ID Date Author Category Typedown Subject Text Attachments
  97   Tuesday, March 07, 2017, 09:31 Jason KapalkaShieldingStandard OperationBlockers/Shields/Covers/LaddersThe seven copper blockers were removed from
the Cyclotron tank by the RH group using
the service bridge, lift 
 Checklist_for_Cyclotron_Shields_and_Blocks_and_Porthole_Covers_(Rev4_As_Run_2017).pdf 
  98   Tuesday, March 14, 2017, 11:23 Jason KapalkaCyclotronStandard OperationStart/end of shutdown photo and video surveyThe start of shutdown photo and video survey
was performed in the Cyclotron tank by the
RH group using the 
 Cyclotron_Video_Inspecting_Guidelines_(RevX_20170314).xlsx 
  99   Tuesday, March 14, 2017, 12:02 Jason KapalkaCyclotronStandard OperationRadiation surveyThe unshielded radiation survey was performed
in the Cyclotron tank by the RH group using
the service bridge, 
 Procedure_for_Cyclotron_Tank_Radiation_Survey_by_Don_Jackson_(20000106_Obsolete).doctankworkssubplot.m2017_01_30_shields_out_tank_superimposed.png2017_02_02_shields_in.png 
  102   Tuesday, March 14, 2017, 17:57 Jason KapalkaCyclotronStandard OperationLid raising and lowering operationsLid up (Attempt #1)

Pre-indexed 
  
  103   Monday, January 08, 2018, 09:04 Maico Dalla Valle / Jason KapalkaCyclotronStandard OperationCyclotron Lid UpRemote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20180223.xlsx 
  104   Tuesday, January 09, 2018, 15:54 Jason KapalkaCyclotronStandard OperationLid-up sequence (in-tank work)2018-01-09
07:00-10:00 - Pre-job meeting, informed main
control room of operation startup, lowered
  
  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work All cyclotron in tank work has been
completed.
  
  106   Thursday, January 25, 2018, 17:16 Isaac EarleCyclotronStandard OperationHE1 probe removed The HE1 probe was removed from the
cyclotron today using the procedure in Document
126165.  The reason for removal is so
  
  107   Wednesday, January 31, 2018, 11:20 Isaac EarleCyclotronStandard OperationHE1 probe reinstalled HE1 probe was reinstalled in the
cyclotron this morning as per the procedure
in Document 126165.  Hardware for the
  
  111   Tuesday, April 03, 2018, 11:57 Travis CaveCyclotronStandard OperationBlue Shield Door Shut. The Blue Shield Door on the B2 level
of the RH building has been closed.
  
  115   Thursday, January 30, 2020, 06:55 Dan McDonaldCyclotronStandard OperationLid up operationsLid up operations took place on January
21st starting at 10:25 lid went up without
issue. Couple things to note are station
 lid_up_2020.xlsx 
  120   Saturday, April 04, 2020, 09:47 Dan McDonaldCyclotronStandard OperationLid down operationsLid down operations for 2019/2020 shutdown
went ahead as planned on March 10th 2020
with Dan Louie and Arthur Leung absent due
 lid_down_2020.xlsx 
  127   Friday, January 22, 2021, 14:30 Adam NewsomeCyclotronStandard OperationLid up operation - 2021The lid
up operation took place on Jan. 22, 2021.
The
  
  131   Thursday, April 01, 2021, 13:47 Adam NewsomeCyclotronStandard OperationVault Shield Door ClosedThe vault shield door has been closed and
seal inflated. The operation was performed
with no issue. 
  
  136   Wednesday, January 19, 2022, 09:50 Travis CaveShieldingStandard OperationShield door is now open The shield door is now open on the
RH B2 level.
  
  137   Friday, February 04, 2022, 11:52 Adam NewsomeCyclotronStandard OperationLid up operation - 2022The lid up operation
took place on Feb. 4, 2022. 
  
  140   Wednesday, April 27, 2022, 16:05 Adam NewsomeCyclotronStandard OperationLid down operation - 2022The lid down operation
took place on Apr. 27, 2022. 
  
  144   Tuesday, May 10, 2022, 11:31 Nadia JorgensonCyclotronStandard OperationVault Shield Door Closed The vault shield door
has been closed and seal inflated. The operation
  
  148   Monday, January 30, 2023, 12:20 Adam NewsomeCyclotronStandard OperationLid up operation - 2023 The lid up operation
took place on Jan. 30, 2023. 
 2023_Synchro_Counts.xlsx2023_Jacks_Infrared_Data.xlsx 
  152   Friday, March 31, 2023, 13:22 Adam NewsomeCyclotronStandard OperationLid down operation - 2023The lid down operation
took place on Mar. 31, 2023. 
 Elevation_System_Checklist_-_March_31_2023.pdf 