Purge and close FS#2.

Monday, May 27, 2019, 09:05: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:15: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted)

Water: 2.29e-006

He: -4.19e-009

LD: 3.6e-07 atm-cc/sec. Purge and close FS#3.

Monday, May 27, 2019, 09:26: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:35: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted, continued from FS#3)

Water: 2.25e-006

He: -7.36e-009

LD: 4.0e-07 atm-cc/sec. Purge and close FS#4.

Monday, May 27, 2019, 09:45: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:55: Vacuum @ 1.58e-06T. RGA status:

Water: 2.21e-006

He: -3.16e-010

LD:   4.2atm-cc/sec. Purge and close FS#5

Monday, May 27, 2019, 10:00: Depressurize lines. Connect HPA & Purge all lines. 

After 5 minutes: Vacuum @ 1.58e-06T . RGA status:

Water: 2.20e-006

He: -5.73e-010

LD: 4.3e-07 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Note: He spikes ongoing after opening line FS#3. Likely due to the use of rubber o-rings.

Monday, May 27, 2019, 10:51: Begin gradually opening the waterlines.

Monday, May 27, 2019, 10:54: Open FS#2. Vacuum @ 1.56e-06T. No Response on RGA.

Monday, May 27, 2019, 10:56: Open FS#3. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:00: Keiko stopped by. Soft restart done on PLC.

Monday, May 27, 2019, 11:04: Open FS#4. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:06: Open FS#5. Vacuum @ 1.58e-06T. No Response on RGA.

Waterlines Ok.

Prep to open gas lines.

Monday, May 27, 2019, 11:24: SV1 open w/ mini pump. Vacuum @ 1.49e-06T. No Response on RGA.

Monday, May 27, 2019, 11:25: Open SV3 & SV4 w/ mini pump. Vacuum @ 1.58e-06T. No Response on RGA. Allow 10 min.

Monday, May 27, 2019, 11:35: Mini pump switched off. SV1 Closed.

Monday, May 27, 2019, 11:37: Begin quickly opening and closing gas lines until the a stable vacuum is reached.

Monday, May 27, 2019, 11:40: Gas lines: SV3, SV4, & SV5 open.

Monday, May 27, 2019, 13:29: Power / Sources on.

Monday, May 27, 2019, 13:30: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.

Monday, May 27, 2019, 13:44: Open IV4.


Tuesday, May 28, 2019, 07:10: Gradually bring up HV to BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV in increments of 500 / 100 / 250

Tuesday, May 28, 2019, 07:22: Halted and brought back down. BIAS / EE / EZL @ 10 / -0.2  / 8.5 kV. Unusual current noticed on the EE. Only went to -200 V and the current increased to 1300uA. Typically at -1500V the current sits at 515uA.

Tuesday, May 28, 2019, 09:21: 50V added top Anode. EE current increases to 310.134uA. Odd. EE voltage increases affect the Anode current as well.

Tuesday, May 28, 2019, 09:22: Auto-cooling @ 4A per min.

Tuesday, May 28, 2019, 11:15: Power off. Gas lines closed.

Tuesday, May 28, 2019, 11:36: Connection discovered between Anode & EE. (Inside Vacuum). RGA off. IV4 closed.

Tuesday, May 28, 2019, 11:38: IG1 off. Turbos off.

Tuesday, May 28, 2019, 12:40: Venting

Tuesday, May 28, 2019, 15:02:

Short found on EE to Anode. Wires touching inside chamber. Fixed. Tubes touched to coil. No longer touching. Electrical check of source tray complete. Target re-installed.

Roughing.

Attachment 1: TM4_Source_Tray_-_2019_-_Leak_Check.docx
Attachment 2: TM4_Source_Tray_-_2019.docx
Attachment 3: TS-2019-05-27-07-08.rga
  725   Tuesday, May 28, 2019, 15:05 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressTM4 Source Tray - Episode II

SEE ELOG 724

Tuesday, May 28, 2019, 15:02: Roughing

Tuesday, May 28, 2019, 15:32: Turbos on.


Wednesday, May 29, 2019, 07:08: RGA on.

Wednesday, May 29, 2019, 07:10: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.32e-06T.

Power on.

Wednesday, May 29, 2019, 07:13: Mini-pump & manual valve opened. Prep / rough gas lines.

Alternate SV1, SV3, & SV4.

Wednesday, May 29, 2019, 07:27: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.

Wednesday, May 29, 2019, 07:32: Gas lines fully opened.

Wednesday, May 29, 2019, 07:37: Sources on.

Wednesday, May 29, 2019, 07:39: Anode to 50 V. No response on EE. EE to -100 V. Current response normal @ 34.188 uA.

Wednesday, May 29, 2019, 07:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode to 100 V. Coil to 10 A. Small sparks heard around 23 kV.

Wednesday, May 29, 2019, 07:54: IV4 opened.

Wednesday, May 29, 2019, 07:57: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.

Wednesday, May 29, 2019, 07:57: Spark* Computer screens flickered. RGA knocked out.

Wednesday, May 29, 2019, 08:00: Shut off & unplug the RGA.

Wednesday, May 29, 2019, 08:04: Optics set.

Wednesday, May 29, 2019, 08:23: Small spark* Nothing affected.

Wednesday, May 29, 2019, 08:35: Small spark* TSG:CBC restarted. 

Wednesday, May 29, 2019, 10:26: Small spark* TSG:CBC boosted from 500 V to 2501 V. Reset to 500 V. TPS:Q1 boosted from 790 / 675 V to 1500 / 1230 V. Reset.

Wednesday, May 29, 2019, 12:04: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min. Over 100 minutes spark free.

Wednesday, May 29, 2019, 12:14: Spark* Reset optics & TSG:CBC

Wednesday, May 29, 2019, 12:35: Note*: Gradual climb on EZL current noticed as ramping current climbs.  

Wednesday, May 29, 2019, 13:01: Spark* Reset optics & TSG:CBC 

Wednesday, May 29, 2019, 13:50: Spark* Reset optics & TSG:CBC. TSG:CBC was boosted from 500 V to 2501 V.

Wednesday, May 29, 2019, 13:54:  A small but notable out gassing event, without an audible spark occurred. Brief instability in BIAS voltage & current. Vacuum spike to over 3.0e-06T.

Wednesday, May 29, 2019, 14:01: Auto ramping TBHT to 290 A @ 2A per min. TGHT at 577 (580.4 A)

Wednesday, May 29, 2019, 14:15: Wire Scans taken. TMS:RPM0A (X Axis) revealed no beam / peak. TMS:RPM0B (Y Axis) revealed a beam peak. Will attempt to steer TMS:RPM0A (X Axis) until beam peak is revealed.

Wednesday, May 29, 2019, 14:49: Further tuning required. Optics (TPS) Q1, Q2, Q3, Q4 all adjusted. FEBIAD source side (TSG) CB1, VCB1, & CBC all adjusted. Small peak found on RPM0A (X Axis). TMS:RPM0B (Y Axis) revealed a beam peak

Mass scans have not been successful. Yet.

Wednesday, May 29, 2019, 15:00: BIAS / EE / EZL brought to 0 kV. Allow out gassing of the source tray & protect equipment overnight.


Thursday, May 30, 2019, 07:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV

Thursday, May 30, 2019, 07:55: Spark* Reset optics & TSG:CBC.

Thursday, May 30, 2019, 08:37: Spark* Tripped TMS:TP6 turbo pump. Closed IV4. Tripped & Boosted  TPS:Q1. Reset optics & TSG:CBC. Open IV4.

Thursday, May 30, 2019, 09:00: Spark* Visible inside TS on the back of the optics tray off one of the EZL wires. EZL current spiked 1440 uA. Voltage dropped and became unresponsive over 8.5 kV.

Thursday, May 30, 2019, 09:13: BIAS / EE / EZL brought to 0 kV. Anode to 0 V. Coil to 0 A.

EZL to 7000V - Current spikes to over 500 uA.

Thursday, May 30, 2019, 09:32: Auto-cooling @ 2 A per min.

Thursday, May 30, 2019, 09:41: Auto-cooling @ 3 A per min.

Thursday, May 30, 2019, 09:49: IV4 closed. Gas lines closed. All sources expect TGHT / TBHT off.


Thursday, May 30, 2019, 12:24: Halt auto-cooling. Sources on.

Thursday, May 30, 2019, 12:32: BIAS @ 20 kV.

Thursday, May 30, 2019, 12:34: BIAS @ 30 kV.

Thursday, May 30, 2019, 12:38: BIAS / EE @ 30 / -1.5 kV

Thursday, May 30, 2019, 12:42: BIAS / EE @ 39.5 / -2 kV. Two sparks* Shut off turbos

Thursday, May 30, 2019, 12:45: Turbo pumps TP6 & TP1B restarted. Optics reset.

Thursday, May 30, 2019, 12:51: BIAS / EE / EZL  @ 40 / -2 / 5.25 kV.  Spark* Shut off turbos / reset.

Thursday, May 30, 2019, 12:56: BIAS / EE / EZL  @ 41.5 / -2.5 / 7.5 kV.  Spark* Shut off turbos / Optics. Reset.

Thursday, May 30, 2019, 13:01: BIAS / EE / EZL  @ 45 / -2.5 / 7.5 kV.  Visible spark inside the vacuum* Shut off turbos / Optics. Reset.

Thursday, May 30, 2019, 13:26: BIAS / EE / EZL  @ 46.25 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, off multi-pin corner? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

Thursday, May 30, 2019, 13:38: Go pro setup

Thursday, May 30, 2019, 13:41: BIAS / EE / EZL  @ 48 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

*Spark seen by Carla on the back of multi-pin (Anode wire perhaps?).

Thursday, May 30, 2019, 13:52: BIAS / EE / EZL  @ 48.9 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

*Spark seen on the base of the EZL.

Thursday, May 30, 2019, 14:00: BIAS / EE / EZL  @ 50 / -2.5 / 7.5 kV.

