  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder
  
  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit
  
  179   Friday, May 31, 2024, 12:47 Riley SykesTrolleys servicedMaintenanceTool Trolley Scheduled Maintenance 60 month service completed. Bearings
for drive motor wheels regreased, Reducer
repacked with Molub Alloy 777-1 ES,
 Tool_Trolley_Drive_Motor.jpg 
  180   Monday, June 03, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceUpper Resonator Trolley 24 Month, 60 month
service completed. Bearings for drive motor
  
  181   Tuesday, June 04, 2024, 14:29 Riley SykesTrolleys servicedMaintenanceLower Resonator Trolley  12, 24 and 60   
  182   Wednesday, June 12, 2024, 10:35 Riley SykesTrolleys servicedMaintenanceOutriggers 1 and 2 Service 1,2 and 5 Year service completed.
Vertical ball screws and chains inspected
and regreased with Chemours Krytox EG 2000
  
  183   Friday, June 14, 2024, 10:04 Riley SykesService BridgeMaintenanceService/ Bridge inspection Yearly, 2 Year and 5 Year service
completed. All bearings on support frames
turn freely and were regreased with Molub
  
  184   Monday, June 24, 2024, 12:53 Riley SykesElevation JackMaintenanceHighfield Service Highfields 7A,7B post shutdown service
complete. Oil change completed, new Mobil
600 W Super Cylinder oil added. Sample collected
  
  186   Tuesday, July 23, 2024, 13:27 Riley SykesCarrierMaintenanceService/Maintenance checks 1,2, 5 Year Service and maintenance
package completed on Carrier. All reducers
repacked with Molub-Alloy 777-1 ES grease.
  
  188   Wednesday, July 24, 2024, 14:26 Riley SykesElevation JackMaintenanceService inspection and relubrication Jack 7R pulled apart and inspected
for deficiencies, all parts deemed to be
in working order, jack was rebuilt and lubricated
  
  189   Wednesday, August 07, 2024, 14:24 Riley SykesElevation JackMaintenanceService inspection and relubrication  Jack 7L pulled
apart and inspected for deficiencies, alignment
  
  194   Monday, January 20, 2025, 13:55 Adam NewsomeElevation JackMaintenanceElevating System MRO - 2025Elevating System MRO was started Jan. 16
by R. Sykes, M. Dalla Valle, P. Hall-Patch
under work permit C2025-01-16-3.
 Elevation_System_Checklist_-_2025.xlsxPXL_20250117_171031446.MP.jpgCyclotron_Jacks_History_-_updated_2025-01-24.xlsx 
  196   Friday, January 31, 2025, 13:41 Riley SykesElevation JackMaintenanceSpare Highfield units 13L/R Both spare #13 Highfields inspected
and serviced. New oil added Jan 30 2025.
All in working order and ready for operation
  
  198   Tuesday, February 25, 2025, 12:00 Riley SykesElevation JackMaintenanceHighfield 5 L/R Both Highfields from unit 5 have
been removed, serviced and new lubrication
added. 5R Worm Wheel has intermittent pitting
 Image_(6).jfifImage_(5).jfifImage_(4).jfif 
  200   Wednesday, March 26, 2025, 10:07 Riley SykesElevation JackMaintenanceScrewjack 5 L/R Both L and R of screwjack sets #5
have been inspected, serviced and lubricated.
All in working order, no deficiencies present
  
  46   Tuesday, January 13, 2015, 16:46 Grant MinorElevation JackDevelopmentUpper Bearing Fall Protect Guardrails TRH1217 Installed on Stns 8,10, 3, 4 & 55 x TRH1217 Upper Bearing Service Platform
assemblies were installed between January
6th and January 13th at Stations 8, 10, 3,
 9x 
  75   Tuesday, January 19, 2016, 17:59 Grant MinorElevation JackDevelopmentUpper Bearing Fall Protection Installation - Stations 1, 2, 6, 7, 8, 11, & 12The installation of the upper bearing fall
protection equipment was completed last week
by Dan and Maico.
 22x 
  86   Wednesday, March 09, 2016, 17:09 Ron KuramotoCyclotronDevelopmentEX4N new housing installationThe new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3
 dspage07994143927104268192.pdfExtr_4N_Final_instalation_-_gimbal-pipe-valve.docxIMG_1886.JPG 
  116   Monday, February 03, 2020, 11:06 Adam NewsomeCyclotronDevelopmentPorthole Cover Handling Tool - Initial Test ReportThe suction-cup based porthole cover handling
tool (TRH1366) was tested for the first time
inside the cyclotron as part of the regular
 IMG_20200128_114901.jpg 
  117   Wednesday, February 05, 2020, 12:37 Adam NewsomeCyclotronDevelopmentCyclotron Vacuum Cleaning Tool - Initial TestThe vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed:
 IMG_20200205_093927.jpg 