Thursday, May 30, 2019, 14:07: Spark* No trips

Thursday, May 30, 2019, 14:15: BIAS / EE / EZL  @ 50 / -2.5 / 7.5 kV.  * Shut off turbos / Optics. Reset. FC0 affected. Reset.

Thursday, May 30, 2019, 14:24 BIAS / EE / EZL  @ 51.3 / -2.5 / 7.5 kV.  * Shut off TP6 / Optics. Reset. RPM6B affected, ran up & down on its own. Reset.

Thursday, May 30, 2019, 14:25: BIAS back to 50 kV.

Thursday, May 30, 2019, 14:31: BIAS / EE / EZL  @ 51.9 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, from source tray to the rear ground electrode plate * Shut off turbos / Optics. Reset. FC0 affected. Reset.

IG6 ion gauge & TMS TP6 tripped. Fix. Switched to filament 2.

Thursday, May 30, 2019, 14:43: BIAS / EE / EZL  @ 52.8 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Bottom corner of multi-pin bracket * Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.

Thursday, May 30, 2019, 14:54: BIAS / EE / EZL  @ 53.5 / -2.5 / 7.5 kV. Sparks*

Thursday, May 30, 2019, 14:59: BIAS / EE / EZL @ 54 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Source tray EE over insulators to ground (Matt got a video, really nice)* Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.

Thursday, May 30, 2019, 15:06: BIAS / EE / EZL @ 54.7 / -2.5 / 7.5 kV. Spark. Reset a bunch.

Thursday, May 30, 2019, 15:15: BIAS @ 55 kV.

Thursday, May 30, 2019, 15:24: BIAS / EE / EZL @ 0 kV.

Thursday, May 30, 2019, 15:24: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.


 Friday, May 31, 2019, 07:22: BIAS @ 10 kV. IV4 opened.

Friday, May 31, 2019, 07:33: BIAS / EE / EZL  @ 30 / -1.5 / 7.5 kV. Anode @ 200 V. Coil @ 20 A. FC0? No response.

Friday, May 31, 2019, 07:48: Coil @ 50 A. FC0 BIAS off. Troubleshoot FC0.

Friday, May 31, 2019, 08:01: Nothing on wire scans. FC0 randomly gaining, but no BIAS response. Rod N contacted on FC0.

Friday, May 31, 2019, 09:56: FC0 Fixed by Rod. N. MB1 acting up. Fixed itself through power / Canbus cycling?. Wire scans: RPM0A (X) non-responsive, RPM0B (Y) responds. Turn down HV to prep for gases.

Friday, May 31, 2019, 10:14: BIAS / EE / EZL / Anode @ 0 kV.

Friday, May 31, 2019, 10:18: Mini pump on. Manual valve opened. Prep / rough gas lines.

Alternate SV1, SV3, & SV4.

Friday, May 31, 2019, 10:31: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.

Friday, May 31, 2019, 10:36: Gas lines fully opened.

Friday, May 31, 2019, 10:48: Vacuum stable @ 1.25e-06T. HV sources back on.

Friday, May 31, 2019, 11:04: BIAS / EE / EZL  @ 30 / -1.5 / 8.25 kV. Anode @ 200 V. Coil @ 50 A.

Friday, May 31, 2019, 11:32: Spark knocked out Optics & Steering. Wire scanners to zero. Unable to pick up wire scan for X or Y.

Friday, May 31, 2019, 11:35: BIAS / EE / EZL  @ 30 / -2.0 / 7.5 kV.

Friday, May 31, 2019, 12:05: Tuning adjusted. RPM0A (X) no response. RPM0B (Y) Response (It's back!!!).

Friday, May 31, 2019, 12:13: But it sparked...* Reset Optics. Re-scan to recover. Wire scanners to zero. Unable to pick up wire scan for X.


Carla, Fernando, Matt K.

Friday, May 31, 2019, 12:33  Using Brad's tuning values we see a nice peak at the first set of wire scanners on the y axis but nothing on the x axis. Using CB2, went from 200V to 900V in steps of 100V and saw nothing on the x axis. This seems to indicate x axis scanner is broken. Proceeding without x axis readout. Also tried with CB1 steerers, same effect.

Friday, May 31, 2019, 13:30: Auto-ramping TBHT to 305 A @ 2 A per min.

Friday, May 31, 2019, 13:31: EZL @ 8 kV.

Friday, May 31, 2019, 13:36: Coil to 0 A.

Friday, May 31, 2019, 15:32: Successful wire scans across RPM0A & RPM0B (X,Y) and  RPM6B & RPM6A (Y,X).

Friday, May 31, 2019, 16:27 : Wire scanners after the magnet look ok, but not enough beam to do a good emittance scan. Raised the tube heater to 310 A set point, got about 0.5nA at FC6. Probably could be solved with tuning, to be done Monday. Turning everything off but leaving target heating on. See pasted screenshots for current tune on mass 28.


Monday, June 03, 2019, 07:35: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 10 A.

Monday, June 03, 2019, 07:38: Coil @ 30 A.

Monday, June 03, 2019, 07:41: IV4 opened.

Monday, June 03, 2019, 07:48: BIAS / EE / EZL @ 0 kV. A named Hossein Rafighi with IT began poking around the HV rack and running cable w/ permission reference to Dale Nagra. Locked it out. No work permit was issued. Main Control Room Contacted.

Monday, June 03, 2019, 08:03: Cable run complete. Lock off. Sources on again.

Monday, June 03, 2019, 08:23: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 30 A.

Monday, June 03, 2019, 08:35: BIAS / EE / EZL @ 40 / -2 / 8 kV

Monday, June 03, 2019, 08:40: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 08:41: BIAS @ 45 kV.

Monday, June 03, 2019, 08:45: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. Mass Magnet MB1 left off.

Monday, June 03, 2019, 08:55: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 08:58: BIAS / EE / EZL @ 50 / -2 / 8 kV.

Monday, June 03, 2019, 09:07 : Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 09:21: 2 Sparks* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 09:29: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. BIAS @ 54 kV.

Monday, June 03, 2019, 09:31: BIAS / EE / EZL @ 55 / -2.5 / 8 kV.

Monday, June 03, 2019, 09:35: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset

Monday, June 03, 2019, 09:44: Spark* Optics tripped. Turbo pumps  TP6 & TP1A Tripped. Close / re-open IV4. Reset

Monday, June 03, 2019, 09:49: Near BIAS 57.5 kV. Multiple sparks. BIAS unable to hold. Optics tripped, wire scanners & FC0 began running independently. Turbo pumps tripped.

Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*

Monday, June 03, 2019, 09:57: Spark* Reset Optics. Turn off Optics for now.

Monday, June 03, 2019, 10:19: Spark* Reset Optics & Wire scanners. Anode current dropped from 10.989 mA to 7.768 mA

Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT

The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.

Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.

Monday, June 03, 2019, 11:02: BIAS / EE / EZL / Anode @ 0 kV.

Monday, June 03, 2019, 11:36: TGHT PS determined to have failed. Run w/ TBHT and test up to 50 kV.

Monday, June 03, 2019, 11:41: Sources on.

Monday, June 03, 2019, 13:17: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Monday, June 03, 2019, 13:24: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.

Monday, June 03, 2019, 13:37: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Monday, June 03, 2019, 13:49: Odd sound from Turbo pump TP6?

Vacuum @ 1.13e-06T. Was in the 5e-07 range earlier. Strip tool revealing gradual increase.

Monday, June 03, 2019, 13:52: Spark* Optics tripped, wire scanners & FC0 running independently. Reset

Monday, June 03, 2019, 14:13: Spark* Optics tripped. Loud, outside vacuum chamber.

Monday, June 03, 2019, 14:55: BIAS / EE / EZL @ 0 kV. Anode to 0 V.


Tuesday, June 04, 2019, 08:40: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Tuesday, June 04, 2019, 08:54: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.

Tuesday, June 04, 2019, 09:09: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 09:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 10:21: Spark* Optics & Turbo pump TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 10:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Almost 1 hour of no sparks.

Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.

Tuesday, June 04, 2019, 10:32: BIAS / EE / EZL @ 51 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 10:39: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Tuesday, June 04, 2019, 11:02: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.

Tuesday, June 04, 2019, 11:07: Spark* Outside TS. IG6 tripped /  reset. BIAS current spike. EZL current dropped afterwards near 460 uA from 550 uA.

Tuesday, June 04, 2019, 11:22: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV.

Tuesday, June 04, 2019, 11:27: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.

Tuesday, June 04, 2019, 11:35: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 11:39: Spark* Optics tripped. Loud*, outside the vacuum chamber, above TS. EZL current jumped back up to 550 uA

BIAS current gradually increasing. from 50 uA to 55 uA since 11:35 spark.

Tuesday, June 04, 2019, 12:01: Runaway sparks* Turbo pumps & ion gauges tripped. Optics tripped. Wire scanners running independently. Both quiet & loud sparks. 3 Consistent marks in the strip tool. Reset.

Brought BIAS down to 55 kV. EE to -2.5 kV. BIAS & EZL currents have a small drop.

Tuesday, June 04, 2019, 13:21: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Over 1 hr no sparks.

Tuesday, June 04, 2019, 13:34: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Tuesday, June 04, 2019, 13:40: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.

Tuesday, June 04, 2019, 13:41: Spark* Optics & Turbo pump - TP6 tripped. Wire scanners and FC0 operated independently. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 13:46: Spark* Loud*, outside the vacuum chamber, above TS. EZL current jumped from 580 uA to 610 uA approx & is gradually increasing. BIAS current slowly decreasing.

Tuesday, June 04, 2019, 14:02: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV. Variation in EZL & BIAS currents noted.

Tuesday, June 04, 2019, 14:08: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.

Tuesday, June 04, 2019, 14:28: 20 minutes. No Spark.

Tuesday, June 04, 2019, 14:47: BIAS / EE / EZL @ 0 kV. Anode to 0 V.


Wednesday, June 05, 2019, 08:34: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Wednesday, June 05, 2019, 08:35: Coil down from 30 to 0 A.

Wednesday, June 05, 2019, 08:36: Open IV4.

Wednesday, June 05, 2019, 08:37: Optics on / reset.

Wednesday, June 05, 2019, 08:38: Anode to 400 V.

Wednesday, June 05, 2019, 08:44: Anode to 450 V. TBHT @ 305 A.

Wednesday, June 05, 2019, 11:15: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV. Anode @ 200 V.

Wednesday, June 05, 2019, 11:30: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Wednesday, June 05, 2019, 11:40: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Wednesday, June 05, 2019, 11:53: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:04: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber. bias to 54.9 kV.

Wednesday, June 05, 2019, 12:04: IV4 closed.

Wednesday, June 05, 2019, 12:15: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:16: Spark* Loud*, outside the vacuum chamber, above TS. EZL current came down from 601 uA to 537uA . IG6 off. Restarted. Bias to 54.9 kV.

Wednesday, June 05, 2019, 12:24: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:35: Spark* inside vacuum chamber. Optics & turbo pumps tripped

Wednesday, June 05, 2019, 13:35: Note* 1 hour @ 55 kV no sparks.

Wednesday, June 05, 2019, 13:42: BIAS / EE / EZL @ 56 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 13:49: BIAS / EE / EZL @ 57 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 13:52: TSG:CB1 went red. Communication lost it.

Wednesday, June 05, 2019, 13:54: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 14:01: Spark* inside vacuum chamber. Optics & turbo pumps tripped. Appears to be on the Anode. The test stand phone also redialed the last number contacted on its own.

Wednesday, June 05, 2019, 14:25: BIAS / EE / EZL @ 0 kV. Anode to 0 V. Auto-cooling @ 2 A per min.


Thursday, June 06, 2019, 09:10: Gas lines closed. Sources off. Optics off.

Thursday, June 06, 2019, 09:13: EE / BIAS on.

Thursday, June 06, 2019, 09:20: BIAS @ 30 kV.

Thursday, June 06, 2019, 09:30: BIAS @ 40 kV.

Thursday, June 06, 2019, 09:40: BIAS @ 45 kV. EZL slowly charging (Not on) from 12 to 420 V. EE with -15 V.

Thursday, June 06, 2019, 09:48: BIAS @ 50 kV. EZL / EE @ 606 / -17 V.

Thursday, June 06, 2019, 10:06:  BIAS @ 52.2 back to 50 kV. Loud buzzing heard up top. Charge on EZL from 600 V to 1200 - 2000 V fluctuations. EZL & EE to be brought up before we break something.

Thursday, June 06, 2019, 10:16: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Thursday, June 06, 2019, 10:27: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV.

Thursday, June 06, 2019, 10:39: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.

Thursday, June 06, 2019, 11:04: BIAS / EE / EZL @ 58 / -2.9 / 7.5 kV.

Thursday, June 06, 2019, 11:06: Buzzing / crackling up top in the cage again. Unstable voltage drops. BIAS to 57 kV.

Thursday, June 06, 2019, 11:11: BIAS / EE / EZL @ 58 / -2.9 / 8.25 kV.

Thursday, June 06, 2019, 11:27: BIAS was up to 58.5 & EZL to 9 kV. Buzzing / crackling. Unstable voltage drops / Current increase. BIAS / EZL to 57.5 / 8.5 kV.

Thursday, June 06, 2019, 11:36: BIAS was up to 58.0 & EZL to 9 kV. Buzzing / crackling. More unstable voltage drops / Current increases. BIAS dropped on it's own to 56.1 kV. BIAS / EZL to 56 / 7.5 kV.

Thursday, June 06, 2019, 11:36: Spark*. Inside chamber. Turbo pumps tripped. Buzzing stopped.

Thursday, June 06, 2019, 11:51: Unable to surpass 57 kV before voltage breakdown. Buzzing comes back. Breakdown dropped to 51 kV on BIAS.

Thursday, June 06, 2019, 11:53: BIAS @ 50 kV. EZL to 0, PS off, in attempt to relieve EZL current.

Thursday, June 06, 2019, 11:56: BIAS @ 50 kV. EZL to 7.5 kV w/ 1245 uA. Typically at 550-600 uA on EZL. Unable to relieve the current.

Thursday, June 06, 2019, 12:18: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV. Current: BIAS / EZL @ 65 / 1306 uA.

Thursday, June 06, 2019, 13:14: BIAS / EE / EZL @ 56 / -2.7 / 7.25 kV. Current: BIAS / EZL @ 70 / 1450 uA.

Thursday, June 06, 2019, 13:15: Voltage breakdown. Buzzing / crackling back. Breakdown dropped to 56.2 kV on BIAS. BIAS set to 56.1 kV to stabilize.

Thursday, June 06, 2019, 13:19: EZL current limit increased.

Thursday, June 06, 2019, 13:30: BIAS / EE / EZL  @ 56.5 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1856 uA.

Thursday, June 06, 2019, 13:31: Passed to BIAS 56.6 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.6 kV on BIAS. BIAS set to 55.5 kV to stabilize.

Thursday, June 06, 2019, 13:51: BIAS / EE / EZL  @ 56.2 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1950 uA.

Thursday, June 06, 2019, 13:52:  BIAS 56.3 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.1 kV on BIAS. BIAS set to 55.0 kV to stabilize. Unable to regain HV. Decreases each time we go up.

Thursday, June 06, 2019, 14:00: Limited via the test stand voltage breakdown up in the cage. Source tray held @ 58 kV.

Bring it down.

Thursday, June 06, 2019, 14:31: BIAS / EE / EZL @ 0 kV.


Friday, June 07, 2019, 06:41: Power / Sources off.

Friday, June 07, 2019, 06:43: IG1 & Turbo pumps off.

 

 

 

Attachment 1: TM4_Source_Tray_-_2019_-_2.docx
Attachment 2: TS-2019-05-29-07-08.rga
Attachment 3: TM4_Source_Tray_-_2019_-_3_-_HV_-_1.docx
Attachment 4: TM4_Source_Tray_-_2019_-_4_-_HV_-_2_-_Heat_on.docx
Attachment 5: TM4_Source_Tray_-_2019_-_5_-_HV_over_50_-Heat_on.docx
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.

Tuesday, June 11, 2019, 14:33: Roughing.


Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.

Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.

Wednesday, June 12, 2019, 11:13: Turbo pumps on.

Wednesday, June 12, 2019, 11:21: Ion gauge on. 

Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.


Thursday, June 13, 2019, 10:27:

He Leak TEST:

Vacuum Group Leak detector LD#4.

Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.20e-006

He: 4.55e-010

LD:  1.2e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35:

Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:

Water: 2.20e-006

He: 4.20e-010

LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.

Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:

Water: 2.18e-006

He: 3.68e-010

LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.

Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:

Water: 2.16e-006

He: 9.24e-011

*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.

Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:

Water: 2.15e-006

He: 2.06e-010

*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*

Purge and close FS#4.

Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:

Water: 2.13e-006

He: 2.75e-010

LD: 1.7e-08 atm-cc/sec. Purge and close FS#5

Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines. 

Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:

Water: 2.12e-006

He: 6.21e-010

LD: 3.3e-08 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.

Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.

Thursday, June 13, 2019, 14:03: New TGHT PS installed.

Thursday, June 13, 2019, 14:06: Power / sources on.

Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Thursday, June 13, 2019, 14:21: Spark*

Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.

Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.

Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.


Friday, June 14, 2019, 06:52: Restart RGA.

Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.

Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.

Friday, June 14, 2019, 08:48: Gas lines fully opened.

Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.

Friday, June 14, 2019, 08:52: HV sources ready.

FM

Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.

AS

Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

Friday, June 14, 2019, 11:18: Optics set.

Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.


Monday, June 17, 2019, 08:34: TMS:MB1 - Reset. 

Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.

FM

Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A  ~2A/min


Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.

Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.


AS

Wednesday, June 19, 2019, 07:10: IV4 Closed.

Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.

Wednesday, June 19, 2019, 07:15: RGA off.

Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.

Wednesday, June 19, 2019, 08:35: Purging / venting.

  738   Wednesday, June 26, 2019, 11:34 Aaron SchmidtTest TaHP-SIS TM4No Target oven #42972-4In progressTest target for TM4 checks

The HP-SIS uses the older center block. No serial number found. 

Loaded with Tantalum. Rough Target description:

Comment on the bag - 0.9 cm space

Total Ta foils = 525

Foil Thickness = 0.025mm (assumed)

Target density =  ?

Target length = 7.3 cm

Total Mass =  ?

Total mass w/ Target oven=  1242 g.

Assembly voltage checks - OK. Note* Spacers between insulator & Target.

Thermocouple wires attach to the 9-pin connector.


 Wednesday, June 26, 2019, 14:47: roughing.

Wednesday, June 26, 2019, 15:30: Turbos on.

Wednesday, June 26, 2019, 15:51: IG1 on. Vacuum @ 1.14e-4 T.


Thursday, June 27, 2019, 07:11: Waterlines opened. No response on RGA. Vacuum stable @ 3.49e-06T.

Thursday, June 27, 2019, 07:14: Power / sources switched on. Omega switched on to read thermocouples.

Thermocouple readings:

T1 - 24.8 C & T2 - 24.9 C.

Thursday, June 27, 2019, 07:16:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.40 5.21
 TBHT 27.11

7.91

 COIL + EE 27.01 2.26
 TGHT 27.12 6.26

Thursday, June 27, 2019, 12:43: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min


Friday, June 28, 2019, 07:02: HV on, IV4 opened.

Friday, June 28, 2019, 07:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Friday, June 28, 2019, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Friday, June 28, 2019, 07:12: Spark*

Friday, June 28, 2019, 07:15: Optics on. Some instability noticed on the BIAS.

Friday, June 28, 2019, 07:17:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.02 5.73
 TBHT 26.87

8.29

 COIL + EE 26.78 2.43
 TGHT 26.86 6.47

Thermocouple readings:

T1 - 106.7 C & T2 - 106.8 C.

Friday, June 28, 2019, 07:24: Halt auto ramping. TGHT / TBHT @ 375 / 150 A. BIAS / EE / EZL @ 0 kV. Unusual amount of sparks and instability. 

Friday, June 28, 2019, 08:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Sparks seen immediately.

The TBHT insulator on the source tray side is glowing blue. Very neat.

Sparks observed striking inside the vacuum on the thermocouples / heat shield from the TBHT.

Friday, June 28, 2019, 08:57: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per  min.

Friday, June 28, 2019, 10:45: Disconnect mini pump, connect OMEGA thermometer to ground.

Friday, June 28, 2019, 10:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.

Friday, June 28, 2019, 11:03: manually bump up TGHT / TBHT to 50 A.

Friday, June 28, 2019, 11:05: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Friday, June 28, 2019, 11:39: Spark*

Friday, June 28, 2019, 11:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.

Friday, June 28, 2019, 12:15: TGHT / TBHT @ 322 / 200 A. Sparking*

Friday, June 28, 2019, 12:17: Halt auto-ramping. Sparking*. Manually bring down current.

Friday, June 28, 2019, 12:23: Sparks ceased. TGHT / TBHT @ 300 / 150 A

Friday, June 28, 2019, 12:24: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per  min.

Friday, June 28, 2019, 12:32: new video taken. After reviewing the video, the spark originates at the heat shield / thermocouples and moves to the TBHT insulator.

Friday, June 28, 2019, 15:26: Auto-ramping TGHT / TBHT to 200/ 100A @ 4 A per min.


Tuesday, July 02, 2019, 07:58: RGA restarted.

Tuesday, July 02, 2019, 08:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks. Vacuum @ 7.08e-07T.

Tuesday, July 02, 2019, 08:08: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.

Tuesday, July 02, 2019, 08:37: Halt auto ramp. TGHT / TBHT @ 310 / 150 A. Two sparks*. Vacuum @ 2.32e-06T. Allow to stabilize.

Tuesday, July 02, 2019, 08:55: Auto-ramping TGHT to 350 A @ 4 A per min. Vacuum @ 1.08e-06T.

Tuesday, July 02, 2019, 09:05: TGHT @ 350 A. Vacuum @ 1.08e-06T

Tuesday, July 02, 2019, 09:07: Spark*

Tuesday, July 02, 2019, 09:16: Spark*

Tuesday, July 02, 2019, 09:24: Spark*

Tuesday, July 02, 2019, 09:38: Auto-cooling @ 4 A per  min.

Tuesday, July 02, 2019, 09:45: BIAS / EE / EZL @ 0 kV.

Tuesday, July 02, 2019, 11:39: IG1 off. Turbos off. RGA off

  744   Monday, July 08, 2019, 09:20 Luca Egoritip2n1 ITE   In progressp2n heating test

(see entry 742)

 

p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets to M3 screws. Target hold current nicely with no major voltage spikes.

The plan now is to cycle the current heating few times to "stress test" the target.

Attachment 1: Capture.PNG
Capture.PNG
Attachment 2: Capture1.PNG
Capture1.PNG
  750   Friday, August 02, 2019, 13:16 Aaron SchmidtP2N - 1     In progressp2n heating test 4

Friday, August 02, 2019: p2n target installed in the test stand, the ion source was fully removed to avoid any risk of shorting. The Central ion source current lead is attached to the target body so it was left there and attached to its electrodes.

Friday, August 02, 2019, 13:15: Roughing.

Friday, August 02, 2019, 13:58: BV1A closed to allow pressure stabilization. Opened about 10-15 seconds later with BV1B.

Friday, August 02, 2019, 14:00: Turbos pumps on.

Friday, August 02, 2019, 14:09: Ion gauge on.

Friday, August 02, 2019, 15:15: RGA cycled. Now the filament can start. RGA on.


Tuesday, August 06, 2019, 07:49: RGA Error. Halted.

Tuesday, August 06, 2019, 07:53: Restarted RGA.

Tuesday, August 06, 2019, 09:32: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.16e-06T.

Power on.

  753   Thursday, August 08, 2019, 09:12 Aaron Schmidt LP-FEBIAD   42752-7In progressP2N Setup - LP-FEBIAD target

Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil / TGHT connections were added.

Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.

-Heat the TGHT only, observe, then ramp down.

-Heat Coil only, observe, then ramp down.

-Heat TGHT w/ Coil, observe, then ramp down.

Note* Heating should be even across the target. Elog & take pictures.

NO HV ALLOWED!!!!

Thursday, August 08, 2019, 09:05: Roughing.

Thursday, August 08, 2019, 09:14: BV1A closed to allow pressure stabilization. Opened about within 2 seconds later with BV1B.

Thursday, August 08, 2019, 09:41: Turbo pumps on.

Thursday, August 08, 2019, 09:47: Ion gauge on.

Thursday, August 08, 2019, 10:37: RGA on.

TSG:CG1A & TSG:CG1B do not appear to be pumping down efficiently - May need to swap out TSG:RP1 after this test. Last done April 18, 2018. elog: 655.


Friday, August 09, 2019, 08:49: Power on.

Friday, August 09, 2019, 08:51: Waterlines opened. No response on RGA. Vacuum ok @ 3.03e-06T

Friday, August 09, 2019, 08:56: Auto-ramping TGHT  @ 4 @ per min to 150 A.

Friday, August 09, 2019, 10:10: Ramping the TGHT down from 150 A to 0A.

Friday, August 09, 2019, 10:39: Anode Current @ 200 mA w/ 19V? Anode PS on. Voltage & current dropped off.

Friday, August 09, 2019, 11:18: TGHT and TBHT power supplies ramped to 150A each, total of 300A in the target

Friday, August 09, 2019, 13:12:  Target glows symmetrically. TGHT and TBHT ramped from 150A to 200A each for a total of 400A on the target

Friday, August 09, 2019, 14:05: RGA error.

Friday, August 09, 2019, 14:08: RGA Restarted.

Friday, August 09, 2019, 14:08: Target heating evenly on total 400 A.

Friday, August 09, 2019, 15:57:  Auto-ramping TGHT/TBHT  @ 4 @ per min to 250/250 A.

Friday, August 09, 2019, 16:28: Vacuum limit reach at 241 and 238 A for TGHT and TBHT, respectively.

Friday, August 09, 2019, 16:28: Auto-cooling started at 4A/min


Monday, August 12, 2019, 09:22: Sources off. RGA off.

Monday, August 12, 2019, 10:04: Power off. Ion gauge off. Turbos off.

Attachment 1: 20190808_085752.jpg
20190808_085752.jpg
Attachment 2: 20190808_085758.jpg
20190808_085758.jpg
Attachment 3: 20190809_135736.jpg
20190809_135736.jpg
Attachment 4: 20190809_135747.jpg
20190809_135747.jpg
Attachment 5: 20190809_135820.jpg
20190809_135820.jpg
Attachment 6: Aug_2019_test_target_-_P2N_-_LP-FEBIAD_setup.docx
Attachment 7: TS-2019-08-08-10-37.rga
Attachment 8: TS-2019-08-09-14-07.rga
  758   Monday, September 23, 2019, 13:30 Aaron SchmidtTa#59LP-SISITETM244062-542752-10In progressConditioning Ta#59 Assy

Monday, September 23, 2019, 13:28: Roughing.

Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.

Monday, September 23, 2019, 14:20: Turbo pumps started.

Monday, September 23, 2019, 14:27: Ion gauge on.


Tuesday, September 24, 2019, 08:04: RGA on.

Tuesday, September 24, 2019, 08:07: Waterlines opened. No response on RGA. Vacuum ok @ 1.52e-06T.

Tuesday, September 24, 2019, 08:12: Power / sources on.

Tuesday, September 24, 2019, 08:16: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.

Tuesday, September 24, 2019, 08:19: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.

Tuesday, September 24, 2019, 08:20: IV4 Opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.33 5.00
 TBHT 28.19

7.75

 COIL + EE 28.08 2.13
 TGHT  28.18 6.15

Tuesday, September 24, 2019, 08:28: BIAS / EE / EZL @ 27 / -1.5 / 13 kV. Spark*

Tuesday, September 24, 2019, 08:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, September 24, 2019, 09:07: Optics set.

Tuesday, September 24, 2019, 10:45: Clusters of sparks noted. Especially around 10:20.

Tuesday, September 24, 2019, 10:58: RGA reset.

Tuesday, September 24, 2019, 11:05  Sparks ongoing. spaced from 1 minutes apart to 15 minutes apart. The TBHT insulator is glowing blue on the left right side again.

Tuesday, September 24, 2019, 11:06: Abort Target heating.

Tuesday, September 24, 2019, 11:12: BIAS to 23 KV. Blue glow less pronounced /  almost gone.

Tuesday, September 24, 2019, 11:15: BIAS to 30 KV. Blue glow remains.

Tuesday, September 24, 2019, 11:31: Continue auto-ramping @ 2A per min.

Tuesday, September 24, 2019, 11:39. HV off.

Tuesday, September 24, 2019, 11:49: Halt ramp. Auto-cooling @ 4 A per min.

Remove loose wiring / connection from 9-pin area in the back. Ground other loose connections.

Tuesday, September 24, 2019, 13:28: Auto-ramping TGHT / TBHT to 250 / 200 A @ 4A per min.

Tuesday, September 24, 2019, 13:31: HV sources on. Optics on.

Tuesday, September 24, 2019, 13:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, September 24, 2019, 14:32: Auto-ramping TGHT to 280 A @ 4A per min.

Tuesday, September 24, 2019, 14:40: TGHT / TBHT @ 280 /  200 A.


EPICS issues* ? Won't open at the ISAC TS computer.

Wednesday, September 25, 2019, 07:30: Auto-ramping TGHT to 350 A @ 2 A per min. 

Wednesday, September 25, 2019, 07:44:  EPICS Error at my desk as well. Able to restart it and continue ramping.

Wednesday, September 25, 2019, 07:56: EPICS Issue ongoing. Halted ramping @ 290 A on TGHT.

Wednesday, September 25, 2019, 10:44: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min. 

Wednesday, September 25, 2019, 11:57: FM: Sparks have been occurring for the past 20 min with a rate approx of 0.5/min. The TBHT insulator is again  showing a glowing blue. I managed to saw one spark flashing up the TBHT insulator.

Wednesday, September 25, 2019, 12:59: RGA restarted.

Wednesday, September 25, 2019, 13:36: Spark* knocked out TSG:CB1 during RPM6A wire scan. Controls notified.

Wednesday, September 25, 2019, 14:45: After investigation with controls, replacement of the control board to TSG:CB1 likely req'd.


Thursday, September 26, 2019, 06:30: HV off. Prep to remove control board for TSG:CB1. 

Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced. https://elog.triumf.ca/TIS/Test-Stand/759

Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.

Thursday, September 26, 2019, 11:36:  BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Thursday, September 26, 2019, 12:31: Mass, wire, & emittance scans successful

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.23 7.59
 TBHT 26.86

10.02

 COIL + EE 26.65 3.27
 TGHT  26.89 7.29

Thursday, September 26, 2019, 12:33: Auto-cooling to TGHT / TBHT to 530 / 180 @ 4A per min.

Thursday, September 26, 2019, 12:45: TGHT / TBHT @ 530 / 180A. Hold*  

Thursday, September 26, 2019, 13:17: No Sparks*. Auto-cooling to TGHT / to 500 @ 4A per min.

Thursday, September 26, 2019, 13:25: No Sparks*. FC0 'in'.  

Thursday, September 26, 2019, 13:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min. 

Thursday, September 26, 2019, 14:28: Auto-cooling @ 2A per min.


Friday, September 27, 2019, 07:17: HV off.

Friday, September 27, 2019, 07:19: RGA off

Friday, September 27, 2019, 07:21: Close & reset IV4.

Friday, September 27, 2019, 07:23: Power / Sources off. Ion gauge & Turbo pumps off.

Friday, September 27, 2019, 10:29: Venting. Waterlines purged.

Attachment 1: ITE-TM2-Ta#59-LP-SIS_Test_Stand.docx
Attachment 2: Ta#59.docx
Attachment 3: ER-580-230-30kV-m28.txt
value (Voltage offset      40.0000)
     80.0000
      0.7000
     80.0000
  29963.3700
21
21
./emit.dat
 0.2301 -0.0613 -0.0647 -0.0488 -0.0296 -0.0510 -0.0580 -0.0638 -0.0677 -0.0656 -0.0647 -0.0687 -0.0616 -0.0650 -0.0641 -0.0641 -0.0644 -0.0656 -0.0641 -0.0638 -0.0616
 -0.0528 -0.0577 -0.0595 -0.0601 -0.0583 -0.0327 -0.0250 -0.0333 -0.0519 -0.0610 -0.0610 -0.0613 -0.0601 -0.0613 -0.0601 -0.0604 -0.0610 -0.0641 -0.0635 -0.0604 -0.0620
 -0.0552 -0.0613 -0.0595 -0.0595 -0.0604 -0.0607 -0.0500 -0.0281 -0.0275 -0.0333 -0.0562 -0.0595 -0.0620 -0.0607 -0.0638 -0.0623 -0.0574 -0.0589 -0.0635 -0.0644 -0.0613
 -0.0565 -0.0607 -0.0580 -0.0595 -0.0613 -0.0592 -0.0607 -0.0592 -0.0491 -0.0180 -0.0208 -0.0259 -0.0494 -0.0601 -0.0580 -0.0586 -0.0555 -0.0595 -0.0610 -0.0580 -0.0616
 -0.0562 -0.0586 -0.0580 -0.0595 -0.0577 -0.0577 -0.0601 -0.0623 -0.0595 -0.0592 -0.0339 -0.0156 -0.0165 -0.0235 -0.0534 -0.0592 -0.0610 -0.0586 -0.0574 -0.0586 -0.0592
 -0.0568 -0.0580 -0.0586 -0.0589 -0.0562 -0.0592 -0.0613 -0.0586 -0.0607 -0.0620 -0.0583 -0.0574 -0.0351 -0.0146 -0.0119 -0.0354 -0.0571 -0.0592 -0.0565 -0.0604 -0.0601
 -0.0610 -0.0586 -0.0580 -0.0604 -0.0583 -0.0583 -0.0580 -0.0558 -0.0613 -0.0583 -0.0604 -0.0601 -0.0571 -0.0562 -0.0217 -0.0125 -0.0128 -0.0327 -0.0604 -0.0604 -0.0589
 -0.0580 -0.0592 -0.0580 -0.0604 -0.0607 -0.0568 -0.0580 -0.0583 -0.0598 -0.0598 -0.0571 -0.0592 -0.0616 -0.0589 -0.0592 -0.0436 -0.0143 -0.0082 -0.0204 -0.0485 -0.0604
 -0.0571 -0.0571 -0.0574 -0.0595 -0.0580 -0.0583 -0.0595 -0.0586 -0.0595 -0.0568 -0.0565 -0.0586 -0.0601 -0.0586 -0.0577 -0.0601 -0.0574 -0.0415 -0.0119 -0.0134 -0.0235
 -0.0534 -0.0574 -0.0574 -0.0583 -0.0574 -0.0586 -0.0595 -0.0604 -0.0598 -0.0592 -0.0571 -0.0592 -0.0583 -0.0577 -0.0589 -0.0595 -0.0583 -0.0583 -0.0531 -0.0229 -0.0101
 -0.0558 -0.0571 -0.0604 -0.0586 -0.0577 -0.0592 -0.0586 -0.0592 -0.0586 -0.0595 -0.0571 -0.0568 -0.0571 -0.0577 -0.0601 -0.0586 -0.0598 -0.0620 -0.0623 -0.0580 -0.0558
 -0.0586 -0.0610 -0.0607 -0.0592 -0.0595 -0.0574 -0.0558 -0.0592 -0.0583 -0.0577 -0.0616 -0.0613 -0.0583 -0.0580 -0.0607 -0.0577 -0.0601 -0.0623 -0.0595 -0.0598 -0.0595
 -0.0577 -0.0571 -0.0577 -0.0595 -0.0613 -0.0580 -0.0571 -0.0607 -0.0571 -0.0568 -0.0586 -0.0604 -0.0580 -0.0592 -0.0613 -0.0568 -0.0577 -0.0583 -0.0607 -0.0598 -0.0586
 -0.0571 -0.0565 -0.0552 -0.0583 -0.0580 -0.0589 -0.0589 -0.0607 -0.0558 -0.0586 -0.0552 -0.0589 -0.0592 -0.0607 -0.0583 -0.0607 -0.0562 -0.0577 -0.0571 -0.0601 -0.0586
 -0.0552 -0.0568 -0.0555 -0.0574 -0.0555 -0.0592 -0.0604 -0.0598 -0.0592 -0.0595 -0.0592 -0.0601 -0.0580 -0.0601 -0.0577 -0.0623 -0.0565 -0.0589 -0.0595 -0.0577 -0.0574
 -0.0580 -0.0565 -0.0574 -0.0571 -0.0562 -0.0577 -0.0580 -0.0589 -0.0598 -0.0607 -0.0571 -0.0580 -0.0571 -0.0565 -0.0577 -0.0580 -0.0583 -0.0586 -0.0580 -0.0583 -0.0562
 -0.0577 -0.0580 -0.0571 -0.0580 -0.0583 -0.0562 -0.0574 -0.0592 -0.0583 -0.0589 -0.0583 -0.0586 -0.0586 -0.0595 -0.0583 -0.0558 -0.0577 -0.0620 -0.0589 -0.0571 -0.0592
 -0.0586 -0.0580 -0.0580 -0.0601 -0.0604 -0.0589 -0.0555 -0.0580 -0.0577 -0.0546 -0.0616 -0.0595 -0.0577 -0.0613 -0.0595 -0.0592 -0.0574 -0.0613 -0.0583 -0.0568 -0.0607
 -0.0562 -0.0577 -0.0568 -0.0598 -0.0586 -0.0595 -0.0568 -0.0583 -0.0589 -0.0568 -0.0583 -0.0583 -0.0574 -0.0592 -0.0583 -0.0613 -0.0586 -0.0595 -0.0607 -0.0595 -0.0601
 -0.0562 -0.0583 -0.0571 -0.0562 -0.0568 -0.0571 -0.0607 -0.0610 -0.0571 -0.0583 -0.0565 -0.0568 -0.0589 -0.0571 -0.0568 -0.0589 -0.0568 -0.0574 -0.0583 -0.0580 -0.0595
 -0.0558 -0.0583 -0.0577 -0.0568 -0.0574 -0.0543 -0.0586 -0.0586 -0.0595 -0.0607 -0.0580 -0.0577 -0.0577 -0.0574 -0.0589 -0.0592 -0.0595 -0.0574 -0.0595 -0.0583 -0.0574
Attachment 4: ER-580-230-30kV-m133.txt
value (Voltage offset      40.0000)
     80.0000
      0.7000
     80.0000
  29963.3700
21
21
./emit.dat
 -0.0873 -0.0696 -0.0656 0.0394 0.5966 0.2493 -0.0040 -0.0677 -0.0763 -0.0751 -0.0711 -0.0708 -0.0729 -0.0717 -0.0711 -0.0671 -0.0668 -0.0659 -0.0681 -0.0653 -0.0681
 -0.0601 -0.0644 -0.0653 -0.0623 -0.0452 0.4407 0.6903 0.5197 0.1221 -0.0717 -0.0720 -0.0668 -0.0647 -0.0656 -0.0677 -0.0644 -0.0641 -0.0638 -0.0629 -0.0607 -0.0616
 -0.0620 -0.0647 -0.0656 -0.0629 -0.0635 -0.0589 0.0229 0.5508 0.8975 0.6161 0.0180 -0.0690 -0.0668 -0.0650 -0.0671 -0.0644 -0.0629 -0.0629 -0.0650 -0.0613 -0.0592
 -0.0629 -0.0607 -0.0623 -0.0665 -0.0629 -0.0644 -0.0604 -0.0546 0.0208 0.8609 0.9299 0.7480 0.1935 -0.0650 -0.0638 -0.0616 -0.0653 -0.0601 -0.0650 -0.0610 -0.0616
 -0.0623 -0.0601 -0.0583 -0.0610 -0.0641 -0.0629 -0.0613 -0.0638 -0.0604 -0.0424 0.3604 0.9775 1.0474 0.7996 0.0171 -0.0641 -0.0659 -0.0632 -0.0656 -0.0635 -0.0644
 -0.0595 -0.0583 -0.0601 -0.0623 -0.0641 -0.0616 -0.0635 -0.0623 -0.0586 -0.0629 -0.0537 -0.0290 0.2808 1.1087 1.0617 0.5411 0.0668 -0.0626 -0.0613 -0.0635 -0.0632
 -0.0586 -0.0623 -0.0616 -0.0613 -0.0574 -0.0607 -0.0620 -0.0626 -0.0607 -0.0635 -0.0610 -0.0586 -0.0522 -0.0107 0.8350 1.1990 1.0834 0.5545 -0.0342 -0.0607 -0.0592
 -0.0604 -0.0626 -0.0613 -0.0616 -0.0598 -0.0580 -0.0577 -0.0589 -0.0610 -0.0574 -0.0574 -0.0595 -0.0571 -0.0537 -0.0397 0.1422 0.8340 1.2180 0.8847 0.2493 -0.0497
 -0.0610 -0.0586 -0.0607 -0.0635 -0.0589 -0.0565 -0.0598 -0.0580 -0.0595 -0.0598 -0.0586 -0.0604 -0.0598 -0.0552 -0.0552 -0.0519 -0.0418 0.1871 1.1423 1.1157 0.8002
 -0.0626 -0.0583 -0.0610 -0.0604 -0.0607 -0.0620 -0.0616 -0.0620 -0.0595 -0.0635 -0.0620 -0.0638 -0.0629 -0.0623 -0.0580 -0.0613 -0.0580 -0.0549 -0.0183 0.6107 1.1673
 -0.0607 -0.0610 -0.0601 -0.0601 -0.0623 -0.0647 -0.0610 -0.0623 -0.0586 -0.0613 -0.0629 -0.0610 -0.0613 -0.0629 -0.0598 -0.0616 -0.0586 -0.0577 -0.0626 -0.0467 -0.0015
 -0.0592 -0.0604 -0.0610 -0.0601 -0.0601 -0.0616 -0.0604 -0.0601 -0.0601 -0.0629 -0.0632 -0.0601 -0.0595 -0.0601 -0.0607 -0.0595 -0.0574 -0.0577 -0.0592 -0.0568 -0.0552
 -0.0623 -0.0598 -0.0610 -0.0620 -0.0604 -0.0589 -0.0607 -0.0613 -0.0577 -0.0598 -0.0598 -0.0586 -0.0595 -0.0583 -0.0607 -0.0586 -0.0595 -0.0592 -0.0598 -0.0543 -0.0592
 -0.0592 -0.0601 -0.0601 -0.0592 -0.0595 -0.0574 -0.0592 -0.0620 -0.0601 -0.0604 -0.0601 -0.0580 -0.0598 -0.0577 -0.0610 -0.0580 -0.0592 -0.0604 -0.0592 -0.0565 -0.0586
 -0.0595 -0.0601 -0.0580 -0.0568 -0.0568 -0.0571 -0.0595 -0.0604 -0.0632 -0.0644 -0.0623 -0.0623 -0.0620 -0.0607 -0.0589 -0.0620 -0.0613 -0.0604 -0.0641 -0.0598 -0.0580
 -0.0577 -0.0580 -0.0580 -0.0601 -0.0583 -0.0571 -0.0586 -0.0583 -0.0583 -0.0620 -0.0616 -0.0607 -0.0601 -0.0616 -0.0607 -0.0604 -0.0604 -0.0632 -0.0592 -0.0610 -0.0613
 -0.0583 -0.0592 -0.0574 -0.0604 -0.0577 -0.0562 -0.0558 -0.0537 -0.0555 -0.0580 -0.0601 -0.0613 -0.0589 -0.0607 -0.0626 -0.0586 -0.0601 -0.0595 -0.0549 -0.0589 -0.0598
 -0.0586 -0.0601 -0.0589 -0.0604 -0.0555 -0.0568 -0.0537 -0.0552 -0.0519 -0.0555 -0.0555 -0.0574 -0.0592 -0.0568 -0.0562 -0.0577 -0.0589 -0.0537 -0.0574 -0.0580 -0.0592
 -0.0598 -0.0586 -0.0574 -0.0607 -0.0555 -0.0577 -0.0562 -0.0549 -0.0552 -0.0519 -0.0534 -0.0531 -0.0574 -0.0577 -0.0577 -0.0601 -0.0580 -0.0583 -0.0580 -0.0604 -0.0586
 -0.0616 -0.0577 -0.0583 -0.0571 -0.0586 -0.0568 -0.0592 -0.0574 -0.0555 -0.0549 -0.0562 -0.0543 -0.0531 -0.0565 -0.0607 -0.0610 -0.0595 -0.0577 -0.0592 -0.0610 -0.0580
 -0.0580 -0.0592 -0.0592 -0.0552 -0.0604 -0.0571 -0.0583 -0.0589 -0.0571 -0.0592 -0.0555 -0.0534 -0.0558 -0.0549 -0.0568 -0.0558 -0.0549 -0.0580 -0.0595 -0.0580 -0.0601
Attachment 5: TS-2019-09-24-08-05.rga
Attachment 6: TS-2019-09-24-10-57.rga
Attachment 7: TS-2019-09-24-11-20.rga
Attachment 8: TS-2019-09-25-13-00.rga
Attachment 9: TS-2019-09-26-11-10.rga
  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HS

Wednesday, October 02, 2019, 13:42: Roughing.

Wednesday, October 02, 2019, 14:13: Turbo Pumps started.

Wednesday, October 02, 2019, 14:19: Ion gauge on.

Wednesday, October 02, 2019, 14:24: RGA on.


Thursday, October 03, 2019, 07:35: Waterlines opened.  No response on RGA. Vacuum ok @ 7.53e-07T

Thursday, October 03, 2019, 07:37: Power / Sources on.

Thursday, October 03, 2019, 07:38: Auto-ramping TGHT to 580 A @ 2 A per min.


Friday, October 04, 2019, 14:53: Auto-cooling @ 2 A per min. 


Wednesday, October 16, 2019, 10:17: RGA off.

Wednesday, October 16, 2019, 10:19: Power / Sources off. IG1 off. Turbo pumps off.

Attachment 1: UC#30.docx
  762   Friday, October 18, 2019, 15:01 Aaron SchmidtSiC#38HP-FEBIADITETM242464-442752-1In progressConditioning SiC#38 HP-FEBIAD

Friday, October 18, 2019, 14:58: Roughing.

Friday, October 18, 2019, 15:30: Turbo pumps on.

Friday, October 18, 2019, 15:35: Ion gauge on.

Friday, October 18, 2019, 15:39: RGA on.


Tuesday, October 22, 2019, 08:37: Restart RGA.

Tuesday, October 22, 2019, 08:39: Waterlines opened. No response on RGA. Vacuum stable @ 4.76e-07T.


Wednesday, October 23, 2019, 09:15: Calibrated He leak bottle installed on line labeled as "Neon"

Wednesday, October 23, 2019, 09:45: Do not start TS. Magnet PS water leak issue.Fault: 12797


FM

Monday, October 28, 2019, 09:10: Magnet leak repaired on Friday.  Checked by Anders. The polarity might need to be reversed.

Monday, October 28, 2019, 09:20: Vacuum gauges checked and reconnected ( see elog 765)

Monday, October 28, 2019, 09:28: RGA restarted.


FM

Tuesday, October 29, 2019, 9:00: Power/Sources on.

Tuesday, October 29, 2019, 10:29 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.56 5.23
 TBHT 22.35

8.03

 COIL + EE 22.30 2.17
 TGHT 22.40 6.29

Tuesday, October 29, 2019, 10:29: Gas lines opened

Tuesday, October 29, 2019, 10:45: BIAS/EZL/EE to 30 / 13 / 1.5 kV.

Tuesday, October 29, 2019, 10:56: Vacuum stable @ 7.28e-07T.

Tuesday, October 29, 2019, 10:54 : Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Tuesday, October 29, 2019, 11:01: IV4 open.

Tuesday, October 29, 2019, 11:01: Optics set to "old nominal" tunes.

Rick has provided new tunes that have been tested recently and show better beam quality. If times allows it I'll checked them again for this source

Tuesday, October 29, 2019, 14:02: Spark. Left monitor flickered.

Tuesday, October 29, 2019, 17:45: Mass scan @200V only showing surface ionized items. Either the anode is disconnected or the electron current is particularly low.


Wednesday, October 30, 2019, 09:10: TBHT tapped up to 310 A. No response on the anode leakage current,

Wednesday, October 30, 2019, 09:17 After talking with Anders, the system will be ramped down and switched to cathode bias.

Wednesday, October 30, 2019, 09:21: Auto-cooling to TGHT / TBHT to 0/ 0 @ 6A per min.

Wednesday, October 30, 2019, 11:04: : BIAS/EZL/EE to 0V

Wednesday, October 30, 2019, 14:50 Now on Cathode bias mode. See elog 766   

Wednesday, October 30, 2019, 14:53: Power/ Sources on.

Wednesday, October 30, 2019, 15:02: Gas lines open

Wednesday, October 30, 2019, 15:04: Optics set

Wednesday, October 30, 2019, 15:30: BIAS/EZL/EE to 30 / 13 / 1.5 kV.

Anode@200V. Coil@40A

Wednesday, October 30, 2019, 15:30: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2A per min.

 Wednesday, October 30, 2019, 15:59: Auto-ramping aborted.

Wednesday, October 30, 2019, 16:00: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4A per min.


FM

Thursday, October 31, 2019, 08:05: Auto-ramping TGHT / TBHT to 580/ 290A @ 4A per min.

Thursday, October 31, 2019, 08:54: TBHT at  set current and glowing but no leakage current on the anode.

Thursday, October 31, 2019, 08:56: Ramping aborted.

Thursday, October 31, 2019, 09:19: Manually tapping TBHT to 300 A. Still no leakage current.

Thursday, October 31, 2019, 09:08: Auto-cooling to TGHT / TBHT to 0/ 0 @ 8A per min.

Thursday, October 31, 2019, 09:35: BIAS/EZL/EE to 0V

Thursday, October 31, 2019, 10:16: Gas lines closed.

Thursday, October 31, 2019, 10:16: IV4 closed.

Thursday, October 31, 2019, 10:16: IG1 off.

Thursday, October 31, 2019, 10:17: RGA off.

Thursday, October 31, 2019, 10:17: Turbos off.

Thursday, October 31, 2019, 11:41 Venting

 Thursday, October 31, 2019, 11:41: HS waterline purged.

Thursday, October 31, 2019, 13:00: Inspecting the interior, 9 pin connector slightly de attached but now reattached (see elog 768)

Thursday, October 31, 2019, 13:07: Roughing

Thursday, October 31, 2019, 13:40: Turbos on

Thursday, October 31, 2019, 13:44: Gas lines open

Thursday, October 31, 2019, 13:47: IG1 on

Thursday, October 31, 2019, 13:48 RGA on.

Thursday, October 31, 2019, 16:09: Waterlines opened. No response on RGA. Vacuum stable @ 2.41e-06T.

Thursday, October 31, 2019, 16:15: Power/ sources on.

Thursday, October 31, 2019, 16:15  BIAS/EZL/EE to 30 / 13 / 1.5 kV.

Thursday, October 31, 2019, 16:16: Optics set

Thursday, October 31, 2019, 16:17

Thursday, October 31, 2019, 08:05: Auto-ramping TGHT / TBHT to 580/ 290A @ 4A per min.

Thursday, October 31, 2019, 16:17: IV4 open

Thursday, October 31, 2019, 17:27: Readback current is not displayed on EPICS. However, electron impact ionized species are present in the mass scan.

Thursday, October 31, 2019, 17:29: Auto-ramping aborted. TBHT/TGHT 290/292 A. Vacuum stable@2.32-6 T


 Friday, November 01, 2019, 08:35: Auto-ramping TGHT  to 580 A @ 4A per min. TBHT @ 290 A. - AS

Friday, November 01, 2019, 12:09: Auto-cooling to TGHT / TBHT to 0/ 0 @ 8A per min.

Friday, November 01, 2019, 13:13: Anode to 0V.

Friday, November 01, 2019, 13:13: Gas lines closed

Friday, November 01, 2019, 13:25 BIAS/EZL/EE to 0V

Friday, November 01, 2019, 13:26: IV4 closed

Friday, November 01, 2019, 13:32: Power / Sources off. Ion gauge & Turbo pumps off.

Friday, November 01, 2019, 14:36: Venting.

Attachment 1: ITE-TM2-SiC#38-HP-FEBIAD_Test_Stand.docx
Attachment 2: SiC#38.docx
Attachment 3: TS-2019-10-18-15-14.rga
Attachment 4: TS-2019-10-31-13-48.rga
Attachment 5: TS-2019-10-29-10-52.rga
Attachment 6: TS-2019-10-30-08-39.rga
Attachment 7: TS-2019-10-31-08-55.rga
Attachment 8: ER-580-290--30kV-m23.txt
value (Voltage offset      40.0000)
     80.0000
      0.7000
     80.0000
  29963.3700
21
21
./emit.dat
 -0.1523 -0.0461 -0.0473 -0.0473 -0.0470 -0.0421 -0.0455 -0.0449 -0.0409 -0.0430 -0.0427 -0.0449 -0.0458 -0.0470 -0.0482 -0.0455 -0.0464 -0.0455 -0.0455 -0.0461 -0.0458
 -0.0381 -0.0470 -0.0427 -0.0418 -0.0397 -0.0381 -0.0385 -0.0427 -0.0430 -0.0439 -0.0433 -0.0439 -0.0409 -0.0436 -0.0415 -0.0378 -0.0400 -0.0415 -0.0461 -0.0418 -0.0424
 -0.0430 -0.0458 -0.0388 -0.0381 -0.0372 -0.0439 -0.0403 -0.0406 -0.0415 -0.0436 -0.0421 -0.0388 -0.0388 -0.0360 -0.0391 -0.0409 -0.0412 -0.0406 -0.0400 -0.0372 -0.0400
 -0.0403 -0.0436 -0.0375 -0.0406 -0.0415 -0.0443 -0.0381 -0.0412 -0.0342 -0.0400 -0.0418 -0.0427 -0.0412 -0.0421 -0.0385 -0.0357 -0.0403 -0.0409 -0.0385 -0.0397 -0.0400
 -0.0436 -0.0497 -0.0406 -0.0400 -0.0381 -0.0415 -0.0415 -0.0412 -0.0403 -0.0385 -0.0375 -0.0430 -0.0391 -0.0430 -0.0412 -0.0418 -0.0388 -0.0381 -0.0409 -0.0403 -0.0400
 -0.0424 -0.0470 -0.0415 -0.0427 -0.0412 -0.0424 -0.0427 -0.0409 -0.0482 -0.0415 -0.0400 -0.0403 -0.0372 -0.0385 -0.0439 -0.0443 -0.0409 -0.0409 -0.0403 -0.0400 -0.0424
 -0.0400 -0.0418 -0.0403 -0.0421 -0.0461 -0.0412 -0.0388 -0.0400 -0.0421 -0.0424 -0.0415 -0.0391 -0.0397 -0.0385 -0.0430 -0.0412 -0.0403 -0.0418 -0.0409 -0.0400 -0.0418
 -0.0427 -0.0476 -0.0409 -0.0397 -0.0394 -0.0388 -0.0375 -0.0378 -0.0394 -0.0406 -0.0403 -0.0400 -0.0397 -0.0409 -0.0391 -0.0403 -0.0406 -0.0394 -0.0430 -0.0391 -0.0403
 -0.0439 -0.0500 -0.0400 -0.0378 -0.0385 -0.0439 -0.0403 -0.0385 -0.0406 -0.0357 -0.0378 -0.0412 -0.0400 -0.0406 -0.0400 -0.0394 -0.0385 -0.0385 -0.0375 -0.0406 -0.0385
 -0.0406 -0.0464 -0.0394 -0.0403 -0.0403 -0.0436 -0.0400 -0.0406 -0.0412 -0.0406 -0.0394 -0.0403 -0.0363 -0.0385 -0.0415 -0.0412 -0.0406 -0.0406 -0.0397 -0.0427 -0.0409
 -0.0400 -0.0482 -0.0424 -0.0415 -0.0409 -0.0388 -0.0403 -0.0409 -0.0409 -0.0433 -0.0409 -0.0421 -0.0418 -0.0409 -0.0430 -0.0403 -0.0400 -0.0378 -0.0415 -0.0418 -0.0415
 -0.0397 -0.0482 -0.0421 -0.0400 -0.0458 -0.0400 -0.0397 -0.0400 -0.0400 -0.0421 -0.0406 -0.0391 -0.0385 -0.0366 -0.0372 -0.0378 -0.0400 -0.0397 -0.0394 -0.0427 -0.0412
 -0.0403 -0.0461 -0.0375 -0.0391 -0.0400 -0.0415 -0.0378 -0.0397 -0.0421 -0.0421 -0.0385 -0.0409 -0.0375 -0.0369 -0.0378 -0.0385 -0.0409 -0.0372 -0.0357 -0.0415 -0.0391
 -0.0394 -0.0482 -0.0409 -0.0400 -0.0397 -0.0427 -0.0409 -0.0391 -0.0415 -0.0409 -0.0394 -0.0415 -0.0415 -0.0409 -0.0418 -0.0406 -0.0400 -0.0400 -0.0415 -0.0381 -0.0375
 -0.0406 -0.0485 -0.0446 -0.0378 -0.0391 -0.0397 -0.0415 -0.0385 -0.0391 -0.0394 -0.0394 -0.0409 -0.0406 -0.0418 -0.0388 -0.0378 -0.0369 -0.0427 -0.0412 -0.0418 -0.0409
 -0.0354 -0.0473 -0.0391 -0.0400 -0.0412 -0.0424 -0.0409 -0.0378 -0.0406 -0.0394 -0.0366 -0.0385 -0.0375 -0.0378 -0.0406 -0.0439 -0.0400 -0.0394 -0.0397 -0.0418 -0.0409
 -0.0345 -0.0430 -0.0388 -0.0394 -0.0378 -0.0412 -0.0385 -0.0391 -0.0397 -0.0381 -0.0409 -0.0385 -0.0381 -0.0385 -0.0400 -0.0406 -0.0406 -0.0388 -0.0388 -0.0406 -0.0406
 -0.0403 -0.0467 -0.0400 -0.0378 -0.0400 -0.0357 -0.0391 -0.0385 -0.0412 -0.0403 -0.0421 -0.0397 -0.0391 -0.0403 -0.0388 -0.0397 -0.0418 -0.0369 -0.0388 -0.0406 -0.0385
 -0.0403 -0.0497 -0.0378 -0.0366 -0.0388 -0.0424 -0.0406 -0.0372 -0.0381 -0.0400 -0.0400 -0.0421 -0.0381 -0.0360 -0.0363 -0.0406 -0.0391 -0.0397 -0.0391 -0.0375 -0.0388
 -0.0366 -0.0464 -0.0415 -0.0400 -0.0385 -0.0430 -0.0406 -0.0385 -0.0391 -0.0385 -0.0433 -0.0406 -0.0406 -0.0385 -0.0409 -0.0388 -0.0385 -0.0406 -0.0424 -0.0406 -0.0409
 -0.0354 -0.0467 -0.0418 -0.0418 -0.0412 -0.0381 -0.0400 -0.0409 -0.0375 -0.0372 -0.0388 -0.0385 -0.0409 -0.0433 -0.0424 -0.0400 -0.0400 -0.0394 -0.0400 -0.0418 -0.0388
Attachment 9: ER-580-290--30kV-m28.txt
value (Voltage offset      40.0000)
     80.0000
      0.7000
     80.0000
  29963.3700
21
21
./emit.dat
 -0.0009 -0.0009 -0.0006 0.0003 0.0012 0.0009 0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009
 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 0.0012 0.0018 0.0012 0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0012 -0.0006
 -0.0003 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 0.0003 0.0012 0.0021 0.0009 0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009
 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 0.0003 0.0021 0.0024 0.0018 0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0003 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0012 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 0.0012 0.0024 0.0021 0.0012 0.0003 -0.0009 -0.0012 -0.0012 -0.0006 -0.0006 -0.0009
 -0.0012 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0012 -0.0009 -0.0006 -0.0003 0.0012 0.0024 0.0024 0.0012 0.0009 -0.0006 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0012 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 0.0003 0.0024 0.0027 0.0024 0.0012 -0.0006 -0.0009 -0.0009
 -0.0003 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 0.0000 0.0027 0.0031 0.0015 0.0012 -0.0003
 -0.0012 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0012 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 0.0006 0.0043 0.0027 0.0015
 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 0.0018 0.0040
 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0003
 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0015 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009
 -0.0009 -0.0003 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006
 -0.0006 -0.0012 -0.0006 -0.0009 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0012 -0.0006
 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0003
 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006
 -0.0009 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0012 -0.0006 -0.0012 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0012 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0012 -0.0006 -0.0009 -0.0006
Attachment 10: ER-580-290--30kV-m28-run2.txt
value (Voltage offset      40.0000)
     80.0000
      0.7000
     80.0000
  29963.3700
21
21
./emit.dat
 -0.0009 -0.0009 -0.0006 0.0000 0.0012 0.0012 0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006 -0.0012 -0.0009 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 0.0000 0.0018 0.0012 0.0003 -0.0009 -0.0006 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009
 -0.0012 -0.0003 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 0.0000 0.0009 0.0018 0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 0.0003 0.0015 0.0018 0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0003 0.0012 0.0024 0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0012 -0.0006 -0.0006 -0.0009 -0.0003 0.0015 0.0021 0.0003 -0.0006 -0.0006 -0.0009 -0.0006
 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0006 -0.0006 0.0012 0.0024 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0012 -0.0009 -0.0003 -0.0003 -0.0012 -0.0006 -0.0009 -0.0009 -0.0006 0.0012 0.0021 -0.0006
 -0.0006 -0.0006 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 0.0000 0.0009
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0006 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006
 -0.0009 -0.0012 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0012 -0.0006
 -0.0009 -0.0006 -0.0006 -0.0006 -0.0012 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0003 -0.0012 -0.0006
 -0.0009 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0003 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0012 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009
 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0012
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0015 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006
Attachment 11: ER-580-290--30kV-m28-run3.txt
value (Voltage offset      40.0000)
     75.0000
      1.0000
     90.0000
  29963.3700
21
21
./emit.dat
 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0003 0.0006 0.0006 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0006
 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 0.0003 0.0012 0.0006 -0.0006 -0.0006 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009
 -0.0006 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 0.0000 0.0009 0.0009 0.0000 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0012
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 0.0006 0.0012 0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0003 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0012 -0.0012 -0.0006 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0006 0.0006 0.0012 0.0009 0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0003 -0.0009 0.0000 0.0009 0.0012 0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006
 -0.0006 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 0.0009 0.0009 0.0009 0.0009 -0.0009 -0.0012 -0.0006
 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0012 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 0.0000 0.0006 0.0009 0.0012 -0.0009 -0.0009
 -0.0012 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 0.0003 0.0006 0.0012 0.0000
 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0012 -0.0006 -0.0006 -0.0003 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 0.0000 0.0009 0.0009
 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 0.0000
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0009 -0.0012 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006 -0.0012 -0.0012
 -0.0009 -0.0009 -0.0009 -0.0003 -0.0006 -0.0009 -0.0006 -0.0006 -0.0015 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0006 -0.0012 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0012 -0.0012 -0.0012 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0012
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006 -0.0009 -0.0012 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009
 -0.0012 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009 -0.0006 -0.0009 -0.0012
Attachment 12: ER-580-290--30kV-m28-run4.txt
value (Voltage offset      40.0000)
     75.0000
      1.0000
     90.0000
  29963.3700
21
21
./emit.dat
 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0003 0.0018 0.0018 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 0.0000 0.0006 0.0027 0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0006 0.0000 0.0031 0.0024 0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0003 -0.0009 -0.0009 -0.0003 0.0024 0.0034 0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0006 -0.0006 -0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0012 -0.0006 0.0009 0.0037 0.0027 0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0003 -0.0009
 -0.0006 -0.0012 -0.0009 -0.0006 -0.0006 -0.0006 -0.0012 -0.0006 -0.0009 -0.0006 -0.0012 -0.0006 0.0003 0.0024 0.0034 0.0015 -0.0006 -0.0006 -0.0009 -0.0006 -0.0012
 -0.0009 -0.0009 -0.0006 -0.0006 -0.0003 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 0.0012 0.0027 0.0024 0.0003 -0.0006 -0.0006 -0.0006
 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 0.0003 0.0024 0.0027 0.0012 -0.0006 -0.0012
 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0003 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 0.0012 0.0024 0.0015 0.0000
 -0.0009 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0003 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006 -0.0009 0.0006 0.0024 0.0018
 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0006 -0.0012 -0.0009 -0.0006 -0.0006 -0.0009 -0.0006 -0.0012 -0.0006 -0.0009 -0.0009 0.0015
 -0.0009 -0.0006 -0.0012 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009
 -0.0009 -0.0003 -0.0009 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0012 -0.0006 -0.0009
 -0.0009 -0.0009 -0.0009 -0.0012 -0.0003 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0012 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0003 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006
 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0006 -0.0006 -0.0003 -0.0009
 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0009 -0.0012 -0.0012 -0.0006 -0.0009 -0.0009 -0.0012 -0.0012 -0.0009 -0.0006 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0003 -0.0006 -0.0009 -0.0006 -0.0009 -0.0012 -0.0006 -0.0009 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009 -0.0006
 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0006 -0.0006 -0.0009 -0.0009 -0.0009 -0.0015 -0.0009 -0.0009 -0.0009 -0.0003 -0.0009 -0.0009 -0.0009
 -0.0009 -0.0006 -0.0006 -0.0012 -0.0012 -0.0006 -0.0009 -0.0009 -0.0009 -0.0009 -0.0012 -0.0006 -0.0012 -0.0009 -0.0009 -0.0012 -0.0006 -0.0009 -0.0009 -0.0006 -0.0009
 -0.0006 -0.0012 -0.0009 -0.0006 -0.0009 -0.0006 -0.0006 -0.0006 -0.0006 -0.0009 -0.0006 -0.0012 -0.0009 -0.0006 -0.0006 -0.0009 -0.0003 -0.0003 -0.0006 -0.0009 -0.0009
  769   Friday, November 01, 2019, 16:01 Fernando Maldonado LP-SIS  41790-9 43515-9 In progressPeek seal tests on UCx#30 HS

Friday, November 01, 2019, 15:47: A symbiotic  peek seal assembly  was installed on the manipulator grip to verify the temperature at high voltage and high current.

Friday, November 01, 2019, 15:48: Three  thermocouples added for temperature readings.

Friday, November 01, 2019, 15:47: Roughing

Friday, November 01, 2019, 16:19: Turbos on.

Friday, November 01, 2019, 16:27: IG1 on.

Friday, November 01, 2019, 16:29: RGA on.


AS

Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.

Monday, November 04, 2019, 07:44: Power / sources on.

Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.

Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.

FM

Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.

Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.

Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.

Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.

Monday, November 04, 2019, 15:04:  Bias to 40 kV. One spark only. Seems stable now.

Sparks occurred sparsely. Max time without a spark was 26 minutes.

Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 16:16: RGA restart.


AS

Tuesday, November 05, 2019, 08:30: RGA Restarted.

Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.

Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.

Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.

Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.

Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.

Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.

Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.

Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.

Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.

Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.


Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.


Friday, November 15, 2019, 08:43: Venting.

 

 

Attachment 1: UC#30-plus-peak-seal.docx
Attachment 2: TS-2019-11-01-16-22.rga
Attachment 3: TS-2019-11-04-16-12.rga
Attachment 4: TS-2019-11-05-08-30.rga
  770   Friday, November 08, 2019, 14:21 Aaron Schmidt LP-SIS  41790-943515-9In progressNitrogen Bottle leak test

Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38

4.8 Purity

35-40 PSI pressure.

Successfully purged the line after 5 minutes.


Friday, November 08, 2019, 14:16: Begin FS#5 waterline purge w/ Nitrogen. Purge done in conjunction with UC#30 HS & assy.

4.8 Purity

12-14 PSI line pressure.

2500 PSI bottle pressure.

Full stream for a minute or so, then purged lightly. Drops / mist outgoing.

Friday, November 08, 2019, 14:24: Line Pressure at 10-11 PSI, brought back up to 14 PSI.

2400 PSI bottle pressure. Water / mist outgoing still.

Friday, November 08, 2019, 14:31: No water appears on line with purge.

Approx 2350 PSI bottle pressure.

Line pressure increased to 40 PSI. No water appeared on the purge line.

Friday, November 08, 2019, 14:34: Purge complete. 14 PSI appears successful.